Whole interiors, kitchens, washrooms and registered basement units in Newmarket houses, planned around the Town’s tree, heritage and LSRCA rules. Our 4,300 sq ft Andrews Street renovation was finished in two and a half months.
On Andrews Street we renovated a 4,300 sq ft house for owners preparing to move in: new flooring throughout, the whole interior painted, a redesigned kitchen, upgraded washrooms and custom wall panels.
The work was completed in two and a half months, ready for the move.
Most Newmarket projects combine a few of these.
Redesigned layouts, new cabinetry and counters, with plumbing and wiring handled by licensed trades.
Ensuites and powder rooms rebuilt and waterproofed, like the washrooms on Andrews Street.
Finished basements and additional units built to code and ready for the Town’s registration.
New flooring and paint through the whole house, scheduled so rooms are finished in order.
Custom wall panels, fireplace surrounds and built-in shelving.
Every floor renovated as one project, on one schedule.
The weeks between closing and moving day are the easiest time to renovate: no furniture to protect, no family to work around, and floors, paint and the kitchen can go in across the whole house at once.
It works when the decisions are made before closing: layouts, cabinets and tile chosen, and anything that needs a permit, such as a moved wall or a new washroom, applied for early, so the work can start when the keys arrive.
Since 2013, every additional residential unit in Newmarket must be registered with the Town. A unit needs its own entrance, kitchen, living and sleeping space and bathroom; a rented room with a shared kitchen is not one.
Registration involves:
Each unit needs one parking space on top of the two for the house, outside, between the garage and the curb and within the permitted driveway width. The Town’s guide allows up to three units on a serviced lot.
How a basement unit is built to the Building Code is on our legal basement suite page.
Send the address, the closing date and the rooms you want renovated. We will tell you what fits before you move in and what needs a permit.
Removing a private tree 20 cm or more across, measured 1.4 m above the ground, needs a Town permit, an arborist report, fees and replacement trees.
The permit is valid for one year, moves with the house if it is sold in that time, and a refusal can be appealed within 14 days.
Newmarket is in the Lake Simcoe Region Conservation Authority’s area. Near a river, stream, wetland or steep slope, an addition, a new structure or an extra unit may need an LSRCA permit.
The Town’s property map shows whether a lot is regulated.
Newmarket has one heritage conservation district, Lower Main Street South. Exterior changes there need a heritage permit, reviewed by the district’s advisory group.
A permit is needed for:
We start with the Town’s Cultural Heritage Planner, since a pre-consultation may be required, and design to the district plan.
We walk the house, measure and note any tree, slope or watercourse near the work.
What the Town’s zoning allows on the lot, including parking for an added unit.
Drawings by a qualified designer for anything structural, a new washroom or a unit.
The building permit, and tree, heritage or LSRCA approval where the lot needs them.
Work scheduled around the Town’s inspections, room by room or all at once.
For a new unit, the documents for registration; then a walkthrough and the warranty.
Yes. Since 2013 every additional residential unit must be registered with the Town, for a one-time fee of $268.93, after the final inspection or with Fire and ESA documents.
The Town’s guide allows up to three on a lot with municipal water and sewer: the house and two units, or one inside and one detached.
One exterior space per unit, in addition to the two for the house, between the garage and the curb and within the permitted driveway width.
For a private tree 20 cm or more across, yes, with an arborist report. Dead, hazardous and emergency trees have no fee or replacement.
Exterior work: additions, facades, masonry, windows and doors, and the roofline. We speak with the Town’s heritage planner before design.
Only if the lot is in its regulated area, near a river, stream, wetland or steep slope, and the work adds or changes a structure or units.
Comprehensive Zoning By-law 2010-40, adopted in June 2010 and amended since.
Our 4,300 sq ft Andrews Street project took two and a half months. Every house differs, so you get a schedule with the quote.
We walk the house with you, go through what you want and the budget, and follow up with a written quote and a schedule.