Basements, kitchens, bathrooms, additions and additional units in King City and across the Township of King, planned around the Township’s permit, septic and Oak Ridges Moraine rules. Licensed to work in King.
Inside the King City village boundary, Zoning By-law 2017-66 applies. The countryside and hamlets around it use By-law 2022-053, passed in September 2022.
Land in the Oak Ridges Moraine Conservation Plan area has its own by-law, 2005-23.
The by-law decides what you can add: a second unit, a detached building, a bigger footprint. On moraine land the limits are much tighter.
We confirm the zone through the Township’s Ask King Zoning service before any drawing.
King needs a building permit for more than many owners expect, including finishing a basement for your own use. Applications go through the Township’s CityView portal. Route Homes is licensed to work in King and handles the application for you.
A permit is needed for:
No permit is needed to paint, replace cabinets, fixtures, a water heater or shingles, or to swap a furnace for one with the same fuel and output.
Send the address and what you want to change. We will check the zoning by-law, the moraine and the septic system before we price anything.
Where a King house is on a private septic system, the Township asks for an evaluation of it with the permit. Adding plumbing fixtures, a bathroom or a bedroom can mean an upgrade or a new system.
The septic drawings and calculations come from a designer, with a site plan showing the tank, the leaching bed and the well.
We look at the septic question first, because it can change the budget more than the finishes.
It depends on the zone and the servicing. On a lot with municipal water and sewer, Ontario’s Planning Act allows up to three units. The countryside by-law sets these limits:
Up to two additional units where a detached house is allowed, outside the moraine zones.
One additional unit, and only inside the house.
No additional units.
At most half the house’s floor area or 85 m², whichever is less, and one per lot.
One extra space per unit on top of the house’s; tandem parking is allowed.
New and existing units are built and checked to the Building Code under a permit.
King Township has no tree by-law for private trees, so a single tree in your yard can usually come down without a Township permit.
The two exceptions:
King City drains to the Humber River. Near its valleys and tributaries, TRCA may need to issue a permit before an addition or a new structure goes ahead.
Most King projects start with the basement, the kitchen or more room for the family, and each one starts with the zoning and septic checks above.
Basements finished for your own use, with the permit King requires even when no unit is added.
New layouts, cabinetry and counters, with plumbing changes permitted and checked against the septic system where there is one.
A new bathroom on a septic lot starts with an evaluation; a rebuilt one with waterproofing under the tile.
Rear and upper additions, with zoning, septic and moraine checks before the drawings.
A unit inside the house or in a detached building, where the zone allows one.
The whole house planned as one project, on one schedule.
We walk the house and find out whether it is on septic or sewer, and whether it sits on moraine land.
Which of the three zoning by-laws applies, and what it allows on your lot.
On a septic lot, a designer’s evaluation before bedrooms, bathrooms or fixtures are added.
Permit drawings and the application through CityView, plus TRCA or York Region approval where the property needs it.
Work scheduled around the Township’s inspections, with regular updates from your project manager.
We walk the finished work with you, close every deficiency and hand over the warranty.
Yes. The Township needs a building permit to finish a basement, even for your own use and with no second unit, and to add exterior stairs down to it.
Inside the village boundary, By-law 2017-66. The countryside uses By-law 2022-053 and Oak Ridges Moraine land By-law 2005-23. The Township’s Ask King Zoning service confirms it for an address.
Usually, but not without checking the system. King asks for a septic evaluation when bedrooms, bathrooms or fixtures are added, and the system may need an upgrade.
Not from the Township for a single private tree. Trees in a woodlot or woodland need a York Region permit, and a boundary tree needs your neighbour’s consent.
In the Oak Ridges Moraine Countryside zone, one unit inside the house. In the Natural Core, Linkage and Feature Protection zones, none.
Yes if it is over 10 m² or more than 600 mm above grade.
Online through the Township’s CityView portal. We prepare the drawings, submit the application and answer the Township’s comments.
Yes. Route Homes holds the licences each municipality it works in requires, including King Township, and is an HCRA-licensed builder.
We visit, go through the zoning, septic and moraine questions with you, and follow up with a written quote and a schedule.