Home renovation cost Toronto: 2026 prices by size, finish and room

A whole-house renovation in Toronto costs about $100 to $450 per square foot in 2026: roughly $200,000 to $300,000 for a 2,000 sq ft house at an economy finish, $300,000 to $500,000 standard and $500,000 to $900,000 luxury, before HST. Approximate ranges, not a quote.

$5M Liability Insurance
WSIB Coverage
Licensed Trades
Permit Coordination
2-Year Workmanship Warranty

Toronto renovation costs at a glance

  • Full renovation: $100 to $150 per sq ft (economy), $150 to $250 (standard), $250 to $450 (luxury)
  • Kitchen: $25,000 to $140,000 for a medium kitchen; $40,000 to $70,000 at a standard finish
  • Bathroom: $12,000 to $58,000 for a main bathroom; $18,000 to $32,000 at a standard finish
  • Basement: $50 to $150 per sq ft to finish; $90 to $200 per sq ft as a legal second suite
  • On top: 13% HST and a 10% to 25% contingency

These are approximate planning ranges, not a quote. For the price of your own house, get a free estimate: call (416) 834-2444 or book a site visit.

Free estimate

Get a free, itemized renovation estimate

These ranges are a starting point. For your own renovation, we visit, measure and look at the structure and services you have now, then send a written price, line by line, like the tables on this page.

Free, with no obligation. Prefer to talk? Call (416) 834-2444.

Route Homes is a home renovation contractor in Toronto: design, permits and construction handled by one team.

How to read the numbers

What these estimates include, and what they leave out

01

Approximate, not a quote

Every figure is a planning range for September 2026. Your real price comes from a free estimate for your house and your scope.

02

Low and high numbers

Low: a house in good shape, layout kept, simpler finishes within the tier. High: an older house, walls moved, better finishes within the tier.

03

Included

Labour, materials, design and drawings, permits, demolition, disposal, site protection and project management.

04

Not included

HST (13%), contingency, appliances, furniture, window coverings, and exterior work such as roofing, windows and landscaping.

05

Where the numbers come from

Prices published in 2026 by Toronto renovation companies and the City of Toronto’s 2026 fee schedule, brought into one model where every part adds up.

06

Who prepared them

Route Homes, a Toronto design-build renovation company working since 2006, HCRA-licensed and Tarion-registered.

Price per square foot

Cost per square foot to renovate a house in Toronto

Renovating a Toronto house costs about $100 to $150 per sq ft at an economy finish, $150 to $250 at a standard finish and $250 to $450 for luxury.

The tier is set less by the tile than by how much of the house is opened up.

How to read this table: Rows are finish tiers; columns show what each tier usually buys. Find the row that matches the finishes and the amount of change you want.

Route Homes planning estimates, September 2026, before HST. Not a quote.
Finish tierCost per sq ftFinishesLayout and systems
Economy$100 to $150Laminate or vinyl plank, stock cabinets, laminate or entry quartz, standard fixturesLayout mostly kept; wiring and plumbing repaired or replaced where walls are opened
Standard$150 to $250Engineered hardwood, semi-custom cabinets, quartz, tiled showers, pot lightsSome walls moved; new wiring and plumbing in the renovated areas; better insulation
Luxury$250 to $450Custom cabinetry and millwork, solid hardwood or stone, designer fixturesOpen plans with new beams, full rewiring, new heating and cooling, smart controls
High-end gut of an older house$450 to $550 and moreLuxury finishesEverything back to the studs, plus structural and foundation work (published range)

Who each tier suits

  • Economy: rentals, a house being readied for sale, or a tight budget where working rooms matter more than finishes.
  • Standard: most family homes renovated to live in for years, with durable mid-range materials and the systems updated where walls are open.
  • Luxury: a long-term home where a new layout, custom cabinetry and new systems throughout justify the spend.
  • High-end gut of an older house: pre-war and mid-century houses taken back to the studs, with structure and foundation work on top.

Why each tier has a low and a high number

Inside one tier, the low number is a house in good shape, with the layout kept and the simpler finishes of that tier. The high number is an older house, some walls moved, more wiring and plumbing, and the better finishes of that tier.

The same kitchen in three tiers

  • Economy: stock cabinets, laminate or entry quartz counter, sink and range where they were
  • Standard: semi-custom cabinets, quartz, new lighting, an island if the room allows
  • Luxury: custom cabinets to the ceiling, stone slab, a wall opened and plumbing moved

The square footage is the finished floor area above grade. Basements are priced separately, because finishing one is a different job with different costs.

Published 2026 guides from Toronto renovation companies disagree for the same words: one puts a mid-range renovation at $100 to $200 per sq ft, another at $200 to $250. Our tiers say what each one includes, so you can compare like with like.

Which tier is yours?

Find your tier before you read the rest

01

Economy fits when

The house is in fair shape, you keep the layout, and you want new floors, paint, a kitchen and bathrooms that work, with durable, simple finishes.

