Kitchens, main floors, basements, walkouts and secondary suites in Woodbridge, Maple, Kleinburg, Thornhill and Concord. Route Homes works from an office on Keele Street and plans every Vaughan renovation around the city’s zoning, permits and heritage rules.
Most Vaughan homes are single-detached houses (62.5% in the 2021 Census) and most households own their home (85.9%, well above the provincial rate). That shapes the work: kitchens, main floors, basements and suites in houses their owners live in.
At 56 Chesney Cres we enlarged the windows, redid the kitchen and added a bedroom and storage; in Kleinburg we finished a 1,500 sq ft basement with a full kitchen, custom cabinetry and new lighting.
Most Vaughan projects combine a few of these.
New layouts, custom cabinetry and open main floors, with the structure checked before a wall comes out.
Finished basements, second kitchens and walkouts, with the permit, grading and engineering a walkout needs.
Self-contained suites built to the City’s size, entrance and fire rules, with their own permit.
Ensuites and main bathrooms rebuilt from the subfloor up, waterproofed under the tile.
Larger windows and new openings, like the tall windows at Chesney Cres, with the headers designed and permitted.
Several floors renovated together so the structure, services and finishes are done once.
Vaughan adopted a new Comprehensive Zoning By-law, 001-2021, but it is under appeal at the Ontario Land Tribunal. Until that is settled, the older By-law 1-88 stays in effect across the city.
Applications that are not covered by the new by-law’s transition rules have to comply with both.
For a kitchen or a bathroom inside the house, this rarely matters. For anything that changes the outside or the use of the house, it does: an addition, a basement walkout, a deck, a new entrance or a secondary suite.
We check the design against both by-laws before drawings go to the City.
Every basement walkout in Vaughan needs a building permit, applied for through the City’s online permitting portal. The drawings must carry the qualified designer’s name, registration and BCIN, a signature and a statement taking responsibility for the design.
An engineer must design it when the foundation sits less than 1,200 mm below the ground beside it, or when the stairs need a retaining wall over 1,000 mm.
The City also asks for a lot grading permit, plus conservation authority or heritage approval where they apply.
Vaughan allows a secondary suite in specific single detached, semi-detached and street townhouses. It must be self-contained, with its own kitchen, bathroom and separate entrance, and it can take up to 45% of the main house’s floor area, but not less than 35 m².
The City’s rules also cover:
Parking and suite rules have been changing under provincial housing law, so we confirm the current requirement for your address before design. Fire separation, alarms and exits are explained on our basement and legal suite page.
Send the address and a few photos. We will check what the zoning and the City’s permit rules mean for your project, from a new kitchen to a walkout or a suite, before we visit.
Vaughan has four heritage conservation districts: Kleinburg-Nashville, Maple, Thornhill and Woodbridge. In them, exterior changes such as windows, porches, additions and cladding go through the City’s heritage review, so we allow time for it and design with it in mind.
Trees count too. Vaughan protects private trees of 20 cm in diameter or more, and the standard first response to a permit request is 30 business days. Footprints and excavation are planned around them early.
We see the house, talk through what you want and the budget, and note what the City will need.
The design is checked against By-law 1-88 and By-law 001-2021 before drawings start.
Drawings carrying the designer’s name, registration and BCIN, and an engineer’s design where required.
Building permit online, plus lot grading, tree or heritage approvals where the project needs them.
Demolition, structure, rough-ins, inspections by the City’s Building Standards staff, then finishes.
A walkthrough of the finished work, deficiencies closed and the warranty in writing.
Both, for now. By-law 1-88 remains in effect while the new By-law 001-2021 is under appeal, and applications not covered by its transition rules must comply with both.
Yes. Every walkout needs a building permit, drawings by a qualified designer and a lot grading permit, and an engineer in some cases.
In specific detached, semi-detached and street townhouses, yes, with a permit. The suite can take up to 45% of the house’s floor area and must be at least 35 m².
Yes. The City of Vaughan requires renovators and contractors to hold a City of Vaughan business licence, and you can check a contractor’s status with the City.
For a private tree of 20 cm in diameter or more, yes. The City’s standard first response is 30 business days, so apply early.
If it is inside one of the four heritage conservation districts, exterior changes go through heritage review. We check the address first.
It depends on the size, the scope and the finish level, and on permit work such as a walkout or a suite. You get a written quote after a site visit.
At 7250 Keele St in Vaughan.
Projects we have completed: 56 Chesney Cres, Vaughan
We come from our office on Keele Street, look at the house with you, go through what you want and the budget, and follow up with a written quote.