Route Homes is a design-build general contractor for commercial fit-outs in Toronto: restaurants and cafés, retail and franchise units, and indoor sports venues. One team takes your unit from drawings through the building permit and, for food businesses, the Public Health review to opening day.
Most of our commercial work is interior fit-outs: turning a vacant or tired unit into a business that opens on time, passes its inspections and stands up to daily use.
We work with new tenants (ideally before they sign the lease), franchisees opening a location, and owners improving a unit or a plaza.
At the Fresh Slice pizza store on Bloor Street, one team took a vacant 900 sq ft unit from the first drawings to food prep areas, accessible washrooms and a new storefront.
One team covers design, engineering, the permit, demolition, framing, mechanical, electrical and plumbing, millwork and finishes. Each card opens a finished project.
Design-build fit-outs from an empty unit to opening day: kitchen prep areas, accessible washrooms, finishes and the storefront.
Full commercial kitchen integration with mechanical, electrical and plumbing upgrades, managed from site preparation to finishes.
Simulator bays with the space planning, acoustic coordination and technical integration the equipment needs.
Regulation courts, sports flooring, court striping, lighting, acoustic treatment and spectator areas in large units.
Indoor playgrounds built around layout planning, safety compliance and finishes made for hard use.
Franchise store fit-outs, such as a bubble tea location for Chatime, built to open as a working store.
The unit you choose sets most of the budget, so walk it with a contractor before the lease is final. Check:
Then get the landlord’s work in writing. Whatever the work letter does not assign to the landlord, plan to pay for yourself.
The work letter is the part of the lease that says who builds what. It should list what the landlord delivers, for example base-building HVAC, the electrical service, a demised unit or washrooms.
It should also list what you build, any tenant allowance, and the dates for each. It answers the question every tenant asks: who pays for the build-out.
1. Building permit. Interior alterations to a commercial unit need one even when no floor area is added, and so does a change of use with no construction. A store becoming a restaurant is a change of use, from a mercantile to an assembly occupancy.
2. Drawings and plan review. Drawings by a qualified designer, with their registration on them. Once the application is complete, the Code sets review times: 15 business days for a small building, 20 for a large one and 30 for a complex one.
3. Toronto Public Health. A food business notifies Public Health and submits its floor plan before construction, and the City’s Sewers By-law requires a grease interceptor on its drains.
4. Inspections, licence and signs. City building inspections in stages, the ESA for the electrical, Public Health before a food premises opens, and a separate permit for permanent signs.
Change of use: under the Ontario Building Code a store is a mercantile occupancy and a restaurant an assembly occupancy, so exits, washrooms, fire separations and fire protection are reviewed for the new use.Drawings: the designer must be qualified as the Building Code defines it (Division C, Section 3.2), and the application includes information about the building’s existing life safety systems. The review clock does not run while information is missing, so a complete first submission saves weeks.Public Health plan: kitchen equipment and exhaust canopies, dishwashing and utensil sinks, handwash basins, food and waste storage and staff washrooms are reviewed against Ontario’s Food Premises Regulation. We settle the equipment list before the plan goes in.Business licence: in most cases a new Eating or Drinking Establishment licence needs an approved Zoning Review for Business Licence first. Permanent signs need their own permit under the Toronto Sign By-law.
Send the address, the listing and what you plan to run there. We will tell you what the unit is likely to need for your use (power, exhaust, washrooms, permits) before you commit to it.
A restaurant build-out is decided in the kitchen. Cooking equipment needs ventilation to NFPA 96, the standard the Building Code points to:
a Type I hood and ductwork to the outside
make-up air to replace what the hood pulls out
fire suppression over the cooking line
A licensed gas technician connects the gas, and the electrical service is sized for the full equipment list, not just the lights.
Equipment often sets the opening date. Hoods, walk-in coolers, specialty cooking equipment and storefront glazing have lead times, so we settle the equipment list during design and order as soon as the drawings allow.
Plumbing: a grease interceptor on the drains, handwash basins close to where food is handled, dishwashing and utensil sinks, floor drains where the equipment needs them, and washrooms for staff and guests, including a barrier-free washroom where the Code requires one.Our restaurants: at Gyu Gyu Hot Pot & Japanese Grill in Markham (2,000 sq ft) we integrated a full commercial kitchen with mechanical, electrical and plumbing upgrades and managed construction from site preparation to finishes. We have also built turnkey pizzerias and a burger restaurant, including Bonito’s Pizzeria & Gelato and Patty Slaps.
