Services / Kitchen Renovations

Kitchen renovation Toronto

A kitchen renovation involves almost every trade in the house: plumbing, electrical, ventilation, flooring, cabinetry and stone. We design and build kitchens across Toronto and the GTA, and take care of the permits when walls, plumbing or gas lines move.

$5M Liability Insurance
WSIB Coverage
Licensed Trades
Permit Coordination
2-Year Workmanship Warranty
Kitchen renovations

A kitchen renovation built around how you cook

Most kitchen renovations start with a complaint: not enough counter space, no room for two people to cook, cabinets that do not close properly, or a closed-off room in a house where everyone wants to be together. The fix is usually the layout first, then cabinetry and finishes.

Because we also do full home renovations, we plan a kitchen with what is behind the walls in mind: whether the wall you want gone is load-bearing, whether the electrical panel can take an induction range, and where the range hood can actually vent.

Kitchen work we do

Kitchen remodel services, from layout to lighting

Every kitchen is different, but most projects include some of these.

01

Layout Redesign

Moving the sink, range or fridge, adding an island or turning the room around so it works for how you cook.

02

Open-Concept Kitchens

Removing or opening up walls, with the engineering, beams and permit a load-bearing wall needs.

03

Custom Cabinetry

Cabinets built to the room: full-height pantries, deep drawers and built-ins, not whatever fits a standard box.

04

Counters and Backsplash

Quartz, porcelain slab or natural stone, templated after the cabinets are in so the fit is exact.

05

Lighting and Electrical

Pot lights, pendants, under-cabinet lighting, dedicated appliance circuits and outlets where you need them.

06

Kitchens in Condo Units

Kitchens in condo units, planned around fixed plumbing stacks and building rules.

Before you choose cabinets

Decide the kitchen layout before the cabinets

Layout comes first. Moving the sink or range means moving drains, water lines, gas or a 240-volt circuit, and that usually needs a permit. Taking out a wall to open the kitchen to the dining room needs an engineer’s check and, if the wall is load-bearing, a beam, posts and a building permit.

Ventilation is next. A range hood should vent outside, not recirculate, and a powerful hood in a tight house may need make-up air. Then come the details people regret skipping:

  • enough outlets on the island
  • under-cabinet lighting
  • drawers sized for your pots
  • a full-height pantry instead of more upper cabinets
01
Layout and workflow
02
Structural walls
03
Plumbing and gas moves
04
Ventilation
05
Electrical capacity
Cabinets and counters

Kitchen cabinets, counters and appliances

Cabinets carry most of the budget and take the most daily wear. Look at the box material (plywood holds screws and resists moisture better than particleboard), full-extension soft-close drawers, and a finish that suits how hard the kitchen is used: painted doors look refined but show chips; laminate and melamine are tougher.

Quartz is the most common counter choice: consistent, non-porous and easy to live with, though it does not like hot pots straight off the stove. Granite and marble need sealing and gentler care. Porcelain slab is thin, very heat and scratch resistant, and suits a modern look.

Panel-ready fridges and dishwashers need matching fronts, an induction range needs its own circuit, and some appliances have long lead times. Having the exact models early is what makes everything fit on installation day.

Galley, L-shape or island

Kitchen layouts that suit Toronto houses

In the narrow semis and row houses of older neighbourhoods, galley and single-wall kitchens are often the best use of the width. An island only works when there is room to walk around it: about 42 inches (1.07 m) of clear walkway is a common guideline, more if two people cook at once.

Wider houses can take an L or U shape with an island, which gives the most counter and storage. Opening the kitchen to the dining or living room usually means removing a wall, and in many Toronto houses that wall carries the floor above, so it needs a beam, an engineer and a permit.

01
Galley
02
Single wall with island
03
L-shape
04
U-shape
05
Open concept
Planning a kitchen?

Tell us what is not working in your kitchen

The size of the room, what bothers you about it and what you want instead. We will tell you what it is likely to involve (walls, plumbing, venting, permits) before we book a site visit to measure.

Small kitchens, rentals and resale

Small kitchens, rental units and resale

In a narrow semi or a condo, a small kitchen works when every centimetre is planned: cabinets to the ceiling, a counter-depth fridge, drawers instead of lower doors, a sink sized to the room and a slim range hood that still vents outside. Lighter upper cabinets or a run of open shelving keeps a small room from feeling boxed in.

