A whole-house renovation in Toronto costs about $100 to $450 per square foot in 2026: roughly $200,000 to $300,000 for a 2,000 sq ft house at an economy finish, $300,000 to $500,000 standard and $500,000 to $900,000 luxury, before HST. Approximate ranges, not a quote.
These are approximate planning ranges, not a quote. For the price of your own house, get a free estimate: call (416) 834-2444 or book a site visit.
These ranges are a starting point. For your own renovation, we visit, measure and look at the structure and services you have now, then send a written price, line by line, like the tables on this page.
Free, with no obligation. Prefer to talk? Call (416) 834-2444.
Route Homes is a home renovation contractor in Toronto: design, permits and construction handled by one team.
Every figure is a planning range for September 2026. Your real price comes from a free estimate for your house and your scope.
Low: a house in good shape, layout kept, simpler finishes within the tier. High: an older house, walls moved, better finishes within the tier.
Labour, materials, design and drawings, permits, demolition, disposal, site protection and project management.
HST (13%), contingency, appliances, furniture, window coverings, and exterior work such as roofing, windows and landscaping.
Prices published in 2026 by Toronto renovation companies and the City of Toronto’s 2026 fee schedule, brought into one model where every part adds up.
Route Homes, a Toronto design-build renovation company working since 2006, HCRA-licensed and Tarion-registered.
Renovating a Toronto house costs about $100 to $150 per sq ft at an economy finish, $150 to $250 at a standard finish and $250 to $450 for luxury.
The tier is set less by the tile than by how much of the house is opened up.
How to read this table: Rows are finish tiers; columns show what each tier usually buys. Find the row that matches the finishes and the amount of change you want.
| Finish tier | Cost per sq ft | Finishes | Layout and systems |
|---|---|---|---|
| Economy | $100 to $150 | Laminate or vinyl plank, stock cabinets, laminate or entry quartz, standard fixtures | Layout mostly kept; wiring and plumbing repaired or replaced where walls are opened |
| Standard | $150 to $250 | Engineered hardwood, semi-custom cabinets, quartz, tiled showers, pot lights | Some walls moved; new wiring and plumbing in the renovated areas; better insulation |
| Luxury | $250 to $450 | Custom cabinetry and millwork, solid hardwood or stone, designer fixtures | Open plans with new beams, full rewiring, new heating and cooling, smart controls |
| High-end gut of an older house | $450 to $550 and more | Luxury finishes | Everything back to the studs, plus structural and foundation work (published range) |
Inside one tier, the low number is a house in good shape, with the layout kept and the simpler finishes of that tier. The high number is an older house, some walls moved, more wiring and plumbing, and the better finishes of that tier.
The square footage is the finished floor area above grade. Basements are priced separately, because finishing one is a different job with different costs.
Published 2026 guides from Toronto renovation companies disagree for the same words: one puts a mid-range renovation at $100 to $200 per sq ft, another at $200 to $250. Our tiers say what each one includes, so you can compare like with like.
The house is in fair shape, you keep the layout, and you want new floors, paint, a kitchen and bathrooms that work, with durable, simple finishes.
You open or move some walls, replace old wiring and plumbing while the walls are open, and choose finishes such as engineered hardwood and quartz.
You change the layout, add beams, rewire the whole house and choose custom cabinetry, stone and designer fixtures throughout.
A 1,000 sq ft house costs about $100,000 to $450,000 to renovate, a 1,500 sq ft house $150,000 to $675,000 and a 2,000 sq ft house $200,000 to $900,000, depending on the finish tier.
How to read this table: Rows are house sizes (finished floors above ground) and columns are the three tiers. Each cell is the size times the tier’s price per sq ft.
| House size | Economy | Standard | Luxury |
|---|---|---|---|
| 1,000 sq ft | $100,000 to $150,000 | $150,000 to $250,000 | $250,000 to $450,000 |
| 1,200 sq ft | $120,000 to $180,000 | $180,000 to $300,000 | $300,000 to $540,000 |
| 1,500 sq ft | $150,000 to $225,000 | $225,000 to $375,000 | $375,000 to $675,000 |
| 1,800 sq ft | $180,000 to $270,000 | $270,000 to $450,000 | $450,000 to $810,000 |
| 2,000 sq ft | $200,000 to $300,000 | $300,000 to $500,000 | $500,000 to $900,000 |
| 2,500 sq ft | $250,000 to $375,000 | $375,000 to $625,000 | $625,000 to $1,125,000 |
| 3,000 sq ft | $300,000 to $450,000 | $450,000 to $750,000 | $750,000 to $1,350,000 |
| 3,500 sq ft | $350,000 to $525,000 | $525,000 to $875,000 | $875,000 to $1,575,000 |
Each figure is the house size times the tier’s cost per sq ft, so you can work out any size the same way: 1,700 sq ft at a standard finish is 1,700 × $150 to $250, or $255,000 to $425,000.
