Home renovation / Richmond Hill

Home renovation Richmond Hill

Kitchens, bathrooms, basements, whole interiors and added units in Richmond Hill houses, planned around the City’s new zoning by-law, its 15 cm tree rule and, north of the city, the Oak Ridges Moraine.

$5M Liability Insurance
WSIB Coverage
Licensed Trades
Permit Coordination
2-Year Workmanship Warranty
Renovating in Richmond Hill

Whole-house interiors, planned floor by floor

Most of our Richmond Hill work has been whole interiors. At 84 Don Head Village Blvd the main floor, second floor and basement were renovated together; at 5 Canyon Hill Ave outdated structures came out and the washrooms and floors were redone.

Planning the floors together means the structure, wiring and plumbing are opened once, and the finishes match from the basement up.

The tree rule

The 15 cm tree rule in Richmond Hill

Richmond Hill requires a permit to remove or injure any private tree 15 cm or more across, measured 1.4 m above the ground. Injury includes cutting more than 20% of the live tissue in a year, or any work inside the tree’s protection zone.

That zone is a radius from the trunk: 2.0 m for a 15 to 20 cm tree, 2.4 m up to 40 cm, and 6.0 m by 100 cm. A walkout, a footing or a new driveway inside it needs planning first.

Permits start at $314 plus HST, and removed trees are replaced or paid for at $945 each.

01
15 cm at 1.4 m
02
Tree protection zone
03
Permit from $314
04
Replacement trees
05
$945 cash-in-lieu
A new zoning by-law

One zoning by-law in place of at least 35

For decades, Richmond Hill was zoned by at least 35 separate parent by-laws, each covering its own part of the city, some dating from the 1950s and 1960s.

Council passed Comprehensive Zoning By-law 93-25 on September 24, 2025. It was appealed, and on July 2, 2026 the Ontario Land Tribunal approved it in part. Some lands are still under active appeal, shown on the City’s map.

Before an addition, a new entrance or a new unit is designed, we confirm which rules apply to your lot, through the City’s zoning information request where needed.

Additional residential units

Up to four homes on one Richmond Hill lot

By-law 143-24 allows up to three additional units with the main house, four units on the lot at most and no more than two in a separate building, on lots with municipal water and sewer.

01

A Unit in the Basement

A self-contained unit with its own kitchen, bathroom and sleeping area, fire-separated from the house.

02

A Unit Above a Detached Garage

A unit in a separate building on the same lot; a new structure over 400 sq ft also needs a Site Alteration Permit.

03

A Detached Unit From City Plans

The City’s pre-approved detached unit, about 6.64 m by 5.47 m, still submitted with a site plan and setbacks.

04

Drawings the City Asks For

Sealed site plan, floors, elevations and sections, plus mechanical drawings with heat loss and gain calculations.

05

TRCA and Site Plan Control

TRCA approval on regulated lots, and a signed site plan agreement where site plan control applies.

06

Occupancy Before Move-In

Staged inspections, then the City’s occupancy permit before anyone lives in the unit.

Before design

Send the address and we will check the trees and the zoning first

A tree near the work, a lot under appeal or on the moraine can change what is possible. Send the address and a few photos, and we will tell you what applies before we visit.

North of the city

Renovating on the Oak Ridges Moraine

The northern half of Richmond Hill sits on the Oak Ridges Moraine, whose groundwater feeds the Humber, Rouge and Don rivers. A provincial conservation plan limits development there, and valleys, wetlands and slopes are regulated by TRCA.

An interior renovation is rarely affected. An addition, a detached unit, a walkout or new grading on a lot near a valley or wetland may need a TRCA permit before the building permit, so we check the lot first.

Richmond Hill keeps a Heritage Register. Owners of a listed property must notify the City at least 60 days before applying for a demolition permit.

A designated property needs a Heritage Permit, approved by Council, before work that affects the reasons it was designated.

What we renovate

Kitchens, bathrooms and basements in Richmond Hill houses

  • Kitchens with custom cabinetry, like Don Head Village Blvd
  • Bathrooms and washrooms, like Canyon Hill Ave
  • Basements, finished or turned into a unit
  • new flooring and finishes through the whole house

Adding space instead? A rear or second-storey addition is planned under the new zoning by-law and around the trees on the lot; see home additions.

How a Richmond Hill project runs

The steps from first visit to occupancy

01

Site Visit and Tree Check

We see the house, measure any tree near the work and note what the City will need.

02

Zoning Confirmation

Which by-law applies to the lot, and whether it is under appeal, before design.

03

Sealed Drawings

Drawings by a qualified designer, with mechanical drawings and heat loss calculations for new units.

04

TRCA, Tree and Site Alteration Permits

Any permits the lot needs, then the building permit and the ESA permit.

05

Staged City Inspections

Construction booked around the Building Division’s inspections at each stage.

06

Occupancy and Handover

The occupancy permit for a new unit, a walkthrough and the warranty in writing.

Frequently asked questions

What Richmond Hill homeowners ask us

Yes, for any private tree 15 cm or more across, measured 1.4 m above the ground. The fee is $314 plus HST for the first tree.

Outside its protection zone, which runs from 2.0 m for a 15 to 20 cm tree to 6.0 m for a 100 cm tree. Work inside it counts as injury and needs a permit.

Up to three additional units with the main house under By-law 143-24, four on the lot at most, and no more than two in a separate building.

Comprehensive Zoning By-law 93-25, approved in part by the Ontario Land Tribunal in July 2026. Some lands are still under appeal, so we confirm it for your address.

If it is in the northern half of the city, it may be. Interior work is rarely affected; additions, grading and walkouts near valleys or wetlands can need a TRCA permit.

Yes. The City offers a pre-approved detached unit of about 6.64 m by 5.47 m; you still submit a site plan showing its location and setbacks.

Yes. After the staged inspections, the City issues an occupancy permit before the unit is lived in.

It depends on the size, the scope and the finishes, and on any permits the lot needs. You get a written quote after a site visit.

Professional credentials
Accredited excellence. Trusted craftsmanship.

Credentials and memberships that stand behind our Richmond Hill projects.

Your project

Book a site visit in Richmond Hill

We look at the house and the lot with you, talk through what you want and the budget, and follow up with a written quote.

Google reviews

What our clients say on Google