02

Standard fits when

You open or move some walls, replace old wiring and plumbing while the walls are open, and choose finishes such as engineered hardwood and quartz.

03

Luxury fits when

You change the layout, add beams, rewire the whole house and choose custom cabinetry, stone and designer fixtures throughout.

By square footage

Renovation cost by house size, from 1,000 to 3,500 sq ft

A 1,000 sq ft house costs about $100,000 to $450,000 to renovate, a 1,500 sq ft house $150,000 to $675,000 and a 2,000 sq ft house $200,000 to $900,000, depending on the finish tier.

How to read this table: Rows are house sizes (finished floors above ground) and columns are the three tiers. Each cell is the size times the tier’s price per sq ft.

Route Homes planning estimates, September 2026, before HST. Not a quote. Finished floor area above grade; basements are priced separately below.
House sizeEconomyStandardLuxury
1,000 sq ft$100,000 to $150,000$150,000 to $250,000$250,000 to $450,000
1,200 sq ft$120,000 to $180,000$180,000 to $300,000$300,000 to $540,000
1,500 sq ft$150,000 to $225,000$225,000 to $375,000$375,000 to $675,000
1,800 sq ft$180,000 to $270,000$270,000 to $450,000$450,000 to $810,000
2,000 sq ft$200,000 to $300,000$300,000 to $500,000$500,000 to $900,000
2,500 sq ft$250,000 to $375,000$375,000 to $625,000$625,000 to $1,125,000
3,000 sq ft$300,000 to $450,000$450,000 to $750,000$750,000 to $1,350,000
3,500 sq ft$350,000 to $525,000$525,000 to $875,000$875,000 to $1,575,000

How the price grows with size

  • Every extra 500 sq ft adds about $50,000 to $75,000 at an economy finish, $75,000 to $125,000 standard and $125,000 to $225,000 luxury.
  • A bigger house at a simpler finish can cost the same as a smaller house at a better one: a 1,500 sq ft economy renovation overlaps a 1,000 sq ft standard one.
  • If your house falls between two rows, budget from the row above; it leaves room for surprises.

How to read your row

Each figure is the house size times the tier’s cost per sq ft, so you can work out any size the same way: 1,700 sq ft at a standard finish is 1,700 × $150 to $250, or $255,000 to $425,000.

How to measure your square footage

Use the finished floor area above grade, the figure on most listings. Leave out the basement and the garage; the basement has its own table below.

Why a small house costs more per square foot

A kitchen and a bathroom cost about the same in any house. In a standard 1,000 sq ft bungalow they take about 40% of the budget; in a 2,000 sq ft house, the kitchen and three bathrooms take about 30%.

So small houses usually land near the top of their range.

By home type

Bungalow, semi, townhouse, detached or condo

At the same size and tier, the type of home changes where you land in the range more than the price itself. The examples below use common sizes; for your own house, use its real size.

How to read this table: Each row uses an example size for that type of home; the last column says what pushes that type up or down within its range.

Route Homes planning estimates, September 2026, before HST. Not a quote. Example sizes only; use your own size in the house-size table. The condo row is a published 2026 range.
Home typeExample sizeEconomyStandardLuxuryWhat changes the cost
Bungalow1,100 sq ft$110,000 to $165,000$165,000 to $275,000$275,000 to $495,000Everything on one floor, so the kitchen and bathroom are a larger share; often a big basement worth finishing at the same time
Semi-detached1,500 sq ft$150,000 to $225,000$225,000 to $375,000$375,000 to $675,000A shared party wall to keep fire-rated and sound-tight; narrow lots make access and material handling slower
Townhouse1,400 sq ft$140,000 to $210,000$210,000 to $350,000$350,000 to $630,000Party walls on both sides; in a condo townhouse the corporation’s rules and approvals apply
Detached two-storey2,200 sq ft$220,000 to $330,000$330,000 to $550,000$550,000 to $990,000More exterior wall and more windows, and more freedom to move walls, add beams or open the plan
Condo apartmentany size$40,000 to $120,000 for a full unit, before HST (published 2026 range)No structure or exterior, but building rules: work hours, elevator bookings, insurance and board approval

Reading the home types

  • Bungalows look cheap per house but expensive per square foot, because the kitchen and bathroom are a large share of a small floor.
  • Semis and townhouses share walls with neighbours, so fire and sound separations stay intact, and narrow lots slow deliveries and disposal.
  • Detached houses give the most freedom to move walls, which is where luxury budgets usually go.
  • Condos skip structure and exteriors, so their range is lower, but building rules can stretch the schedule.

Condos are priced differently: there is no structure, roof or exterior to deal with, but the building’s rules set the hours, the elevator bookings and what can change. More on condo renovations.

Low end or high end

What puts your project at the low or the high end

Two houses of the same size and tier can be $100,000 apart. These eight factors decide where in the range a project lands, and most of them are visible at a site visit.