Use the finished floor area above grade, the figure on most listings. Leave out the basement and the garage; the basement has its own table below.
A kitchen and a bathroom cost about the same in any house. In a standard 1,000 sq ft bungalow they take about 40% of the budget; in a 2,000 sq ft house, the kitchen and three bathrooms take about 30%.
So small houses usually land near the top of their range.
At the same size and tier, the type of home changes where you land in the range more than the price itself. The examples below use common sizes; for your own house, use its real size.
How to read this table: Each row uses an example size for that type of home; the last column says what pushes that type up or down within its range.
| Home type | Example size | Economy | Standard | Luxury | What changes the cost |
|---|---|---|---|---|---|
| Bungalow | 1,100 sq ft | $110,000 to $165,000 | $165,000 to $275,000 | $275,000 to $495,000 | Everything on one floor, so the kitchen and bathroom are a larger share; often a big basement worth finishing at the same time |
| Semi-detached | 1,500 sq ft | $150,000 to $225,000 | $225,000 to $375,000 | $375,000 to $675,000 | A shared party wall to keep fire-rated and sound-tight; narrow lots make access and material handling slower |
| Townhouse | 1,400 sq ft | $140,000 to $210,000 | $210,000 to $350,000 | $350,000 to $630,000 | Party walls on both sides; in a condo townhouse the corporation’s rules and approvals apply |
| Detached two-storey | 2,200 sq ft | $220,000 to $330,000 | $330,000 to $550,000 | $550,000 to $990,000 | More exterior wall and more windows, and more freedom to move walls, add beams or open the plan |
| Condo apartment | any size | $40,000 to $120,000 for a full unit, before HST (published 2026 range) | No structure or exterior, but building rules: work hours, elevator bookings, insurance and board approval | ||
Condos are priced differently: there is no structure, roof or exterior to deal with, but the building’s rules set the hours, the elevator bookings and what can change. More on condo renovations.
Two houses of the same size and tier can be $100,000 apart. These eight factors decide where in the range a project lands, and most of them are visible at a site visit.
How to read this table: Read each row left to right: the middle column keeps a project near the bottom of its range, the right column pushes it toward the top.
| Factor | Toward the low end | Toward the high end |
|---|---|---|
| Age and condition | Built after about 1980; wiring and plumbing updated | Built before 1960; knob-and-tube, galvanized pipes, plaster walls |
| Layout | Rooms stay where they are | Walls removed, new beams, kitchen or bathroom moved |
| Plumbing | Fixtures stay in place | New drains, a moved stack, an extra bathroom |
| Electrical | The panel has room for new circuits | New panel or service, many new circuits and pot lights |
| Finishes | Standard sizes and in-stock materials | Custom sizes, imported tile, stone slabs |
| Access and site | Driveway parking and easy access | Street parking only, tight side yards, materials carried by hand |
| Permits and approvals | A standard building permit | A minor variance, engineering, heritage or ravine review |
| Decisions and schedule | Choices made before work starts | Changes during construction, a rushed schedule |
At the free site visit we look at each of these, so the estimate you get says where your house sits and why.
These tables are approximate planning ranges, not a quote. Book a free site visit and we will send a written, itemized estimate for your house. Prefer to talk? Call (416) 834-2444.
Want this priced for your home? As a Toronto home renovation contractor, we give itemized quotes after a site visit.
Renovating just the main floor of a 2,000 sq ft two-storey house costs about $104,000 to $477,000; the second floor about $96,000 to $423,000. The two floors together equal the whole-house price.
