Route Homes cost guide · October 2026

Custom home cost Toronto: 2026 prices to build a new house

Building a custom home in the Toronto area costs about $500 to $1,130 per sq ft in 2026, or $1.5M to $3.39M for 3,000 sq ft, for construction alone. Demolition, design, City fees and HST come on top; land is separate. Approximate, not a quote.

$5M Liability Insurance
WSIB Coverage
Licensed Trades
Permit Coordination
2-Year Workmanship Warranty

Toronto custom home costs at a glance

  • Construction: $500 to $1,130 per sq ft, the Altus Group 2026 range for custom homes in the GTA
  • A 3,000 sq ft house: $1.5M to $1.95M standard, $1.95M to $2.7M premium, $2.7M to $3.39M luxury
  • All in, 3,000 sq ft standard, replacing a house: about $2,167,000 to $3,174,000 with site work, design, fees, a 15% contingency and HST
  • Development charges: $0 in most cases when you replace a house; $55,138 on a vacant lot after the 2026 cut
  • HST: 13% on construction; the Ontario owner-built rebate returns up to $16,080 in most cases; larger rebates need the house and land under the value limits
  • Time: 10 to 18 months of construction after design and permits

These are approximate planning ranges, not a quote. For your own lot, book a free site visit below or call (416) 834-2444.

Free estimate

Get a free, itemized custom home estimate

These ranges are a starting point. For your own lot, we review the zoning, the trees and the services, then send a written price, line by line, like the tables on this page.

Free, with no obligation. Prefer to talk? Call (416) 834-2444.

Per square foot

Custom home cost per square foot in Toronto, by tier

A standard custom home costs about $500 to $650 per sq ft to build, a premium one $650 to $900 and a luxury one $900 to $1,130. The tier is set mostly by the envelope, the ceiling heights and the millwork.

How to read this table: Rows are tiers; the second column is construction cost per square foot of the house above grade.

Route Homes planning estimates from the Altus Group 2026 cost guide and published builder ranges, October 2026, before HST. Not a quote. Per sq ft of floor area above grade, finished basement included.
TierConstruction per sq ftWhat it usually looks likeTypical buyer
Standard custom$500 to $650Brick or stone front, 9-foot ceilings, engineered hardwood, semi-custom kitchen, quartzFamilies replacing an older house on their own lot
Premium custom$650 to $900Full stone or stucco, 10-foot main floor, custom kitchen and millwork, heated floors, larger windowsOwners building the house they plan to keep
Luxury custom$900 to $1,130Architect-led design, steel beams for open spans, imported stone, home automation, walk-out basementPrime streets where the house matches the lot value

Who each tier suits

  • Standard custom: a well-built family home with good finishes, on a regular lot.
  • Premium custom: higher ceilings, more stone and custom millwork.
  • Luxury custom: architect-led houses where structure and glass, not only finishes, drive the price.

Where these numbers come from

How to read this table: Each row is one source; the third column says what its range covers.

Published 2026 figures; builders’ ranges are their own claims, collected October 2026.
SourceRange per sq ftWhat it covers
Altus Group 2026 Canadian Cost Guide (GTA, custom-built single family, hard costs)$500 to $1,130Hard construction cost; excludes land, soft costs, taxes, development charges and professional fees
Toronto builders’ published 2026 guides$350 to $1,000 and moreConstruction only, three or four tiers; compare what each one includes
This guide$500 to $650 / $650 to $900 / $900 to $1,130The Altus range, split where builders publish their tier breaks

Why our low end is $500

  • Altus Group prices construction the way quantity surveyors do, independently of any builder; its 2026 low end for a custom house in the GTA is $500 per sq ft.
  • A lower quote is possible, but check what it leaves out: demolition, services, project management or allowances that are too small.
By house size

Cost to build a 2,000 to 6,000 sq ft house in Toronto

A 3,000 sq ft custom home costs about $1.5M to $1.95M to build at a standard tier; a 4,000 sq ft one $2M to $2.6M. Every row is the size times the tier’s rate.

How to read this table: Rows are house sizes above grade; each cell is the size times the tier’s rate.

