Whole-house renovations, additions, kitchens, bathrooms, basements and condos in North York, planned around the zoning by-law, the North York Committee of Adjustment and the ravine and tree rules.
At 103 Peckham Ave we completed a full interior renovation of a 3,950 sq ft house in 2023: the kitchen, the bathrooms, new floors and a finished basement, planned together so the structure, wiring and plumbing were opened once.
In 2024 we renovated a 570 sq ft one-bedroom condo at 18 Holmes Ave. North York is also where we have built five custom homes, so we know its streets, lots and approvals well.
Most North York lots are zoned under the City’s Zoning By-law 569-2013, which sets height, setbacks, lot coverage and often floor area. Some lands are still under the former North York Zoning By-law 7625, so we confirm the by-law for the address before design.
A second storey or a rear addition that goes beyond the by-law needs a minor variance from the North York panel of the Committee of Adjustment. The panel sits at the North York Civic Centre, 5100 Yonge Street, and holds hybrid or virtual hearings.
The variance comes before the building permit, so it adds time to the schedule. We prepare the drawings, the zoning review and the application, and where a small change to the design keeps it within the by-law, we show you that option first.
How we plan and build the addition itself: home additions.
Which zoning by-law applies, whether the lot is in a ravine protected area and whether an addition needs a variance can all change the plan. Send the address and a few photos and we will tell you before we visit.
Injuring or removing a private tree 30 cm or more across, measured 1.4 m above the ground, needs a City permit, and every City tree on the boulevard is protected.
An arborist report and a tree protection plan usually go with the application, and a removed tree is replaced or paid for at $583.
Many lots along the East and West Don are in a ravine protected area.
There, injuring a private tree and placing fill or changing the grade each need a permit under the City’s ravine by-law, and TRCA may need to approve an addition or a walkout near the valley.
We check the address against the ravine maps before design.
Residential lots in North York can hold up to four units without a rezoning when the design fits the zoning envelope: a basement unit, a garden suite in the rear yard, or a house rebuilt as a multiplex.
Under By-law 845-2025, development charges for units two to six on a lot are $0. A basement unit still needs fire separation, its own exit and a permit; see legal basement suites and garden suites.
Every project starts with a free site visit and ends with a written, itemized estimate before you decide.
We see the house, note any tree near the work and whether the lot is near a ravine.
569-2013 or the former North York by-law 7625, and whether the design needs a minor variance.
Drawings by a qualified designer, and a structural design wherever walls or floors change.
Any approvals the lot needs, in place before the building permit.
The City’s permit, then each required inspection booked as the work reaches it.
A walkthrough, deficiencies closed and our 2-year workmanship warranty in writing.
Most lots are under the City’s Zoning By-law 569-2013; some are still under the former North York Zoning By-law 7625. The City’s zoning records confirm it for an address, and we check before design.
Only if it goes beyond what the by-law allows, for example in height, setbacks or floor area. Then the North York panel of the Committee of Adjustment decides before the building permit.
For a private tree 30 cm or more across, measured 1.4 m above the ground, yes, and for any City tree. In a ravine protected area the ravine by-law applies as well.
The City’s ravine maps show it, and many lots near the East and West Don are. We check the address before design.
In most cases, yes. A residential lot can hold up to four units, including a garden suite in the rear yard, when the design meets the zoning.
Yes. At 18 Holmes Ave we renovated a 570 sq ft one-bedroom condo. Condo work also follows the building’s own rules and needs the corporation’s approval for some changes.
It depends on the size, the scope, the finishes and any approvals the lot needs. You get a written, itemized estimate after a free site visit.
Projects we have completed: 103 Peckham Ave, North York · 18 Holmes Ave, North York
We walk the house with you, go through what you want and the budget, and send you a written, itemized estimate.