How to read this table: Read each row left to right: the middle column keeps a project near the bottom of its range, the right column pushes it toward the top.

FactorToward the low endToward the high end
Age and conditionBuilt after about 1980; wiring and plumbing updatedBuilt before 1960; knob-and-tube, galvanized pipes, plaster walls
LayoutRooms stay where they areWalls removed, new beams, kitchen or bathroom moved
PlumbingFixtures stay in placeNew drains, a moved stack, an extra bathroom
ElectricalThe panel has room for new circuitsNew panel or service, many new circuits and pot lights
FinishesStandard sizes and in-stock materialsCustom sizes, imported tile, stone slabs
Access and siteDriveway parking and easy accessStreet parking only, tight side yards, materials carried by hand
Permits and approvalsA standard building permitA minor variance, engineering, heritage or ravine review
Decisions and scheduleChoices made before work startsChanges during construction, a rushed schedule

How the factors add up

  • One factor alone moves a project by a few thousand dollars; three or four together move it from the bottom of its range to the top.
  • Age and layout matter most: an older house with walls moved almost always lands in the upper half of its range.

At the free site visit we look at each of these, so the estimate you get says where your house sits and why.

Free estimate, no guesswork

Want a number for your house, not a range?

These tables are approximate planning ranges, not a quote. Book a free site visit and we will send a written, itemized estimate for your house. Prefer to talk? Call (416) 834-2444.

Want this priced for your home? As a Toronto home renovation contractor, we give itemized quotes after a site visit.

By part of the house

Main floor, second floor or basement: what each one costs

Renovating just the main floor of a 2,000 sq ft two-storey house costs about $104,000 to $477,000; the second floor about $96,000 to $423,000. The two floors together equal the whole-house price.

How to read this table: Rows are parts of a 2,000 sq ft two-storey house; the main and second floor rows add up to the whole-house row.

Route Homes planning estimates, September 2026, before HST. Not a quote.
Part of the houseEconomyStandardLuxury
Main floor (about 1,000 sq ft: kitchen, living, dining, powder room)$104,000 to $157,000$157,000 to $261,000$261,000 to $477,000
Second floor (about 1,000 sq ft: bedrooms, two bathrooms)$96,000 to $143,000$143,000 to $239,000$239,000 to $423,000
Whole house above grade (2,000 sq ft)$200,000 to $300,000$300,000 to $500,000$500,000 to $900,000
Basement finish (1,000 sq ft, with a three-piece bathroom)$50,000 to $70,000$70,000 to $100,000$100,000 to $150,000
Whole house and basement (3,000 sq ft)$250,000 to $370,000$370,000 to $600,000$600,000 to $1,050,000

Why the floors differ

  • Main floor: the kitchen alone is $40,000 to $70,000 of the $157,000 to $261,000 standard range.
  • Second floor: two full bathrooms are $36,000 to $64,000 of its $143,000 to $239,000 standard range.
  • Basement: priced per square foot of finished space, separately from the floors above.
  • Whole house and basement: the last row adds a 1,000 sq ft basement to the whole house, the full project many families plan.

The main floor costs more than the second because it holds the kitchen. Upstairs, the two bathrooms carry most of the budget.

When one floor costs closer to the whole house

If the electrical panel, the water service or the ductwork has to be replaced anyway, that cost serves the whole house even when only one floor is renovated.

Doing one floor now and one later usually costs more in total: the site is set up twice, and wiring, plumbing and ducts that run between floors get opened twice.

Line by line

Where the money goes in a whole-house renovation

In a standard 2,000 sq ft renovation, the kitchen and bathrooms take about 30% of the budget, the building systems (electrical, plumbing, heating) about 20%, and design, permits and project management about 15%.

How to read this table: Rows are the trades and costs inside a 2,000 sq ft renovation; each column adds up to the total for that tier.

Route Homes planning estimates, September 2026, before HST. Not a quote.
Line itemWhat it coversEconomyStandardLuxury
Design, drawings, engineering and permitsMeasured drawings, permit set, structural engineer, City fees$8,000 to $12,000$12,000 to $20,000$20,000 to $40,000
Demolition, disposal and site protectionStrip-out, bins, floor and dust protection$10,000 to $14,000$14,000 to $20,000$20,000 to $30,000
Structural work and framingNew openings, beams, reframed walls$7,000 to $12,000$12,000 to $25,000$25,000 to $55,000
ElectricalPanel, new circuits, pot lights, smoke and CO alarms$18,000 to $26,000$26,000 to $40,000$40,000 to $70,000
PlumbingSupply lines, drains, fixture rough-ins$14,000 to $20,000$20,000 to $32,000$32,000 to $55,000
Heating, cooling and ventilationDuctwork changes, bathroom fans, range hood venting, equipment$10,000 to $15,000$15,000 to $28,000$28,000 to $55,000
Insulation and drywallInsulation where walls are open, drywall, taping$22,000 to $30,000$30,000 to $42,000$42,000 to $60,000
KitchenCabinets, counters, backsplash, sink and faucet, lighting (appliances extra)$25,000 to $40,000$40,000 to $70,000$70,000 to $140,000
Bathrooms (two full, one powder room)Tile, waterproofing, vanities, fixtures, glass$30,000 to $45,000$45,000 to $80,000$80,000 to $145,000
Flooring (about 1,700 sq ft)Removal, levelling, underlay, flooring, stair treads$16,000 to $24,000$24,000 to $40,000$38,000 to $70,000
Interior doors, trim and stairsDoors, casings, baseboards, railings, built-ins$10,000 to $16,000$16,000 to $28,000$30,000 to $55,000
PaintingWalls, ceilings, trim$8,000 to $12,000$12,000 to $18,000$18,000 to $30,000
Project management and site costsSupervision, scheduling, inspections, cleaning, insurance$22,000 to $34,000$34,000 to $57,000$57,000 to $95,000
Total, 2,000 sq ftEquals the per-sq-ft range times 2,000$200,000 to $300,000$300,000 to $500,000$500,000 to $900,000