Route Homes planning estimates from the Altus Group 2026 cost guide and published builder ranges, October 2026, before HST. Not a quote. Construction only: land, demolition, design, fees and HST are separate.
House size (above grade)Standard customPremium customLuxury custom
2,000 sq ft$1M to $1.3M$1.3M to $1.8M$1.8M to $2.26M
2,500 sq ft$1,250,000 to $1,625,000$1,625,000 to $2,250,000$2,250,000 to $2,825,000
3,000 sq ft$1.5M to $1.95M$1.95M to $2.7M$2.7M to $3.39M
3,500 sq ft$1,750,000 to $2,275,000$2,275,000 to $3,150,000$3,150,000 to $3,955,000
4,000 sq ft$2M to $2.6M$2.6M to $3.6M$3.6M to $4.52M
5,000 sq ft$2.5M to $3.25M$3.25M to $4.5M$4.5M to $5.65M
6,000 sq ft$3M to $3.9M$3.9M to $5.4M$5.4M to $6.78M

How the price grows with size

  • Every extra 500 sq ft adds about $250,000 to $325,000 standard, $325,000 to $450,000 premium and $450,000 to $565,000 luxury.
Line by line

Where the money goes in a 3,000 sq ft custom home

The structure and the envelope, from the foundation to the cladding, take about 48% of the construction budget. Interior finishes, from flooring to cabinets, take about 13%.

How to read this table: Rows are the parts of the house; each column adds up to the 3,000 sq ft row.

Route Homes planning estimates from the Altus Group 2026 cost guide and published builder ranges, October 2026, before HST. Not a quote. Shares follow a breakdown published by a Toronto builder in 2026, with 8% for project management.
Line itemWhat it coversStandardPremiumLuxury
Excavation, footings, foundation and basement floorDigging, footings, foundation walls, waterproofing, the basement slab$170,000 to $225,000$225,000 to $310,000$310,000 to $390,000
FramingFloors, walls, stairs, roof structure, sheathing$235,000 to $305,000$305,000 to $420,000$420,000 to $530,000
Roof, soffits and eavestroughsRoofing, flashing, soffit, fascia, gutters$125,000 to $160,000$160,000 to $225,000$225,000 to $280,000
Windows and exterior doorsWindows, patio doors, the front entry$90,000 to $115,000$115,000 to $160,000$160,000 to $205,000
Exterior claddingStone, brick, stucco or siding on every wall$95,000 to $125,000$125,000 to $175,000$175,000 to $220,000
PlumbingDrains, water lines, fixtures, the water heater$70,000 to $90,000$90,000 to $125,000$125,000 to $155,000
ElectricalPanel, wiring, lighting, low-voltage$70,000 to $90,000$90,000 to $125,000$125,000 to $155,000
Heating, cooling and ventilationDuctwork, furnace or heat pump, air conditioning, HRV$85,000 to $110,000$110,000 to $150,000$150,000 to $185,000
Insulation and air sealingInsulation to the energy code, vapour barrier$70,000 to $90,000$90,000 to $125,000$125,000 to $155,000
Drywall and paintDrywall, taping, primer and paint$125,000 to $160,000$160,000 to $225,000$225,000 to $280,000
Flooring and tileHardwood, tile and stair finishes$95,000 to $125,000$125,000 to $175,000$175,000 to $220,000
Interior doors and trimDoors, casings, baseboards, millwork$40,000 to $55,000$55,000 to $75,000$75,000 to $95,000
Kitchen and bathroom cabinets and countersCabinets, vanities, counters$55,000 to $70,000$70,000 to $100,000$100,000 to $125,000
Decks, porches and railingsRear deck, front porch, railings$55,000 to $70,000$70,000 to $100,000$100,000 to $125,000
Project management and site costsSupervision, scheduling, insurance, site services, inspections$120,000 to $160,000$160,000 to $210,000$210,000 to $270,000
Total, 3,000 sq ft custom homeEquals the 3,000 sq ft row$1.5M to $1.95M$1.95M to $2.7M$2.7M to $3.39M

Which lines move the most

  • Framing and the foundation are the largest lines and depend on the design and the soil, not the finishes.
  • Cladding, windows and the roof show the tier from the street: stone and large windows cost much more than brick and standard sizes.
Your lot, your number

Want a price for your lot, not a range?

Book a free site visit. We look at the lot, the house you are replacing and the services, and send a written, itemized estimate. Prefer to talk? Call (416) 834-2444.

Site costs

Demolition, services and other site costs

Replacing a house adds demolition and disconnections; every new house needs a new water service and its own hydro and gas. These costs sit outside the per-square-foot rate.

How to read this table: Rows are costs around the house itself; the third column says when each one applies.

