A bathroom is the room where hidden mistakes cost the most. Leaks behind the tile, poor venting and badly sloped showers show up months later. We renovate bathrooms, ensuites and powder rooms across Toronto and the GTA, with the waterproofing, plumbing and ventilation done properly first.
Most bathroom problems are not about tile choice. They come from what is underneath: no proper waterproofing behind the shower, a fan that does not really vent, drains without enough slope, or a subfloor that flexes and cracks the tile. We build from the studs and subfloor up, so the finishes last.
From a powder room refresh to a spa-style ensuite with a walk-in shower and heated floors, the same standards apply.
Most projects include some of these.
New tub or shower, vanity, toilet, tile and lighting, with the plumbing and waterproofing brought up to standard.
Larger showers, double vanities, freestanding tubs and storage for the bathroom you use every morning.
Walk-in showers with linear drains and proper floor slope, including tub-to-shower conversions.
Small rooms with a big impact: compact vanities, wall-hung fixtures and good lighting.
New bathrooms below grade, with the drain connections, venting and, where needed, a pump for fixtures below the sewer line.
Bathrooms in condo units, working with fixed stacks and your building’s approval process.
Waterproofing: showers and tub surrounds get a continuous waterproof membrane under the tile, with sealed corners, niches and pipe penetrations. Tile and grout are not waterproof on their own, so what goes behind them decides whether the bathroom stays dry.
Ventilation and plumbing: the exhaust fan is sized for the room and vented to the outside, not into the attic. Drains need the right slope, and a curbless shower needs the floor recessed or built up so water runs to the drain, not into the hallway. Adding a bathroom or moving a toilet or shower usually needs a building permit.
In the shower:
Glass is measured after the tile is finished, so its layout is decided early and made last.
At the vanity and around the room: an outlet inside a vanity drawer for hair tools, lighting on both sides of the mirror as well as overhead, a night light, an anti-fog mirror, and circuits for a heated floor or towel warmer.
All of these need wiring or blocking before the walls close, which is why we settle them at the design stage.
Old tile is often set in a thick mortar bed over the wood floor. It is heavy and slow to remove, and underneath it the subfloor and joists around the toilet and tub are frequently soft from years of small leaks. Earlier plumbing jobs sometimes notched the joists. We repair or sister them before anything new goes down.
Cast-iron drain stacks and galvanized water lines are usually near the end of their life. When the wall is already open, replacing what we expose costs far less than opening the same wall again in a few years.
Many older bathrooms have no exhaust fan, or one that vents into the attic. The new fan is ducted outside, and the duct is insulated where it runs through cold space so condensation does not drip back into the ceiling.
Wiring near water gets attention too. Bathroom receptacles need GFCI protection, and older circuits often cannot carry a heated floor or towel warmer, so the electrical is planned with the layout.
Recent work includes a luxury bathroom at the Tiffany residence with a new layout, high-end tile, a custom vanity and storage, premium fixtures and refined lighting, and a bathroom renovation in a one-bedroom condo at 18 Holmes Ave. In our custom homes, such as the Norton residence, we build spa-like primary ensuites with the same care for what goes behind the tile.
Its size, whether it is the only bathroom in the house, and what bothers you about it now. We will tell you what the change is likely to involve (drains, venting, permits) before we book a site visit.
An accessible bathroom is planned around how the person moves, not around a list of products. The core of it:
Grab bars need solid blocking inside the wall to hold a person’s weight. Blocking costs very little while the walls are open, so put it in wherever a bar might be needed later, beside the toilet, in the shower and by the tub, even if the bars go up years from now.
For a walker or wheelchair, space decides everything: a wider doorway (a pocket door or a door that swings out helps), enough clear floor to turn around, and a shower entry with no step. Anti-scald valves, which Ontario already requires in showers, and bright, even lighting reduce the most common risks for older users.
The federal Home Accessibility Tax Credit can cover part of the eligible cost for a person 65 or older, or someone eligible for the disability tax credit. Check the current rules with the Canada Revenue Agency before you count on it.