How to read this table: Rows are parts of a 2,000 sq ft two-storey house; the main and second floor rows add up to the whole-house row.
| Part of the house | Economy | Standard | Luxury |
|---|---|---|---|
| Main floor (about 1,000 sq ft: kitchen, living, dining, powder room) | $104,000 to $157,000 | $157,000 to $261,000 | $261,000 to $477,000 |
| Second floor (about 1,000 sq ft: bedrooms, two bathrooms) | $96,000 to $143,000 | $143,000 to $239,000 | $239,000 to $423,000 |
| Whole house above grade (2,000 sq ft) | $200,000 to $300,000 | $300,000 to $500,000 | $500,000 to $900,000 |
| Basement finish (1,000 sq ft, with a three-piece bathroom) | $50,000 to $70,000 | $70,000 to $100,000 | $100,000 to $150,000 |
| Whole house and basement (3,000 sq ft) | $250,000 to $370,000 | $370,000 to $600,000 | $600,000 to $1,050,000 |
The main floor costs more than the second because it holds the kitchen. Upstairs, the two bathrooms carry most of the budget.
If the electrical panel, the water service or the ductwork has to be replaced anyway, that cost serves the whole house even when only one floor is renovated.
Doing one floor now and one later usually costs more in total: the site is set up twice, and wiring, plumbing and ducts that run between floors get opened twice.
In a standard 2,000 sq ft renovation, the kitchen and bathrooms take about 30% of the budget, the building systems (electrical, plumbing, heating) about 20%, and design, permits and project management about 15%.
How to read this table: Rows are the trades and costs inside a 2,000 sq ft renovation; each column adds up to the total for that tier.
| Line item | What it covers | Economy | Standard | Luxury |
|---|---|---|---|---|
| Design, drawings, engineering and permits | Measured drawings, permit set, structural engineer, City fees | $8,000 to $12,000 | $12,000 to $20,000 | $20,000 to $40,000 |
| Demolition, disposal and site protection | Strip-out, bins, floor and dust protection | $10,000 to $14,000 | $14,000 to $20,000 | $20,000 to $30,000 |
| Structural work and framing | New openings, beams, reframed walls | $7,000 to $12,000 | $12,000 to $25,000 | $25,000 to $55,000 |
| Electrical | Panel, new circuits, pot lights, smoke and CO alarms | $18,000 to $26,000 | $26,000 to $40,000 | $40,000 to $70,000 |
| Plumbing | Supply lines, drains, fixture rough-ins | $14,000 to $20,000 | $20,000 to $32,000 | $32,000 to $55,000 |
| Heating, cooling and ventilation | Ductwork changes, bathroom fans, range hood venting, equipment | $10,000 to $15,000 | $15,000 to $28,000 | $28,000 to $55,000 |
| Insulation and drywall | Insulation where walls are open, drywall, taping | $22,000 to $30,000 | $30,000 to $42,000 | $42,000 to $60,000 |
| Kitchen | Cabinets, counters, backsplash, sink and faucet, lighting (appliances extra) | $25,000 to $40,000 | $40,000 to $70,000 | $70,000 to $140,000 |
| Bathrooms (two full, one powder room) | Tile, waterproofing, vanities, fixtures, glass | $30,000 to $45,000 | $45,000 to $80,000 | $80,000 to $145,000 |
| Flooring (about 1,700 sq ft) | Removal, levelling, underlay, flooring, stair treads | $16,000 to $24,000 | $24,000 to $40,000 | $38,000 to $70,000 |
| Interior doors, trim and stairs | Doors, casings, baseboards, railings, built-ins | $10,000 to $16,000 | $16,000 to $28,000 | $30,000 to $55,000 |
| Painting | Walls, ceilings, trim | $8,000 to $12,000 | $12,000 to $18,000 | $18,000 to $30,000 |
| Project management and site costs | Supervision, scheduling, inspections, cleaning, insurance | $22,000 to $34,000 | $34,000 to $57,000 | $57,000 to $95,000 |
| Total, 2,000 sq ft | Equals the per-sq-ft range times 2,000 | $200,000 to $300,000 | $300,000 to $500,000 | $500,000 to $900,000 |
Add the lines in any column and you get the total for that tier. A good estimate reads the same way: every line priced.
Electrical runs from $18,000 to $70,000 because a few new circuits and a full rewire with a new panel and 60 pot lights are different jobs. Plumbing and heating swing the same way.
