Route Homes Cost Guide

Renovation and construction cost guides for Toronto, 2026

Six Toronto cost guides: a whole house ($200,000 to $900,000 for 2,000 sq ft), kitchens, bathrooms, basements, multiplexes and custom homes. Each shows 2026 price tables by size and finish, and the fees and taxes on top.

Guide, not a quote.

Every number is an approximate planning range, not a quote. Each guide states its date and what its ranges include and leave out, so you can compare it with any quote. A free site visit and a written scope turn a range into your price.

At a glance

Toronto renovation and building costs in one table

The headline 2026 range of every guide, side by side. Open a guide for the breakdown by size, finish tier and part of the project.

How to read this table: each row is one guide; the second column is its usual total range, the third its price per square foot where projects are priced that way.

Route Homes planning estimates, September and October 2026, before HST. Not a quote. Each guide breaks its range down by size, tier and part of the project.
ProjectTypical 2026 range in TorontoPer sq ftWhat sets the price
Whole-house renovation$200,000 to $900,000 for a 2,000 sq ft house$100 to $450Size, finish tier, how much of the house changes
Kitchen renovation$15,000 to $220,000Priced per kitchenSize, layout, cabinets, counters, appliances
Bathroom renovation$6,000 to $90,000Priced per bathroomType (powder room to ensuite), shower, tile, plumbing moves
Basement renovation$50,000 to $150,000 for 1,000 sq ft with a bathroom$35 to $200Bathroom or legal suite, height, water, underpinning
Multiplex (fourplex, triplex, sixplex)$408,000 to $1.27M to convert a 3,000 sq ft house into a fourplex; $1.3M to $2.2M to build a new 4,000 sq ft fourplex$325 to $550 new buildConvert or build new, number of units, services, approvals
Custom home$1.5M to $3.39M to build a 3,000 sq ft house$500 to $1,130Tier, lot, replacing a house or a vacant lot, design

What the ranges have in common

  • All are planning ranges for autumn 2026 (each guide gives its month), before 13% HST and a contingency.
  • The low end is the guide’s lowest finish tier on a straightforward project; the high end its top tier or a harder site.
  • The guides share one pricing model, so a kitchen or a bathroom costs the same in every guide that prices it.
How to use the guides

Start with the basis before the number.

01

Dated ranges

Each guide identifies when its figures were published so the numbers can be assessed in context.

02

Clear exclusions

Land, taxes, government charges and site-specific costs are not hidden inside one blended figure.

03

Project review

Each guide gives a planning range; a free site visit and a written scope turn it into an estimate for your project.

Common questions

Before you compare numbers.

The home renovation guide for work across the house, the kitchen, bathroom or basement guide for one part of it, the multiplex guide to add units, and the custom home guide to build on a vacant lot or replace a house.

Because cost depends on the house, the scope and the finish. Each range is a planning tool, not a quote.

No. Each guide lists 2026 City permit fees, development charges and 13% HST separately, with worked budgets that add HST and a contingency.

They were set in September and October 2026 and are reviewed at least once a year. City fees change every January.

From one Route Homes pricing model per guide, built on prices published in 2026 by Toronto renovation and building companies, the Altus Group 2026 cost guide for custom homes, our own fourplex figures and City of Toronto fees.

Use the guide for a first range, then book a free site visit. We send a written, itemized estimate.

Home renovation consultation

Not sure where the renovation should begin?

Start with the home, your priorities and the scope. Route Homes will help clarify feasibility, budget expectations, permit needs and the next practical step.

Google reviews

What our clients say on Google