Renovating a condo is as much about the building as the unit. Management approval, work hours, elevator bookings, fixed plumbing stacks and flooring rules all shape what you can do and when. We renovate condo kitchens, bathrooms and full units across Toronto and the GTA.
Condo units are compact, so every decision counts: a kitchen that opens to the living room, storage built into the walls, a bathroom that works for two, and flooring that runs through without transitions.
The limits come from the building. What is inside your unit is usually yours to change; anything that touches common elements, shared plumbing or the structure needs the condo corporation’s approval.
Most condo projects include one or more of these.
New layouts that stay close to the plumbing stacks, custom cabinetry, counters, lighting and a quieter range hood.
Tub-to-shower conversions, vanities and tile, waterproofed so nothing reaches the unit below.
Hardwood, engineered or vinyl plank laid through the unit without transitions, over the underlay your building approves.
Kitchen, bathrooms, flooring, lighting, doors and paint planned and built as one project.
Closet systems, built-in wall units and cabinetry that make small rooms work harder.
New fixtures, bulkheads for recessed lights and new circuits, by licensed electricians under an ESA permit.
Usually yours to change:
Usually not, or only with approval:
Kitchens and bathrooms can shift a little, but they stay close to the existing plumbing stacks. Drains need slope, and there is very little room under a concrete floor to run new pipes.
Walls work the same way: drywall partitions can often come out with approval, but concrete walls, shear walls and walls carrying shared pipes or ducts stay. More in Can I remove walls in a condo?
Water is the other risk, because a leak lands in the unit below. Shower floors and walls are waterproofed under the tile, and new plumbing is pressure-tested before the walls close.
Most Toronto condo buildings require notice or written approval before you renovate. Changes that affect the common elements can need a formal agreement with the corporation under Ontario’s Condominium Act, so check your declaration, by-laws and rules before the design is final.
Expect conditions:
Approval can take weeks in some buildings, so the package goes in as soon as the design and selections are settled, not the week before demolition. We prepare our part of it, including our $5M liability insurance and WSIB certificates.
The work: a written description of the renovation and a layout or drawings showing what changes.Flooring: the flooring and underlay specification with its acoustic rating, so the unit below does not hear every step.The people: the contractor’s certificate of insurance and WSIB clearance, and the licensed trades for plumbing and electrical work.The schedule: work hours, elevator bookings and the route for bringing materials in and taking debris out.
Tell us the building, the size of the unit and the rooms you want to change. We will say what is realistic, and what management is likely to ask for, before we book a visit.
Condo ceilings are concrete slabs, often post-tensioned with steel cables inside, so cutting into them for pot lights is usually not allowed. Recessed lights go into a new bulkhead or dropped ceiling where they matter most; track or surface-mounted fixtures do the rest.
The fan coil or heat pump that heats and cools the suite, and its ducts, generally stay where they are and must stay accessible for servicing. Noisy work, such as demolition and tile cutting, happens within the building’s permitted hours.
If a tenant lives in the unit, Ontario’s tenancy rules apply to renovations, so get advice before planning work that needs the unit empty.
Board approval and elevator bookings apply to a pre-sale refresh too, so build them into the listing date.
We see the unit, go through the building’s renovation rules with you and note what management will need from us.
Layout and selections, then the package management needs to approve the work.
Elevator bookings, work hours and protection of common areas arranged with management.
Demolition, rough-in and finishes within the building’s hours, with the unit sealed to keep dust out of the hallway.
Common areas left the way we found them and debris removed through the approved route.
A walkthrough with you, deficiencies closed and the warranty in writing.
A full condo renovation fits a house-sized project into a unit and a building with rules. The scope usually covers:
Flooring is the most common reason a condo renovation gets delayed, because sound travels easily through concrete to the unit below. Most buildings set rules for it:
We confirm the flooring rules before you choose a product, so there is no need to change it after delivery.
A condo renovation timeline has two parts: the time waiting for the building, and the time building.
If you plan to stay in the unit during the work, see can you live in your home during a renovation.
In a condo, the contractor also deals with your property manager, your neighbours and the building staff. Before you sign, ask:
As a condo renovation contractor in Toronto, we plan around your building’s rules from the first visit, so the work is approved before it starts and finished within the hours the building allows.
Where we work: across Toronto and the GTA, including North York, Vaughan, Richmond Hill, Markham, Newmarket and King City.
Usually, yes. Most buildings require notice or written approval before work starts, and changes to common elements can need a formal agreement with the corporation. Your declaration and rules say what applies. We help prepare the package.
Sometimes. Non-structural drywall partitions can often come out with approval; concrete and shear walls cannot. See Can I remove walls in a condo?
Only a little, because they have to stay near the existing stacks. We show you what is realistic for your unit at the site visit.
Most buildings allow hardwood, engineered or vinyl plank as long as the underlay meets their acoustic requirement. We check your building’s rules before you choose.
Size, scope (one room or the whole unit), finish level and the building’s requirements drive it. Condo work can cost more per square foot than a house because of restricted hours and access. You get a written quote after a site visit.
A kitchen or bathroom usually takes a few weeks on site; a full unit takes longer. Approval and booking time with management comes first, so start that early.
Yes, both, in the form management asks for, before work starts.
Sometimes. Board approval is about the building’s rules; a City building permit is still needed when plumbing moves, walls come out or the work affects fire separations, and electrical work needs an ESA permit. Cosmetic work usually needs only the building’s approval.
Usually not by cutting into the concrete. A bulkhead or dropped ceiling can take recessed lights; otherwise track and surface-mounted fixtures.
Usually the owner who had the work done, under the building’s alteration or indemnity agreement, which is why management asks for your contractor’s insurance certificate before work starts. Tell your own unit insurer about the renovation as well.
For a bathroom or a kitchen alone, often yes, with some inconvenience. For a full-unit renovation, most owners stay elsewhere, because water, power and the kitchen are out of service at times.
Share your unit, what you want to change and your building’s renovation rules or alteration agreement. We will tell you what is realistic and what management will need from us before work can start.