Appliances, furniture, window coverings and exterior work (roof, windows, landscaping) are not in these totals.
A medium Toronto kitchen of 100 to 150 sq ft costs about $25,000 to $40,000 at an economy finish, $40,000 to $70,000 at a standard finish and $70,000 to $140,000 for luxury, before appliances.
How to read this table: Rows are kitchen sizes; the last row is the appliance package, which is never inside the kitchen price.
| Kitchen size | Economy | Standard | Luxury |
|---|---|---|---|
| Small or galley (under 70 sq ft) | $15,000 to $25,000 | $25,000 to $45,000 | $45,000 to $80,000 |
| Medium (100 to 150 sq ft) | $25,000 to $40,000 | $40,000 to $70,000 | $70,000 to $140,000 |
| Large with an island (200 sq ft or more) | $40,000 to $60,000 | $70,000 to $110,000 | $140,000 to $220,000 |
| Appliance package (extra, published range) | $5,000 to $8,000 | $12,000 to $20,000 | $35,000 to $70,000 |
How to read this table: Rows are the three kinds of cabinets; ‘compared’ sets each one against the row above it.
| Cabinets | Published price | Compared | Good to know |
|---|---|---|---|
| Stock | $100 to $400 per linear ft | lowest cost | Fixed sizes in 3-inch steps and a few finishes; fastest to get; the economy-tier assumption |
| Semi-custom | $300 to $600 per linear ft | about 1.8× stock | More sizes, finishes and organisers; the standard-tier assumption |
| Custom | $600 to $1,200 and more per linear ft | about 2× semi-custom | Any size, up to the ceiling, any finish; the longest lead time |
How to read this table: Rows run from the least to the most expensive counter; ‘compared’ sets each one against the row above it.
| Countertop | Published price, installed | Compared | Good to know |
|---|---|---|---|
| Laminate | the least expensive option | below entry quartz | Not heat-proof and seams show; fits a tight economy budget |
| Entry quartz | $55 to $80 per sq ft | baseline | Non-porous, never needs sealing; plain colours and small patterns |
| Mid-range quartz | $80 to $110 per sq ft | about 41% more than entry | More patterns and veining; the standard-tier assumption |
| Luxury quartz | $110 to $180 and more per sq ft | about 53% more than mid-range | Marble-look slabs, thicker edges, waterfall ends |
| Granite or marble | varies by slab | usually at or above luxury quartz | Every slab is unique; needs sealing; marble etches with lemon juice and vinegar |
More detail in our kitchen renovation cost guide and on how we plan kitchen renovations.
A main bathroom in Toronto costs about $12,000 to $18,000 at an economy finish, $18,000 to $32,000 at a standard finish and $32,000 to $58,000 for luxury. A powder room is about half that.
How to read this table: Rows are bathroom types and columns are the tiers; each figure covers the whole room, from demolition to the last accessory.
| Bathroom | Economy | Standard | Luxury |
|---|---|---|---|
| Powder room | $6,000 to $9,000 | $9,000 to $16,000 | $16,000 to $29,000 |
| Main bathroom (three or four piece) | $12,000 to $18,000 | $18,000 to $32,000 | $32,000 to $58,000 |
| Primary ensuite | $18,000 to $26,000 | $26,000 to $45,000 | $45,000 to $90,000 |
Waterproofing under the tile, the anti-scald shower valve and a vented fan are where cheap bathrooms fail, so they are in every tier.
More in our bathroom renovation cost guide and on bathroom renovations.
Finishing a Toronto basement with a three-piece bathroom costs about $50 to $150 per sq ft, so $50,000 to $150,000 for 1,000 sq ft. A legal second suite costs about $90 to $200 per sq ft.