Which lines move the most

  • The kitchen and bathrooms are the two largest lines in every tier: about $55,000 to $85,000 together at an economy finish, $85,000 to $150,000 standard and $150,000 to $285,000 luxury.
  • Electrical, plumbing and heating together are about a fifth of a standard budget and grow fastest in older houses.
  • Project management grows with the tier, because more trades, more inspections and a longer schedule need more supervision.

Add the lines in any column and you get the total for that tier. A good estimate reads the same way: every line priced.

Lines a low quote often leaves out

  • design, drawings and permits, left for the owner to arrange
  • disposal, site protection and cleaning
  • project management and supervision
  • kitchen and bathroom allowances set too low to buy what you picked
  • electrical and plumbing priced only “as needed”

Why the systems lines swing so much

Electrical runs from $18,000 to $70,000 because a few new circuits and a full rewire with a new panel and 60 pot lights are different jobs. Plumbing and heating swing the same way.

Appliances, furniture, window coverings and exterior work (roof, windows, landscaping) are not in these totals.

Kitchens

Kitchens: from a small refresh to a large custom kitchen

A medium Toronto kitchen of 100 to 150 sq ft costs about $25,000 to $40,000 at an economy finish, $40,000 to $70,000 at a standard finish and $70,000 to $140,000 for luxury, before appliances.

How to read this table: Rows are kitchen sizes; the last row is the appliance package, which is never inside the kitchen price.

Route Homes planning estimates, September 2026, before HST. Not a quote. Cabinets, counters, backsplash, sink, lighting, flooring, plumbing and electrical; appliances listed separately.
Kitchen sizeEconomyStandardLuxury
Small or galley (under 70 sq ft)$15,000 to $25,000$25,000 to $45,000$45,000 to $80,000
Medium (100 to 150 sq ft)$25,000 to $40,000$40,000 to $70,000$70,000 to $140,000
Large with an island (200 sq ft or more)$40,000 to $60,000$70,000 to $110,000$140,000 to $220,000
Appliance package (extra, published range)$5,000 to $8,000$12,000 to $20,000$35,000 to $70,000

What the kitchen rows mean

  • Small: a galley or condo kitchen under 70 sq ft; fewer cabinets but the same plumbing, wiring and venting.
  • Medium: about 100 to 150 sq ft, which includes a 10×10 kitchen; this is the kitchen inside the whole-house totals.
  • Large: 200 sq ft and more, usually with an island; the island’s power and plumbing are a big part of the jump.

What moves a kitchen from the low to the high number

  • Cabinets: stock, semi-custom or custom; usually the largest single cost
  • Counters: laminate, quartz or natural stone, and how many seams and cut-outs
  • Layout: keeping the sink and range in place, or moving plumbing, gas and venting
  • Ventilation: a recirculating hood, or one ducted outside through a wall
  • Lighting: a few fixtures, or pot lights, under-cabinet and pendant circuits

Cabinets compared

How to read this table: Rows are the three kinds of cabinets; ‘compared’ sets each one against the row above it.

Published 2026 Toronto prices. Multiples compare the middle of each range.
CabinetsPublished priceComparedGood to know
Stock$100 to $400 per linear ftlowest costFixed sizes in 3-inch steps and a few finishes; fastest to get; the economy-tier assumption
Semi-custom$300 to $600 per linear ftabout 1.8× stockMore sizes, finishes and organisers; the standard-tier assumption
Custom$600 to $1,200 and more per linear ftabout 2× semi-customAny size, up to the ceiling, any finish; the longest lead time

In short

  • Stock suits rentals and tight budgets, semi-custom is the balance most standard kitchens use, and custom pays off where walls are odd sizes or cabinets go to the ceiling.

Countertops compared

How to read this table: Rows run from the least to the most expensive counter; ‘compared’ sets each one against the row above it.