For a rental unit or a basement suite, choose what stands up to years of tenants: a hard-wearing counter such as quartz or a good laminate, porcelain or vinyl plank flooring, standard-size appliances that are easy to replace, and plain, durable cabinet doors. A simple layout keeps the cost down and repairs easy.

Buyers notice condition before custom features. If you are selling soon, new fronts, counters, hardware and lighting often do more for the listing than a full custom kitchen, and the kitchen is out of service for far less time.

If you are buying a house you plan to renovate, get the kitchen priced before you firm up, especially if a wall has to come out or the kitchen has to move, because those two decisions drive the cost.

Order of work

The order of work in a kitchen renovation

01

Measure and Check the Walls

We measure the room, check the walls, plumbing and electrical, and talk through how you use the kitchen.

02

Layout, Cabinet Design and Budget

Layout options, cabinet design and finish selections, with a budget attached to each choice.

03

Kitchen Permits Where Needed

When plumbing, gas, structure or electrical changes, we apply for the building permit and arrange the ESA permit.

04

Tear-Out and Kitchen Rough-In

The old kitchen comes out, then plumbing, gas, electrical and ventilation are roughed in and inspected.

05

Cabinets, Templating and Counters

Cabinets go in first, counters are templated and installed, then backsplash, lighting and appliances.

06

Door, Drawer and Appliance Check

We check every door, drawer and appliance with you and close out any deficiencies.

Budget and timing

Budget and timeline for your kitchen

What moves the price most:

  • the size of the kitchen
  • the cabinetry: stock, semi-custom or custom
  • the counter material
  • how much plumbing, gas and electrical moves
  • whether a wall comes out

Our kitchen renovation cost guide has current Toronto ranges.

On site, most kitchen renovations take several weeks, longer when walls or plumbing move. Custom cabinets and stone counters have their own lead times, so selections are made and orders placed with the demolition date in mind, to keep the kitchen out of service for as short a time as possible.

Full scope

What a full kitchen renovation in Toronto includes

A kitchen renovation is several trades working in a tight order. When we price a full kitchen, the scope usually covers:

  • Protection and demolition: floors and the rest of the house protected, old cabinets, counters and flooring removed and disposed of.
  • Structure: any wall removal, beam and posts designed by an engineer, with a building permit.
  • Plumbing and gas: new supply and drain lines for the sink, dishwasher and fridge water line; gas lines moved or added by a licensed gas technician.
  • Electrical: dedicated circuits for the range, dishwasher, microwave and fridge, counter and island outlets, and new lighting, with an ESA inspection.
  • Ventilation: a range hood ducted to the outside, sized for the cooktop.
  • Walls and floors: insulation where exterior walls are opened, new drywall, a level subfloor and the new flooring.
  • Cabinets, counters and backsplash: cabinets installed and levelled first, counters templated and installed after, then the backsplash.
  • Finishing: appliances, fixtures, trim and paint, then final inspections and a walkthrough with you.

Knowing the full scope up front is what makes a quote comparable. If one price leaves out ventilation, electrical upgrades or disposal, it is not cheaper, just incomplete.

Older Toronto houses

What we find behind the walls of older Toronto kitchens

Many Toronto kitchens sit in houses built before the 1950s, and opening the walls is when the surprises appear. The most common ones:

  • Old wiring: knob-and-tube or ungrounded circuits that cannot safely carry a modern kitchen. They are replaced, and many insurers expect it anyway. Read more about knob-and-tube wiring and insurance in Toronto.
  • Old pipes: galvanized steel supply lines that clog and corrode, and in houses built before the mid-1950s, sometimes a lead water service pipe.
  • Uneven floors: joists that have sagged over decades, which have to be levelled before cabinets and stone go in.
  • Plaster and lath walls: heavier and slower to remove than drywall, and often hiding earlier repairs.
  • Past renovations: notched joists, unvented drains or wiring added without a permit, which we correct rather than cover up.

We check what we can at the site visit and build a contingency into older-house budgets, so these findings change the plan, not the whole budget.