How to read this table: The first row is the price per square foot, the size rows multiply it, the legal suite rows price a separate unit, and the last row is an add-on.
| Basement | Economy | Standard | Luxury |
|---|---|---|---|
| Cost per sq ft, finished with a three-piece bathroom | $50 to $70 | $70 to $100 | $100 to $150 |
| 600 sq ft finished | $30,000 to $42,000 | $42,000 to $60,000 | $60,000 to $90,000 |
| 800 sq ft finished | $40,000 to $56,000 | $56,000 to $80,000 | $80,000 to $120,000 |
| 1,000 sq ft finished | $50,000 to $70,000 | $70,000 to $100,000 | $100,000 to $150,000 |
| 1,200 sq ft finished | $60,000 to $84,000 | $84,000 to $120,000 | $120,000 to $180,000 |
| Legal second suite, cost per sq ft | $90 to $120 | $120 to $150 | $150 to $200 |
| 800 sq ft legal second suite | $72,000 to $96,000 | $96,000 to $120,000 | $120,000 to $160,000 |
| Underpinning to lower the floor (added, published range) | $50,000 to $80,000 and more | $50,000 to $80,000 and more | $50,000 to $80,000 and more |
Low basements may need underpinning or a bench footing before any of that, and damp ones need the water dealt with first.
More in our basement renovation cost guide and on basement renovations and legal suites.
A living room renovation costs about $8,000 to $60,000 and a bedroom about $4,000 to $35,000, depending on what is replaced. Flooring runs about $9.50 to $41 per sq ft installed.
How to read this table: The first two rows are single rooms, the flooring row is a rate per square foot, and the rest are whole-house trades that match the line items above.
| Room or system | Economy | Standard | Luxury |
|---|---|---|---|
| Living room (about 250 sq ft): floors, lighting, paint, built-ins | $8,000 to $15,000 | $15,000 to $30,000 | $30,000 to $60,000 |
| Bedroom (about 150 sq ft): floors, lighting, closet, paint | $4,000 to $8,000 | $8,000 to $18,000 | $18,000 to $35,000 |
| Flooring, installed, per sq ft | $9.5 to $14 | $14 to $23.5 | $22 to $41 |
| Painting, whole 2,000 sq ft house | $8,000 to $12,000 | $12,000 to $18,000 | $18,000 to $30,000 |
| Electrical, whole house | $18,000 to $26,000 | $26,000 to $40,000 | $40,000 to $70,000 |
| Plumbing, whole house | $14,000 to $20,000 | $20,000 to $32,000 | $32,000 to $55,000 |
| Heating, cooling and ventilation | $10,000 to $15,000 | $15,000 to $28,000 | $28,000 to $55,000 |
| Interior doors, trim and stairs | $10,000 to $16,000 | $16,000 to $28,000 | $30,000 to $55,000 |
For single rooms, most of the cost is floors, lighting and built-ins. For the whole house, the systems behind the walls cost as much as the finishes you see.
How to read this table: Rows are floor materials; the price includes removing the old floor and preparing the subfloor.
| Flooring | Installed price | Compared | Good to know |
|---|---|---|---|
| Laminate | $9.5 to $14 per sq ft | lowest cost | Hard-wearing surface; not for bathrooms or damp basements |
| Vinyl plank | $9.5 to $14 per sq ft | about the same as laminate | Waterproof core, so a common choice for basements, kitchens and rentals |
| Engineered hardwood | $14 to $23.5 per sq ft | about 1.6× vinyl plank | Real wood on top; more stable than solid wood over concrete or radiant heat |
| Solid hardwood, herringbone | $22 to $41 per sq ft | about 1.7× engineered | Can be sanded and refinished several times; not for basements |
| Porcelain tile | standard to luxury band | depends on size and pattern | The most durable floor in bathrooms, entries and kitchens; cold without a heated floor |
Tell us what you want to renovate. We will see it, write the scope and send a free, itemized estimate, the surest way to know which tier your project is in.
Houses built before about 1970 often hide $15,000 to $40,000 of extra work, found at demolition: old wiring, galvanized or lead water lines, cast-iron drains, asbestos and foundation problems.
How to read this table: Rows are the usual surprises in older houses, when they show up, and the range Toronto companies publish.
| Older-house item | When it comes up | Published 2026 range |
|---|---|---|
| Asbestos abatement | Plaster, old tile, pipe insulation, vermiculite | $6 to $18 per sq ft |
| Mould remediation | Basements, behind old bathrooms | $4 to $5 per sq ft |
| Electrical panel upgrade | Kitchen, heat pump or EV charger on an old service | $1,500 to $2,500 |
| Foundation repairs | Cracks, leaks, failed parging | $25,000 to $60,000 |
| Underpinning | Lowering a basement floor for headroom | $50,000 to $80,000 and more |
| Waste bins | Every demolition | $500 to $1,500 per bin |
| Temporary housing | Whole-house renovations | $3,000 to $12,000 and more; short-term rentals $8,000 to $20,000 and more |
| All hidden costs together, pre-1970 houses | Found at demolition | $15,000 to $40,000 |
Asbestos and other designated substances must be identified before construction starts. Knob-and-tube wiring, undersized panels and low basements are the most common surprises in older houses.