City fees are the 2026 schedules; they change every January.
Site costPlanning rangeWhen it appliesSource
Demolition and disposal of the old house$25,000 to $75,000Replacing a housePublished by Toronto builders, 2026
Designated substance survey and abatement planning, demolition paperwork$3,000 to $8,000Replacing a housePublished by Toronto builders, 2026
Turn off and disconnect the old water service$110.13 + $1,739.74Replacing a houseToronto Water 2026 fees
New 25 mm water service and meter$6,818.29Every new houseToronto Water 2026 fees
Inspection to reuse the existing sewer connection$735.81When the old connection can be reusedToronto Water 2026 fees; a new connection is charged at the City’s actual cost
Hydro and gas servicesset by Toronto Hydro and EnbridgeEvery new houseQuoted by the utility for the address
Tree removal, if approved$583 per tree cash-in-lieu if not replanted, plus the City’s application feeTrees 30 cm and wider at 1.4 mCity of Toronto Urban Forestry
Crane on a tight lot$8,000 to $40,000No room to stage materialsPublished by Toronto builders, 2026
Landscaping and driveway$30,000 to $200,000 and moreEvery new housePublished by Toronto builders, 2026
Fees and charges

Permit fees, development charges and Tarion enrolment

Replacing a house usually pays no development charges, because the City credits the house that was demolished. On a vacant lot the charge is $55,138 after the 2026 cut, the largest single fee.

How to read this table: Rows are City charges and Tarion; the notes give the rule behind each amount.

Official 2026 figures except where marked published.
Fee or chargeAmount (2026)Notes
Building permit, new house$18.56 per m²; about $5,173 for 3,000 sq ftCity of Toronto Building Permit Fees, 2026
Demolition permit$214.79 minimum ($0.18 per m²)Most houses pay the minimum
Zoning certificate, where required$644.38Houses and additions, 2026
Development charges, replacing a house$0 in most casesCredit for the demolished house when the complete permit application follows within 60 months of the demolition permit (Municipal Code ch. 415)
Development charges, vacant lot$55,138 (full: $137,846)60% cut under By-law 1261-2026 when the first building permit is issued from March 30, 2026 within the program
Education development charge (TCDSB)$3,893 per house; $4,193 from December 3, 2026Collected by the City at the first above-grade permit; ask the TCDSB whether a replacement house is exempt
Tarion enrolment$2,245 to $5,680 for contracts of $1M to $4MPlus HST; set by contract price; paid by the builder before the foundation
Minor variance (Committee of Adjustment)$5,000 and more, only if neededPublished, 2026

What the fees show

  • The development charge decides more than any other fee: zero for most replacement houses, $55,138 on a vacant lot.
  • Permit and Tarion fees are a few thousand dollars each; design and engineering cost far more.

Design and engineering

A house within Part 9 of the Building Code can be designed by a BCIN-qualified designer instead of an architect.
Design and engineeringPlanning rangeSource
Design and engineering together8% to 12% of constructionPublished by Toronto builders, 2026
Architect alone5% to 15% of constructionPublished by Toronto builders, 2026
Structural engineering$5,000 to $25,000Published by Toronto builders, 2026
Mechanical and electrical design$3,000 to $15,000Published by Toronto builders, 2026
Topographic survey$2,000 to $5,000Published by Toronto builders, 2026
HST and rebates

HST on a custom home, and the rebates you can claim

HST of 13% applies to building a custom home on your land. The Ontario rebate for owner-built houses returns up to $16,080; the larger 2026 rebates depend on the value of the house and land together.

How to read this table: Each row is one rule; the right column says what it changes for a house built on your land.

Canada Revenue Agency, RC4028 (owner-built houses), read October 2026. Apply with Form GST191 within the CRA’s deadline.
RuleWhat it means for a custom home
13% HST on the construction contractPaid during construction on the builder’s invoices and on design fees
Ontario rebate for owner-built houses75% of the 8% provincial part, up to $16,080 (up to $24,000 if HST was paid on the land); no value limit
Federal new housing rebateNot available when the house and land are worth $450,000 or more
First-Time Home Buyers’ GST/HST rebateUp to $50,000 for a first-time buyer; construction started on or after March 20, 2025; full under $1M of value, reduced to $1.5M
Ontario enhanced rebate, 2026Up to $80,000 of the provincial part when construction began from April 1, 2026 to March 31, 2027 and the value is under $1.85M
How value is measuredFair market value of the house and the land, when construction is substantially complete

In short

  • The Ontario owner-built rebate has no value limit; the larger rebates depend on the house and land together being under the limits.
All-in budget

A full custom home budget, from construction to HST

A standard 3,000 sq ft custom home comes to about $2,167,000 to $3,174,000 all in when it replaces a house, and $2,184,000 to $3,119,000 on a vacant lot, before land and financing.