Published 2026 Toronto prices for quartz; percentages compare the middle of each range.
CountertopPublished price, installedComparedGood to know
Laminatethe least expensive optionbelow entry quartzNot heat-proof and seams show; fits a tight economy budget
Entry quartz$55 to $80 per sq ftbaselineNon-porous, never needs sealing; plain colours and small patterns
Mid-range quartz$80 to $110 per sq ftabout 41% more than entryMore patterns and veining; the standard-tier assumption
Luxury quartz$110 to $180 and more per sq ftabout 53% more than mid-rangeMarble-look slabs, thicker edges, waterfall ends
Granite or marblevaries by slabusually at or above luxury quartzEvery slab is unique; needs sealing; marble etches with lemon juice and vinegar

In short

  • Entry or mid-range quartz covers most kitchens: no sealing and no stains. Natural stone is chosen for its look and needs more care.

More detail in our kitchen renovation cost guide and on how we plan kitchen renovations.

Bathrooms

Bathrooms: powder room, main bathroom and ensuite

A main bathroom in Toronto costs about $12,000 to $18,000 at an economy finish, $18,000 to $32,000 at a standard finish and $32,000 to $58,000 for luxury. A powder room is about half that.

How to read this table: Rows are bathroom types and columns are the tiers; each figure covers the whole room, from demolition to the last accessory.

Route Homes planning estimates, September 2026, before HST. Not a quote. Demolition, waterproofing, tile, vanity, toilet, shower or tub, glass, fan, lighting.
BathroomEconomyStandardLuxury
Powder room$6,000 to $9,000$9,000 to $16,000$16,000 to $29,000
Main bathroom (three or four piece)$12,000 to $18,000$18,000 to $32,000$32,000 to $58,000
Primary ensuite$18,000 to $26,000$26,000 to $45,000$45,000 to $90,000

What the bathroom rows mean

  • Powder room: a toilet and a sink, no shower and so no waterproofing; the cheapest room to redo.
  • Main bathroom: a tub or shower, a vanity and a toilet; waterproofing and tile carry much of the cost.
  • Primary ensuite: more floor, often a separate tub and shower and a double vanity, so more tile, fixtures and plumbing.

What moves a bathroom from the low to the high number

  • Shower: a tub with a surround, a tiled walk-in shower, or a curbless shower
  • Tile: how much wall is tiled, the tile size and the pattern
  • Plumbing: fixtures in place, or a moved toilet or drain
  • Extras: heated floor, frameless glass, niches, a custom vanity

Shower choices compared

  • Tub with an acrylic surround: the lowest cost and the fastest to install; it fits the economy tier
  • Tiled tub or walk-in shower with glass: the standard tier; a waterproofing membrane goes under the tile
  • Curbless walk-in shower: the floor is recessed or built up for the slope and a linear drain, which pushes the bathroom up a tier; easier to use with age

Waterproofing under the tile, the anti-scald shower valve and a vented fan are where cheap bathrooms fail, so they are in every tier.

More in our bathroom renovation cost guide and on bathroom renovations.

Basements

Basements: finishing, legal suites and underpinning

Finishing a Toronto basement with a three-piece bathroom costs about $50 to $150 per sq ft, so $50,000 to $150,000 for 1,000 sq ft. A legal second suite costs about $90 to $200 per sq ft.

How to read this table: The first row is the price per square foot, the size rows multiply it, the legal suite rows price a separate unit, and the last row is an add-on.

Route Homes planning estimates, September 2026, before HST. Not a quote.
BasementEconomyStandardLuxury
Cost per sq ft, finished with a three-piece bathroom$50 to $70$70 to $100$100 to $150
600 sq ft finished$30,000 to $42,000$42,000 to $60,000$60,000 to $90,000
800 sq ft finished$40,000 to $56,000$56,000 to $80,000$80,000 to $120,000
1,000 sq ft finished$50,000 to $70,000$70,000 to $100,000$100,000 to $150,000
1,200 sq ft finished$60,000 to $84,000$84,000 to $120,000$120,000 to $180,000
Legal second suite, cost per sq ft$90 to $120$120 to $150$150 to $200
800 sq ft legal second suite$72,000 to $96,000$96,000 to $120,000$120,000 to $160,000
Underpinning to lower the floor (added, published range)$50,000 to $80,000 and more$50,000 to $80,000 and more$50,000 to $80,000 and more

What the basement rows mean

  • Finish rows: framing, insulation, drywall, flooring, lighting and a three-piece bathroom.
  • Legal suite rows: everything a second unit needs on top: separate entrance, fire separation, egress windows, a kitchen and separate heating or a duct smoke detector.
  • Underpinning: added to any row when the ceiling is too low; it costs the same whatever the finish.

Finished basement or legal suite: why the price jumps

  • a separate entrance, often with a new exterior stair
  • fire separation between the units, and interconnected smoke and CO alarms
  • its own heating, or a duct smoke detector that shuts the system down
  • egress windows in the bedrooms
  • a second kitchen and laundry

Low basements may need underpinning or a bench footing before any of that, and damp ones need the water dealt with first.