Our estimates spell out allowances and exclusions, and changes are agreed in writing, so anything found behind a wall is priced and approved before that part of the work goes ahead.
The City of Toronto charges $11.53 per m² for a permit to renovate a house interior in 2026, with a $214.79 minimum. Drawings and engineering usually cost more than the permit, and HST adds 13% to the whole contract.
How to read this table: Rows marked City of Toronto are 2026 fees; the others are published ranges and rules. The amount column shows how each fee is worked out.
| Cost | Amount | Source |
|---|---|---|
| Building permit, interior alterations | $11.53 per m² (150 m² = $1,729.50) | City of Toronto, 2026 |
| Building permit, renovation with floor replacement | $13.41 per m² | City of Toronto, 2026 |
| Building permit, addition | $18.56 per m² (40 m² = $742.40) | City of Toronto, 2026 |
| Building permit, basement finishing | $6.20 per m² (80 m² = $496) | City of Toronto, 2026 |
| Each new residential unit | $56.33 | City of Toronto, 2026 |
| Minimum permit fee | $214.79 | City of Toronto, 2026 |
| Heating and ventilation permit (house) | $214.79, or $270.64 with air conditioning | City of Toronto, 2026 |
| Zoning certificate, when needed | $644.38 | City of Toronto, 2026 |
| Architectural or permit drawings | $5,000 to $20,000 (basement sets $2,000 to $5,000) | Published 2026 ranges |
| Structural engineering | $3,000 to $8,000 | Published 2026 ranges |
| HST | 13% of the contract | Ontario |
| Contingency | 10% cosmetic, 15% kitchens, bathrooms and whole houses, 25% or more before 1960 | Published 2026 guidance |
The permit fee is the rate times the floor area of the work: about $1,730 for 1,600 sq ft of interior work, against $5,000 to $20,000 for the drawings behind it.
Most real renovations need a permit: removing or changing walls, moving plumbing, adding a bathroom, changing ductwork, underpinning, a second suite or an addition. Painting, flooring and replacing cabinets in place usually do not.
A standard 1,500 sq ft full renovation comes to about $292,000 to $487,000 once a 15% contingency and HST are added. The table shows how each total is built.
How to read this table: Each row starts from the tables above, adds a 15% contingency, then 13% HST.
| Budget example | Construction estimate | With 15% contingency | With HST (13%) |
|---|---|---|---|
| 1,500 sq ft semi, full interior, standard finish | 1,500 × $150 to $250 = $225,000 to $375,000 | $259,000 to $431,000 | $292,000 to $487,000 |
| Kitchen, main bathroom and ensuite, standard | $40,000 to $70,000 + $18,000 to $32,000 + $26,000 to $45,000 = $84,000 to $147,000 | $97,000 to $169,000 | $109,000 to $191,000 |
| 800 sq ft basement to a legal second suite, standard | 800 × $120 to $150 = $96,000 to $120,000 | $110,000 to $138,000 | $125,000 to $156,000 |
Contingency is money set aside, not money spent. HST is charged on the contingency only if you use it.
A bathroom takes about 3 to 5 weeks of construction, a kitchen 4 to 8 weeks and a whole 2,000 sq ft house about 3 to 6 months, plus design and permit time before work starts.
How to read this table: Design and permits come before any work in the house; construction is the time the house is a site.
| Project | Design and permits | Construction |
|---|---|---|
| Bathroom | 2 to 4 weeks | 3 to 5 weeks |
| Kitchen | 3 to 6 weeks | 4 to 8 weeks |
| Basement finish | 3 to 6 weeks | 8 to 12 weeks |
| Legal second suite | 6 to 10 weeks | 10 to 16 weeks |
| One floor of a house | 6 to 10 weeks | 8 to 14 weeks |
| Whole house, about 2,000 sq ft | 8 to 16 weeks | 3 to 6 months |
A finishes-level project can be shorter: our 4,300 sq ft interior renovation (floors, paint, kitchen, washrooms and wall panels) took two and a half months.