The details that matter daily

Kitchen lighting, outlets and storage people forget to plan

The decisions that make a kitchen pleasant to use every day are small, and they are easy to miss until the drywall is closed:

  • Layered lighting: general ceiling light, under-cabinet task lighting over the counters, and a pendant or two over the island, each on its own switch or dimmer.
  • Outlets where you work: enough counter outlets for small appliances, outlets on the island, and a charging drawer so phones stay off the counter.
  • Waste sorting: a pull-out with space for garbage, recycling and Toronto’s green bin organics, next to the sink.
  • Storage that works: deep drawers for pots instead of lower doors, a pull-out pantry, dividers for trays and cutting boards, and a spot for the microwave that keeps it off the counter.
  • Appliance clearances: space for the fridge door to open fully, and a landing area of counter beside the fridge, range and sink.

We go through these with you during design, because each one affects where wiring, cabinets and plumbing go before anything is built.

Choosing a contractor

How to choose a kitchen renovation contractor in Toronto

Most kitchen problems trace back to the contractor, not the cabinets. Before you sign, ask:

  • Who pulls the permits? The contractor should apply for and close the building permit, and book the inspections, not leave it to you.
  • Is the quote itemized? A single lump sum hides what is included. Ask for a written, line-by-line price and a clear list of allowances.
  • Insurance and WSIB: ask for a certificate of liability insurance and WSIB coverage before work starts. We carry $5M liability insurance and WSIB coverage.
  • Licensed trades: electrical work should be done by a licensed electrical contractor with an ESA notification, and gas work by a TSSA-registered gas technician.
  • Warranty in writing: what is covered and for how long. Our workmanship warranty is 2 years.
  • Payment schedule: payments tied to finished stages of work, not large sums up front.
  • Who coordinates the cabinet order? Custom cabinets can take several weeks to build, so the order and the demolition date have to line up.

As a design-build kitchen renovation contractor in Toronto, we handle the layout, the permits and the construction with one team, and we quote each line so you can see where the money goes. For current price ranges, see our kitchen renovation cost guide.

Where we work: across Toronto and the GTA, including North York, Vaughan, Richmond Hill, Markham, Newmarket and King City.

Frequently asked questions

Kitchen remodel questions

Not for replacing cabinets, counters and appliances in the same spots. You do need a building permit when plumbing or gas lines move, a wall comes out or ventilation changes, and electrical work needs an ESA permit. We confirm this at the site visit.

It depends on size, cabinetry, counters, how much plumbing and electrical moves and whether walls come out. After a site visit we give you a written quote.

Several weeks on site for most kitchens, longer when walls or plumbing move. Custom cabinets and stone have lead times, which we plan for before the old kitchen comes out.

Usually yes. If the wall is load-bearing, an engineer designs a beam and posts and a building permit is required. In a condo, walls may hold shared pipes or be restricted by the building. See Can I remove walls in a condo?

Often yes, but check first. An induction range needs its own 240-volt circuit and enough capacity in your electrical panel. A larger hood should vent outside and, in a tight house, may need make-up air. We check both before you buy appliances.

No. We work through the layout and cabinet design with you. If you already have a designer or drawings, we build from them and flag anything that will not work on site.

Yes. Tarion does not cover renovations, so your kitchen is covered by our own 2-year workmanship warranty, plus the manufacturers’ warranties on cabinets, counters and appliances.

Usually the cabinetry, followed by counters and appliances. Moving plumbing, gas or walls adds labour and permits, which is why the layout decision has the biggest effect on the total.

A strong range hood pulls a lot of air out of the house. If the same amount of air cannot get back in, the hood underperforms and, in a house with gas or wood-burning appliances, it can pull their exhaust back indoors. That is why larger hoods may need a make-up air system. We check the hood’s rating against your house and appliances before you buy it.

Usually yes. Set up a temporary kitchen with the fridge, a microwave and a kettle in another room, and expect short water and power shut-offs. We seal the work area and plan the order of work so the kitchen is out of service for as short a time as possible.

Professional credentials
Accredited excellence. Trusted craftsmanship.

Recognized credentials and professional affiliations supporting Route Homes projects across Toronto and the GTA.

Plan your kitchen

Bring your kitchen wish list and we will check what the walls allow

At the site visit we measure the room, check which walls carry load, look at the electrical panel and where a range hood can vent, then talk through layouts with a budget for each.

Google reviews

What our clients say on Google