Porcelain tile is the practical choice for floors and showers: dense, low-maintenance and available in large formats. Natural stone looks beautiful but needs sealing and gentler cleaners. Large tiles need a very flat floor and walls, which is part of the prep work, and a stain-resistant grout in the shower saves years of scrubbing.
Shower valves in Ontario have to protect against scalding, so we install pressure-balancing or thermostatic valves. Choose fixtures from brands with replaceable cartridges and parts you can still buy in ten years, and a vanity top (quartz or porcelain slab) that will not stain from everyday products.
We look at the room, the plumbing, the subfloor and the ventilation, and talk through what you want.
Layout options, cabinet design and finish selections, with a budget attached to each choice.
A building permit when drains or fixtures move or a bathroom is added, and an ESA permit for electrical work.
Down to the studs and subfloor, then plumbing, venting and electrical roughed in and inspected.
The membrane goes on and is checked, then tile, glass, vanity and fixtures.
Every fixture, drain and fan checked with you, deficiencies closed and the warranty in writing.
What drives the cost:
Our bathroom renovation cost guide has current ranges.
On site, most bathroom renovations take a few weeks, in this order: demolition, repairs to the floor and framing, plumbing and electrical rough-in and inspection, waterproofing, tile, then vanity, fixtures and glass. Custom vanities, glass and special-order tile have lead times, so selections are made before demolition.
If it is your only bathroom, plan for it. We will talk through the timing so you are without it for as short a time as possible.
A full bathroom renovation is mostly work you will never see once it is finished. A complete scope usually includes:
If a quote does not mention waterproofing, venting to the outside or subfloor repair, ask why. Those are the parts that decide whether the bathroom lasts.
Replacing a tub with a walk-in shower is one of the most common bathroom changes we make. A few things decide how it is done:
Moving the drain to a new spot usually means a plumbing permit, which we take care of as part of the job.
A second bathroom, or a powder room on the main floor, is one of the renovations families value most. The question is always the drains:
New plumbing fixtures need a permit in Toronto. If you are finishing the whole lower level, see our basement renovation page.
Two bathrooms can look the same on the day they are finished and be very different five years later. Before you sign, ask:
As a bathroom renovation contractor in Toronto, we build from the subfloor up and show you what goes behind the tile, not just the tile itself. For current price ranges, see our bathroom renovation cost guide.
Where we work: across Toronto and the GTA, including North York, Vaughan, Richmond Hill, Markham, Newmarket and King City.
Not for replacing fixtures, tile and a vanity in the same spots. You need a building permit to add a bathroom or move a toilet, shower or drains, and electrical work needs an ESA permit. We confirm it at the site visit.
It depends on size, finishes and whether plumbing moves. After a site visit you get a written quote.
A few weeks on site for most bathrooms. Custom vanities, glass and some tiles take longer to arrive, so we finalize selections before demolition.
Yes. The drain usually moves, the floor needs the right slope and the waterproofing has to cover the whole shower area. Done properly, it makes a small bathroom feel much larger.
They make a tiled bathroom far more comfortable in a Toronto winter. Electric in-floor heating needs a dedicated circuit and a thermostat and goes under the tile, so it has to be decided before tiling.
Yes. Condo bathrooms work around fixed stacks and building rules, and most buildings need approval before work starts. See condo renovations.
Usually. Moving a toilet or shower means moving the drain, and how far it can go depends on the joist direction and where the stack is. In older houses we check the joists first. A new layout needs a building permit.
Yes, often more than a large one. Wall-hung toilets and vanities, a curbless shower in place of a tub, a pocket door and a recessed niche can make a narrow bathroom in a Toronto semi feel much bigger.
Yes, and it usually saves time and cost because the plumbing and inspections are shared. If other rooms are involved too, see full home renovations.
Yes. Plumbing and electrical work is done by licensed trades, we carry $5M liability insurance and WSIB coverage, and your bathroom is covered by our 2-year workmanship warranty.
At the site visit we check the subfloor, the drains, the venting and the wiring, then talk through the layout, the fixtures and a budget before you choose a single tile.