What slows a project: comments on the permit drawings, a minor variance, long-lead cabinets or windows, and decisions left until the trades are waiting. Time costs money too, as temporary housing when you move out.
Changes made during construction commonly add 15% to 30% to their part of the job. Choose layouts and finishes before work starts.
Moving a sink, toilet or shower means new drains and venting. Keeping them in place is the biggest single saving in kitchens and bathrooms.
Spend on the kitchen and main bathroom, and use economy finishes in secondary rooms. Published guides put the saving at 20% to 30% on materials.
One set-up, one permit and one pass through the walls costs less than two smaller renovations.
Cabinets, windows and special tile can take weeks. Ordering on time avoids paying a crew to wait.
10% for cosmetic work, 15% for kitchens, bathrooms and whole houses, 25% or more for houses built before 1960.
We do not publish project prices: the house, the scope and the finishes set them.
We walk the house with you and look at the panel, the plumbing, the basement and the walls you want to change.
Room by room: what is removed, built, replaced and upgraded, and what is excluded.
Every line priced, like the line-item table above, so you can compare quotes on scope, not on the total.
Tile, cabinets, fixtures and flooring as allowances you can raise or lower.
What needs a permit, drawings or an engineer, and what that adds to the plan.
A written timeline for design, permits and construction, so you can plan the move and the money.
Call (416) 834-2444, email Sales@routehomes.ca or book a site visit online, and we will arrange the visit.
Two federal tax credits can apply to renovation costs:
The City of Toronto’s Basement Flooding Protection Subsidy Program helps pay for a backwater valve or a sump pump. Amounts and rules change, so check the current program before counting on it.
About $100 to $450 per sq ft. For a 2,000 sq ft house: $200,000 to $300,000 at an economy finish, $300,000 to $500,000 standard and $500,000 to $900,000 luxury, before HST.
About $100,000 to $150,000 at an economy finish, $150,000 to $250,000 standard and $250,000 to $450,000 luxury. Small houses tend toward the top of each range.
About $150,000 to $225,000 economy, $225,000 to $375,000 standard and $375,000 to $675,000 luxury, before contingency and HST.
About $250,000 to $375,000 economy, $375,000 to $625,000 standard and $625,000 to $1,125,000 luxury.
About $50 to $150 per sq ft with a three-piece bathroom, so $50,000 to $150,000 for 1,000 sq ft. A legal second suite is about $90 to $200 per sq ft.
About $25,000 to $140,000 for a medium kitchen of 100 to 150 sq ft; $40,000 to $70,000 at a standard finish, plus appliances.
About $12,000 to $58,000 for a main bathroom, $18,000 to $32,000 at a standard finish. An ensuite runs $18,000 to $90,000.
The ranges on this page do not. Ontario HST is 13%, so $100,000 of work becomes $113,000. Always check whether a quote includes it.
In 2026: $11.53 per m² for interior alterations, $18.56 per m² for an addition and $6.20 per m² to finish a basement, with a $214.79 minimum.
About 10% for cosmetic work, 15% for kitchens, bathrooms and whole houses, and 25% or more for houses built before 1960.
For about 2,000 sq ft, plan 8 to 16 weeks for design and permits and 3 to 6 months of construction. A finishes-only renovation can be faster.
For a single room, usually yes. For a whole-house renovation, most families move out: water and power get shut off, and there is dust and demolition. Budget for temporary housing.
If the foundation and structure are sound, renovating usually costs less. We compare both in Is it cheaper to renovate or rebuild?
Usually because they price different scopes. Compare the line items, what is excluded, the finish allowances, who handles permits, how changes are priced and the warranty.
No. The figures are approximate planning ranges for September 2026. A quote needs a site visit and a written scope; we do both for free.
Because the same size and tier can be a simple house with the layout kept, or an older house with walls moved and systems replaced. The low-and-high table above shows the eight factors.
Yes. We visit the house, go through what you want, and send a free, itemized estimate for your project in writing.
The ranges on this page are approximate. Your free estimate is not: a site visit, a written scope and an itemized price for your house. Call (416) 834-2444 or book online.
Ready for a real number? Work with Route Homes, a home renovation contractor in Toronto, from the site visit to the final inspection.