The owner of a pizza store we built described the team on Google as professional, reliable and easy to work with.
Indoor sports venues are assembly occupancies under the Building Code, so the number of people the space can hold drives the design: exits, washrooms, fire separations and, in some buildings, sprinklers.
Most move into former industrial units, which is a change of use, so the drawings must show the building can safely hold a full house.
Recent fit-outs with photos, size, year and scope: a restaurant, pickleball, indoor golf and an indoor playground. Open any project to see what we built.
There is no honest single price per square foot: the same 2,000 sq ft can be a light retail refresh or a restaurant with a new kitchen. After a walkthrough and your equipment list, you get a written budget for your unit.
The schedule is driven by the drawings, the permit review, the Public Health plan review for food businesses, equipment lead times and the opening inspections. These often decide the opening date more than construction does, so they start first.
When the scope is clear, site work moves quickly: a plaza exterior with new paving, a retaining wall, painting and landscaping took two weeks.
We walk the unit with you, check power, gas, exhaust routes, drains, washrooms and clear height, and tell you what your use will need.
Space plan and equipment layout, then the architectural, structural and mechanical drawings, with the budget developed alongside.
Building permit and, for food businesses, the Toronto Public Health plan review. Long-lead equipment is ordered as soon as the drawings allow.
Demolition, framing, mechanical, electrical and plumbing rough-in, City and ESA inspections, then finishes and millwork.
Final building inspection and, for food premises, the Toronto Public Health inspection, timed so you can apply for your business licence.
A walkthrough with you, deficiencies closed, and the manuals and warranty papers for the equipment and systems we installed.
Franchisees: a fit-out answers to the City’s rules and the brand’s. The franchisor usually supplies a design package and may approve the drawings and inspect before opening.
A package written for another city does not always cover Toronto’s permit, Public Health or grease interceptor rules, so we adapt it to the unit first.
Landlords: a clean, demised shell with a code-compliant electrical service and washrooms leases to the widest range of uses; a unit fitted for a restaurant attracts restaurant tenants but narrows the field.
Property managers set the work hours, loading and elevator rules, and receive our insurance and WSIB certificates.
Yes, for most work beyond paint and flooring. Interior alterations to a commercial unit need a building permit even when no floor area is added, and a change of use needs one even with no construction. Electrical work is inspected by the ESA, and permanent signs need a sign permit.
Usually a building permit for the fit-out (often with a change of use), a Toronto Public Health plan review and pre-opening inspection, ESA inspection, and an Eating or Drinking Establishment licence, which usually needs a Zoning Review for Business Licence first. Signs and patios have their own approvals.
It depends on the unit, so you get a schedule after the walkthrough rather than a standard number. Design and permits come first: the Building Code review alone runs 15 to 30 business days once the application is complete, and hoods and specialty equipment have lead times.
It varies too widely for one honest number: a light retail refresh and a restaurant with a new kitchen, exhaust and washrooms are priced very differently. You get a written budget after a walkthrough.
Whatever the lease says. The work letter sets out what the landlord delivers, what the tenant builds and any tenant allowance. Read it with your contractor and your lawyer before you sign.
Sometimes. Depending on the scope and the building’s rules, work can often be phased, or the noisiest work scheduled outside opening hours. Rebuilding a kitchen or the washrooms usually means closing that part for a while, which we plan with you before pricing.
Both. At Fresh Slice we handled design, engineering, permits and construction; at Gyu Gyu we provided construction management for the fit-out. If you already have drawings, we review them for buildability and cost before we price the job.
Yes. We have built two 6ix Iron Indoor Golf venues in Toronto, including the renovation, space planning, acoustic coordination and simulator integration. Clear height, bay width, power and data, and cooling for the equipment are checked before you commit to a space.
Yes: $5M liability insurance and WSIB coverage, with licensed trades for electrical, plumbing and gas work. We supply the certificate of insurance landlords and property managers ask for.
Toronto and the GTA, from our office in Vaughan. We have also built commercial projects further afield, in Hamilton, Cambridge, Montreal and Saskatoon.
Projects we have completed: Fresh Slice Pizza Store · Bonito’s Pizzeria & Gelato · 6ix Pickle · 6ix Iron Indoor Golf – Downtown · Chatime · 6ix Iron Indoor Golf – Yorkville · Creative Playzone · Gyu Gyu Hot Pot & Japanese Grill · King St, Cambridge, Plaza · Patty Slaps
Tell us the address, the size and what you plan to open. We will walk the unit with you, flag what your use will need and give you a written budget for the fit-out.