More in our basement renovation cost guide and on basement renovations and legal suites.

Other rooms and systems

Living rooms, bedrooms, floors and building systems

A living room renovation costs about $8,000 to $60,000 and a bedroom about $4,000 to $35,000, depending on what is replaced. Flooring runs about $9.50 to $41 per sq ft installed.

How to read this table: The first two rows are single rooms, the flooring row is a rate per square foot, and the rest are whole-house trades that match the line items above.

Route Homes planning estimates, September 2026, before HST. Not a quote. Whole-house rows match the line items above.
Room or systemEconomyStandardLuxury
Living room (about 250 sq ft): floors, lighting, paint, built-ins$8,000 to $15,000$15,000 to $30,000$30,000 to $60,000
Bedroom (about 150 sq ft): floors, lighting, closet, paint$4,000 to $8,000$8,000 to $18,000$18,000 to $35,000
Flooring, installed, per sq ft$9.5 to $14$14 to $23.5$22 to $41
Painting, whole 2,000 sq ft house$8,000 to $12,000$12,000 to $18,000$18,000 to $30,000
Electrical, whole house$18,000 to $26,000$26,000 to $40,000$40,000 to $70,000
Plumbing, whole house$14,000 to $20,000$20,000 to $32,000$32,000 to $55,000
Heating, cooling and ventilation$10,000 to $15,000$15,000 to $28,000$28,000 to $55,000
Interior doors, trim and stairs$10,000 to $16,000$16,000 to $28,000$30,000 to $55,000

For single rooms, most of the cost is floors, lighting and built-ins. For the whole house, the systems behind the walls cost as much as the finishes you see.

Flooring materials compared

How to read this table: Rows are floor materials; the price includes removing the old floor and preparing the subfloor.

Installed prices include removing the old floor, levelling and underlay (Route Homes planning estimates). Multiples compare the middle of each range.
FlooringInstalled priceComparedGood to know
Laminate$9.5 to $14 per sq ftlowest costHard-wearing surface; not for bathrooms or damp basements
Vinyl plank$9.5 to $14 per sq ftabout the same as laminateWaterproof core, so a common choice for basements, kitchens and rentals
Engineered hardwood$14 to $23.5 per sq ftabout 1.6× vinyl plankReal wood on top; more stable than solid wood over concrete or radiant heat
Solid hardwood, herringbone$22 to $41 per sq ftabout 1.7× engineeredCan be sanded and refinished several times; not for basements
Porcelain tilestandard to luxury banddepends on size and patternThe most durable floor in bathrooms, entries and kitchens; cold without a heated floor

In short

  • Vinyl plank for basements and rentals, engineered hardwood for main floors over concrete or radiant heat, solid hardwood where it can be refinished for decades, porcelain where floors get wet.
Kitchens, bathrooms, basements

Pricing one room or the whole house?

Tell us what you want to renovate. We will see it, write the scope and send a free, itemized estimate, the surest way to know which tier your project is in.

Older houses

What an older Toronto house adds to the cost

Houses built before about 1970 often hide $15,000 to $40,000 of extra work, found at demolition: old wiring, galvanized or lead water lines, cast-iron drains, asbestos and foundation problems.

How to read this table: Rows are the usual surprises in older houses, when they show up, and the range Toronto companies publish.

Ranges published by Toronto renovation companies in 2026, not Route Homes prices.
Older-house itemWhen it comes upPublished 2026 range
Asbestos abatementPlaster, old tile, pipe insulation, vermiculite$6 to $18 per sq ft
Mould remediationBasements, behind old bathrooms$4 to $5 per sq ft
Electrical panel upgradeKitchen, heat pump or EV charger on an old service$1,500 to $2,500
Foundation repairsCracks, leaks, failed parging$25,000 to $60,000
UnderpinningLowering a basement floor for headroom$50,000 to $80,000 and more
Waste binsEvery demolition$500 to $1,500 per bin
Temporary housingWhole-house renovations$3,000 to $12,000 and more; short-term rentals $8,000 to $20,000 and more
All hidden costs together, pre-1970 housesFound at demolition$15,000 to $40,000

How to plan for them

  • Set the contingency aside for these, not for upgrades: 15% to 25% in a house built before 1960.
  • Have designated substances such as asbestos identified before demolition; it is required, and it avoids stopping the job halfway.

Asbestos and other designated substances must be identified before construction starts. Knob-and-tube wiring, undersized panels and low basements are the most common surprises in older houses.

Our estimates spell out allowances and exclusions, and changes are agreed in writing, so anything found behind a wall is priced and approved before that part of the work goes ahead.

Fees, drawings and tax

Toronto permit fees, drawings and HST in 2026

The City of Toronto charges $11.53 per m² for a permit to renovate a house interior in 2026, with a $214.79 minimum. Drawings and engineering usually cost more than the permit, and HST adds 13% to the whole contract.