How to read this table: Each row is one part of the budget; the two columns compare replacing a house with building on a vacant lot.

Route Homes planning estimate, October 2026. Each row is rounded to the nearest $1,000 and the total is the sum of the rows. City fees: building permit $5,173, demolition permit $214.79 and TCDSB $3,893 when replacing a house; building permit, development charge $55,138 and TCDSB on a vacant lot. Land, financing, carrying costs and furniture are not included.
3,000 sq ft standard custom homeReplacing a houseOn a vacant lot
Construction$1,500,000 to $1,950,000$1,500,000 to $1,950,000
Site: demolition and old services (replacing only), new water service, landscaping$67,000 to $292,000$37,000 to $207,000
Design and engineering, 8% to 12% of construction$120,000 to $234,000$120,000 to $234,000
City fees and charges$9,000$64,000
Tarion enrolment$2,000 to $3,000$2,000 to $3,000
Contingency, 15% of construction and site$235,000 to $336,000$231,000 to $324,000
HST, 13% of construction, site, design, Tarion and contingency$250,000 to $366,000$246,000 to $353,000
Less the Ontario owner-built rebate (no HST paid on the land)-$16,000-$16,000
Total before land and financing$2,167,000 to $3,174,000$2,184,000 to $3,119,000

What the budget shows

  • Demolition costs about as much as the development charge it avoids, so replacing a house and building on a vacant lot end up close.
  • Contingency and HST add about 30% to construction and site work; plan the cash for both.

Also outside the construction rate

Not in the construction ratePlanning rangeSource
Appliances, standard package$12,000 to $20,000As in our kitchen cost guide
Appliances, luxury package$35,000 to $70,000As in our kitchen cost guide
Window coverings, furniture, decoryour own choices
Land, financing, carrying costsyour own numbersInterest, taxes and rent while you build
Worked examples

Three custom home budgets, from estimate to total with tax

A standard 2,500 sq ft custom home comes to about $1,625,000 to $2,112,000 with a 15% contingency and HST; a luxury 5,000 sq ft home $5,848,000 to $7,342,000.

How to read this table: Each row starts from the size table, adds a 15% contingency, then 13% HST.

Route Homes planning estimates from the Altus Group 2026 cost guide and published builder ranges, October 2026, before HST. Not a quote. Construction only; the all-in table above adds site work, design and fees.
Budget exampleConstruction estimateWith 15% contingencyWith HST (13%)
2,500 sq ft, standard custom$1,250,000 to $1,625,000$1,438,000 to $1,869,000$1,625,000 to $2,112,000
3,500 sq ft, premium custom$2,275,000 to $3,150,000$2,616,000 to $3,622,000$2,956,000 to $4,093,000
5,000 sq ft, luxury custom$4.5M to $5.65M$5,175,000 to $6,497,000$5,848,000 to $7,342,000
Renovate or rebuild

Renovate the house or build new: the cost side

A renovation costs less per square foot and keeps you out of development charges altogether. Rebuilding costs more but resets the layout, the ceiling heights and the warranty.

How to read this table: Read each row across to compare the two routes on the same point.

Renovation figures from our home renovation cost guide.
Renovate the houseBuild a custom home
Construction per sq ft$100 to $450; $450 to $550 and more for a high-end gut to the studs$500 to $1,130
Development chargesNone$0 for a replacement house in most cases; $55,138 on a vacant lot
WarrantyThe builder’s own workmanship warrantyTarion: 1 year workmanship, 2 years water and systems, 7 years major structure
Layout, ceiling heights, basement heightSet by the existing houseDesigned from scratch within the zoning
Energy and comfortImproved where walls are openedBuilt to today’s energy code throughout
TimeWeeks to months, by scopeAbout 16 to 34 months from first meeting to keys

In short

  • Renovate when the structure, height and layout work; rebuild when the house needs a new foundation and systems anyway.
Low end or high end

What puts a custom home at the low or the high end

Two houses of the same size and tier can be hundreds of thousands apart. The lot, the soil and the zoning set the floor; design and finishes decide where you land.

How to read this table: Read each row left to right: the middle column keeps a house near the bottom of its range, the right column pushes it to the top.

