A home addition in Toronto costs about $325 to $550 per sq ft to build in 2026: $325 to $375 economy, $375 to $450 standard and $450 to $550 luxury, before HST. Approximate, not a quote.
These ranges are a starting point. For your own addition, we check the zoning and the structure first, then price the work line by line.
A one-storey rear addition of 400 sq ft costs about $130,000 to $220,000 to build, and a 1,000 sq ft second storey about $325,000 to $550,000, before design, permits and HST.
How to read this table: Rows are addition types with an example size, columns are the finish tiers; each figure is construction only.
| Addition | Example size | Economy ($325 to $375 per sq ft) | Standard ($375 to $450 per sq ft) | Luxury ($450 to $550 per sq ft) |
|---|---|---|---|---|
| One-storey rear addition: family room or kitchen extension | 400 sq ft | $130,000 to $150,000 | $150,000 to $180,000 | $180,000 to $220,000 |
| Two-storey rear addition | 600 sq ft (300 per floor) | $195,000 to $225,000 | $225,000 to $270,000 | $270,000 to $330,000 |
| Addition over a garage | 300 sq ft | $97,500 to $112,500 | $112,500 to $135,000 | $135,000 to $165,000 |
| Second storey on a bungalow | 1,000 sq ft | $325,000 to $375,000 | $375,000 to $450,000 | $450,000 to $550,000 |
Small additions cost more per square foot: a foundation, a roof tie-in and a permit cost almost the same for 150 sq ft as for 400 sq ft. The home renovation cost guide describes each finish tier in detail.
Design, engineering and the permit set add about $8,000 to $40,000 depending on size and finish. A minor variance, foundation repairs or temporary housing apply only to some projects.
| Cost | 2026 range | When it applies |
|---|---|---|
| Survey and site plan | $2,000 to $3,500 | Almost always, to show the lot lines and setbacks |
| Design, drawings, structural engineering and permit set, with City fees | $8,000 to $12,000 economy, $12,000 to $20,000 standard, $20,000 to $40,000 luxury | Always |
| Building permit fee, City of Toronto | $18.56 per m² of new floor area (about $690 for 400 sq ft) | Always; included in the line above |
| Minor variance (Committee of Adjustment) | $5,000 and more | Only when the addition does not fit the zoning by-law |
| Foundation repairs | $25,000 to $60,000 | Only if the engineer finds the existing foundation needs work, mostly for a second storey |
| Temporary housing | $3,000 to $12,000 and more | Usually only for a second storey, while the roof is off |
| Contingency | 15% of the budget | Always; older houses hide surprises once walls open |
| HST | 13% | Always |
Enlarging your own house generally does not trigger development charges. Adding a new rental unit is treated differently; the multiplex cost guide covers that case.
A standard 400 sq ft rear addition comes to about $213,000 to $264,000 all in; a standard 1,000 sq ft second storey with a minor variance to about $516,000 to $637,000.
How to read this table: The estimate adds construction, the survey, design, engineering and permits, and any variance or temporary housing; the next columns add a 15% contingency and then 13% HST.
| Budget example | Estimate | With 15% contingency | With HST (13%) |
|---|---|---|---|
| 400 sq ft rear family room, standard finish | $164,000 to $203,500 | $189,000 to $234,000 | $213,000 to $264,000 |
| 1,000 sq ft second storey on a bungalow, standard finish, with a minor variance and temporary housing | $397,000 to $490,500 | $457,000 to $564,000 | $516,000 to $637,000 |
Per square foot, the two fall in the same range. The difference is in what each one needs, and the lot often decides for you.
Adding most of a house? Compare it with a knockdown rebuild first: see is it cheaper to renovate or rebuild? and the custom home cost guide.
Send us your address and what you want to add: a rear family room, a second storey, a main-floor bedroom. We check the zoning before we visit and tell you which approvals to expect.
Toronto’s zoning by-law limits floor area, height, the number of storeys, building depth and setbacks. An addition that fits goes straight to a building permit; many do not.
Many older Toronto houses already exceed today’s floor area limits, so even a modest addition often needs a minor variance from the Committee of Adjustment. Your neighbours are notified and can comment or object at the hearing, so showing them the drawings early avoids surprises. A variance adds months to the schedule and about $5,000 or more to the budget.
Other approvals can apply too: a tree permit near a protected tree, and heritage review on a listed or designated property. Our guide to heritage restrictions in Toronto explains when that happens.
Every addition needs a building permit with stamped structural drawings and energy calculations. The City’s review takes about 4 to 16 weeks, and a minor variance adds months before that.
Our post on how long a building permit takes in Toronto breaks the review stages down.
Size, structure and approvals move the price more than finishes do.
| Factor | Toward the low end | Toward the high end |
|---|---|---|
| Size | A larger addition spreads fixed costs | A small bump-out still needs a foundation, roof and permit |
| Structure | Foundation and walls carry a second storey as they are | Footings or walls need reinforcing; new beams to open into the house |
| Approvals | Fits the zoning by-law | Minor variance, tree permit or heritage review |
| Heating and cooling | The existing furnace handles the extra space | New equipment and ductwork sized for the larger house |
| The existing house | Updated wiring and plumbing | Knob-and-tube wiring or old plumbing where the two meet |
| Site access | Driveway access to the backyard | Tight side yards; materials carried by hand |
| Finishes | Stock windows and standard sizes | Custom windows, matched brick, higher ceilings |
Opening the old exterior wall into the addition usually means removing part of a load-bearing wall; see load-bearing wall removal in Toronto for the beam, permit and cost. For a second storey, check Ontario ceiling height standards before choosing ceiling heights, since taller storeys count against the height limit.
With a rear addition, most families stay at home. With a second storey, plan to move out for at least part of the job.
The noisy foundation and framing work for a rear addition happens outside, and the house is opened only near the end, behind a temporary dust wall. Our guide to living in your house during a renovation explains what that is like day to day.
Most homeowners pay with savings, a home equity line of credit or a refinance; some lenders offer construction draws tied to project stages. See financing a home renovation in Toronto.
Sources: City of Toronto building permit fees (2026); City of Toronto Zoning By-law 569-2013 and Committee of Adjustment; Ontario Building Code (O. Reg. 163/24). Construction costs are Route Homes planning estimates for November 2026, before HST; other ranges are published Toronto ranges for 2026.
About $325 to $550 per square foot for construction in 2026, before HST: $325 to $375 at an economy finish, $375 to $450 at a standard finish and $450 to $550 at a luxury finish. Design, permits, a contingency and HST come on top.
For a 1,000 sq ft second storey on a bungalow, construction runs about $325,000 to $550,000 before HST. With design, permits, a minor variance, temporary housing, a 15% contingency and HST, a standard-finish second storey comes to about $516,000 to $637,000.
A 400 sq ft one-storey rear addition costs about $130,000 to $220,000 to build, before HST. A standard-finish one comes to about $213,000 to $264,000 all in, with design, permits, a 15% contingency and HST.
Yes. Every addition needs a building permit with stamped structural drawings. If it does not fit the zoning by-law, it also needs a minor variance from the Committee of Adjustment first.
The building permit review takes about 4 to 16 weeks. A minor variance, when one is needed, adds months before the permit can be issued.
Usually yes for a rear addition, since most of the work happens outside until the end. For a second storey, the roof comes off, so most families move out for part of the job.
The ranges on this page are approximate. Your free estimate starts with a zoning and structure check, and covers design, permits and construction by one team. See our home additions in Toronto service.