How to read this table: Rows marked City of Toronto are 2026 fees; the others are published ranges and rules. The amount column shows how each fee is worked out.

CostAmountSource
Building permit, interior alterations$11.53 per m² (150 m² = $1,729.50)City of Toronto, 2026
Building permit, renovation with floor replacement$13.41 per m²City of Toronto, 2026
Building permit, addition$18.56 per m² (40 m² = $742.40)City of Toronto, 2026
Building permit, basement finishing$6.20 per m² (80 m² = $496)City of Toronto, 2026
Each new residential unit$56.33City of Toronto, 2026
Minimum permit fee$214.79City of Toronto, 2026
Heating and ventilation permit (house)$214.79, or $270.64 with air conditioningCity of Toronto, 2026
Zoning certificate, when needed$644.38City of Toronto, 2026
Architectural or permit drawings$5,000 to $20,000 (basement sets $2,000 to $5,000)Published 2026 ranges
Structural engineering$3,000 to $8,000Published 2026 ranges
HST13% of the contractOntario
Contingency10% cosmetic, 15% kitchens, bathrooms and whole houses, 25% or more before 1960Published 2026 guidance

Which fees apply to your project

  • A kitchen or bathroom with moved plumbing: usually the $214.79 minimum, since the room is small.
  • A whole interior: the per-m² rate times the floor area of the work, about $1,730 for 1,600 sq ft.
  • An addition or a basement unit: the addition or basement rate, plus $56.33 per new unit.
  • Every project: HST on the contract, and a contingency on top.

The permit fee is the rate times the floor area of the work: about $1,730 for 1,600 sq ft of interior work, against $5,000 to $20,000 for the drawings behind it.

Most real renovations need a permit: removing or changing walls, moving plumbing, adding a bathroom, changing ductwork, underpinning, a second suite or an addition. Painting, flooring and replacing cabinets in place usually do not.

Worked examples

Three worked budgets, from estimate to total with tax

A standard 1,500 sq ft full renovation comes to about $292,000 to $487,000 once a 15% contingency and HST are added. The table shows how each total is built.

How to read this table: Each row starts from the tables above, adds a 15% contingency, then 13% HST.

Route Homes planning estimates, September 2026, before HST. Not a quote. Totals rounded to the nearest $1,000.
Budget exampleConstruction estimateWith 15% contingencyWith HST (13%)
1,500 sq ft semi, full interior, standard finish1,500 × $150 to $250 = $225,000 to $375,000$259,000 to $431,000$292,000 to $487,000
Kitchen, main bathroom and ensuite, standard$40,000 to $70,000 + $18,000 to $32,000 + $26,000 to $45,000 = $84,000 to $147,000$97,000 to $169,000$109,000 to $191,000
800 sq ft basement to a legal second suite, standard800 × $120 to $150 = $96,000 to $120,000$110,000 to $138,000$125,000 to $156,000

What the examples show

  • The full renovation shows how a per-sq-ft range becomes a real budget: contingency and tax add almost 30%.
  • The rooms example is a partial renovation of the three rooms that wear out first.
  • The suite example prices a rentable unit; rent from it can offset part of the cost over time.

Build your own budget in four steps

  • find your size in the house-size table, or add up the rooms you are changing
  • pick your tier with the checklist above
  • add 10% to 25% contingency, more for an older house
  • add 13% HST

Contingency is money set aside, not money spent. HST is charged on the contingency only if you use it.

Timelines

How long each renovation takes

A bathroom takes about 3 to 5 weeks of construction, a kitchen 4 to 8 weeks and a whole 2,000 sq ft house about 3 to 6 months, plus design and permit time before work starts.

How to read this table: Design and permits come before any work in the house; construction is the time the house is a site.

Route Homes planning estimates. A minor variance from the Committee of Adjustment adds months.
ProjectDesign and permitsConstruction
Bathroom2 to 4 weeks3 to 5 weeks
Kitchen3 to 6 weeks4 to 8 weeks
Basement finish3 to 6 weeks8 to 12 weeks
Legal second suite6 to 10 weeks10 to 16 weeks
One floor of a house6 to 10 weeks8 to 14 weeks
Whole house, about 2,000 sq ft8 to 16 weeks3 to 6 months

Why some projects take longer

  • Legal suites and whole houses wait for permits and pass more inspections, including fire separations.
  • Kitchens and bathrooms are quick to build but depend on cabinets, tile and glass arriving on time.

A finishes-level project can be shorter: our 4,300 sq ft interior renovation (floors, paint, kitchen, washrooms and wall panels) took two and a half months.

What slows a project: comments on the permit drawings, a minor variance, long-lead cabinets or windows, and decisions left until the trades are waiting. Time costs money too, as temporary housing when you move out.

Keeping to budget

Six ways to keep a renovation on budget

01

Decide before demolition

Changes made during construction commonly add 15% to 30% to their part of the job. Choose layouts and finishes before work starts.