FactorToward the low endToward the high end
LotWide, flat lot with a driveway for stagingNarrow or sloped lot, no staging room, a crane
Soil and waterFirm soil, dry basement digFill, high water table, shoring next to the neighbours
TreesNo protected trees near the houseProtected trees that shape the footprint and the dig
ZoningHouse fits the by-law as drawnMinor variance, redesign after review
DesignSimple roof and stacked wallsComplex roof, long spans, steel, curtain glass
Ceiling heights9 feet throughout10 to 12 feet on the main floor, double-height foyer
BasementStandard depth, regular windowsWalk-out, extra depth, heated floors
FinishesSelections made before the price is setCustom millwork, imported stone, changes during construction
Renovate or rebuild

Not sure whether to renovate or rebuild?

We do both, so we price both for your house at one visit and show you the difference in cost, time and warranty.

Timelines

How long it takes to build a custom home in Toronto

Expect about 6 to 14 months from the first meeting to a building permit, then 10 to 18 months of construction. Carrying costs run the whole time, so time belongs in the budget.

How to read this table: Rows are the phases in order; some overlap, such as demolition while the permit is issued.

Published 2026 ranges from Toronto builders (design 4 to 8 months, permit review 4 to 16 weeks, construction 9 to 18 months), used in our own planning.
PhaseTypical time
Lot review and budget2 to 6 weeks
Design and permit drawings4 to 8 months
Permit review4 to 16 weeks; a minor variance adds months
Demolition and excavation1 to 3 months
Construction to occupancy10 to 18 months
From first meeting to keys, phases back to backabout 16 to 34 months
Keeping to budget

Six ways to keep a custom home on budget

01

Check the lot first

Zoning, trees, soil and services decide the cost floor; know them before you design.

02

Design to the by-law

A house that fits the zoning skips the variance, its fees and months of waiting.

03

Keep the roof and walls simple

Stacked walls and a straightforward roof save structure and labour.

04

Choose finishes before pricing

Selections made up front turn allowances into fixed numbers.

05

Carry a real contingency

Fifteen percent of construction and site work, as in the budgets above, leaves room for what the dig uncovers.

06

Budget the tax before the rebate

HST is paid on every invoice during construction; the owner-built rebate comes back only after completion.

Frequently asked questions

Custom home cost questions, answered

About $500 to $1,130 per sq ft for construction in 2026: $1.5M to $3.39M for 3,000 sq ft. Demolition, design, fees and HST are extra; land is separate.

About $500 to $650 for a standard custom home, $650 to $900 premium and $900 to $1,130 luxury, for construction only.

About $1.5M to $1.95M at a standard tier for construction, and about $2,167,000 to $3,174,000 all in when it replaces a house, before land.

About $2M to $2.6M standard, $2.6M to $3.6M premium and $3.6M to $4.52M luxury, construction only.

Usually not. The City credits the demolished house when the complete permit application follows within 60 months of the demolition permit.

$55,138 for a single house when the first building permit is issued from March 30, 2026 under the City’s reduction program; the full charge is $137,846.

About $25,000 to $75,000 to demolish and haul away a house, plus $3,000 to $8,000 for the designated substance survey and paperwork. The City’s demolition permit is usually $214.79.

$18.56 per m² of floor area in 2026, about $5,173 for 3,000 sq ft.

Yes, 13% on the construction contract. The Ontario owner-built rebate returns up to $16,080; first-time buyers and 2026 starts may get more if the house and land are under the value limits.

Builders publish 5% to 15% of construction for an architect, or 8% to 12% for design and engineering together. A Part 9 house can be designed by a BCIN designer.

About 6 to 14 months from the first meeting to the permit, then 10 to 18 months of construction: 16 to 34 months in total.

Renovating costs less per square foot, from $100 to $550 and more. Rebuilding makes sense when the house needs a new foundation, layout and systems anyway.

Land, financing, carrying costs, furniture and appliances. The all-in table adds site work, design, fees, contingency and HST.

No. The figures are planning ranges for October 2026. A quote needs a site visit and a written scope; we do both for free.

Professional credentials
Accredited excellence. Trusted craftsmanship.

Recognized credentials and professional affiliations supporting Route Homes projects across Toronto and the GTA.

Your custom home budget

Turn these custom home ranges into your real number

The ranges on this page are approximate. Your free estimate is not: a lot review, a written scope and an itemized price for your new house. Call (416) 834-2444 or book online.

Google reviews