02

Keep the plumbing where it is

Moving a sink, toilet or shower means new drains and venting. Keeping them in place is the biggest single saving in kitchens and bathrooms.

03

Mix tiers room by room

Spend on the kitchen and main bathroom, and use economy finishes in secondary rooms. Published guides put the saving at 20% to 30% on materials.

04

Do it in one project

One set-up, one permit and one pass through the walls costs less than two smaller renovations.

05

Order long-lead items early

Cabinets, windows and special tile can take weeks. Ordering on time avoids paying a crew to wait.

06

Keep a real contingency

10% for cosmetic work, 15% for kitchens, bathrooms and whole houses, 25% or more for houses built before 1960.

Free estimate

What your free estimate includes

01

A site visit

We walk the house with you and look at the panel, the plumbing, the basement and the walls you want to change.

02

A written scope

Room by room: what is removed, built, replaced and upgraded, and what is excluded.

03

An itemized estimate

Every line priced, like the line-item table above, so you can compare quotes on scope, not on the total.

04

Allowances you control

Tile, cabinets, fixtures and flooring as allowances you can raise or lower.

05

Permit and drawing advice

What needs a permit, drawings or an engineer, and what that adds to the plan.

06

A schedule

A written timeline for design, permits and construction, so you can plan the move and the money.

Faster estimate

Get your free estimate faster: what to send us

  • the address and the type of house: detached, semi, townhouse or bungalow
  • its size, or the square footage on the listing
  • photos of the rooms you want to change, the electrical panel and the basement
  • what you want done, and a budget range
  • when you would like to start

Call (416) 834-2444, email Sales@routehomes.ca or book a site visit online, and we will arrange the visit.

Money back

Tax credits and rebates that lower the real cost

Two federal tax credits can apply to renovation costs:

  • the Home Accessibility Tax Credit, for work that makes a home safer or easier to use for someone 65 or older, or eligible for the disability tax credit
  • the Multigenerational Home Renovation Tax Credit, for creating a secondary unit so a senior or an adult with a disability can live with a relative

The City of Toronto’s Basement Flooding Protection Subsidy Program helps pay for a backwater valve or a sump pump. Amounts and rules change, so check the current program before counting on it.

Frequently asked questions

Home renovation cost questions, answered

About $100 to $450 per sq ft. For a 2,000 sq ft house: $200,000 to $300,000 at an economy finish, $300,000 to $500,000 standard and $500,000 to $900,000 luxury, before HST.

About $100,000 to $150,000 at an economy finish, $150,000 to $250,000 standard and $250,000 to $450,000 luxury. Small houses tend toward the top of each range.

About $150,000 to $225,000 economy, $225,000 to $375,000 standard and $375,000 to $675,000 luxury, before contingency and HST.

About $250,000 to $375,000 economy, $375,000 to $625,000 standard and $625,000 to $1,125,000 luxury.

About $50 to $150 per sq ft with a three-piece bathroom, so $50,000 to $150,000 for 1,000 sq ft. A legal second suite is about $90 to $200 per sq ft.

About $25,000 to $140,000 for a medium kitchen of 100 to 150 sq ft; $40,000 to $70,000 at a standard finish, plus appliances.

About $12,000 to $58,000 for a main bathroom, $18,000 to $32,000 at a standard finish. An ensuite runs $18,000 to $90,000.

The ranges on this page do not. Ontario HST is 13%, so $100,000 of work becomes $113,000. Always check whether a quote includes it.

In 2026: $11.53 per m² for interior alterations, $18.56 per m² for an addition and $6.20 per m² to finish a basement, with a $214.79 minimum.

About 10% for cosmetic work, 15% for kitchens, bathrooms and whole houses, and 25% or more for houses built before 1960.

For about 2,000 sq ft, plan 8 to 16 weeks for design and permits and 3 to 6 months of construction. A finishes-only renovation can be faster.

For a single room, usually yes. For a whole-house renovation, most families move out: water and power get shut off, and there is dust and demolition. Budget for temporary housing.

If the foundation and structure are sound, renovating usually costs less. We compare both in Is it cheaper to renovate or rebuild?

Usually because they price different scopes. Compare the line items, what is excluded, the finish allowances, who handles permits, how changes are priced and the warranty.

No. The figures are approximate planning ranges for September 2026. A quote needs a site visit and a written scope; we do both for free.

Because the same size and tier can be a simple house with the layout kept, or an older house with walls moved and systems replaced. The low-and-high table above shows the eight factors.

Yes. We visit the house, go through what you want, and send a free, itemized estimate for your project in writing.

Professional credentials
Accredited excellence. Trusted craftsmanship.

Recognized credentials and professional affiliations supporting Route Homes projects across Toronto and the GTA.

Your renovation budget

Turn these ranges into your real number

The ranges on this page are approximate. Your free estimate is not: a site visit, a written scope and an itemized price for your house. Call (416) 834-2444 or book online.