Bathroom renovation Toronto

A bathroom is the room where hidden mistakes cost the most. Leaks behind the tile, poor venting and badly sloped showers show up months later. We renovate bathrooms, ensuites and powder rooms across Toronto and the GTA, with the waterproofing, plumbing and ventilation done properly first.

$5M Liability Insurance
WSIB Coverage
Licensed Trades
Permit Coordination
2-Year Workmanship Warranty
Bathroom renovations

Bathroom renovation built from the subfloor up

Most bathroom problems are not about tile choice. They come from what is underneath: no proper waterproofing behind the shower, a fan that does not really vent, drains without enough slope, or a subfloor that flexes and cracks the tile. We build from the studs and subfloor up, so the finishes last.

From a powder room refresh to a spa-style ensuite with a walk-in shower and heated floors, the same standards apply.

Bathroom work we do

Main bathroom, ensuite and powder room renovations

Most projects include some of these.

01

Main Bathroom Renovations

New tub or shower, vanity, toilet, tile and lighting, with the plumbing and waterproofing brought up to standard.

02

Ensuite Renovations

Larger showers, double vanities, freestanding tubs and storage for the bathroom you use every morning.

03

Walk-In and Curbless Showers

Walk-in showers with linear drains and proper floor slope, including tub-to-shower conversions.

04

Powder Rooms

Small rooms with a big impact: compact vanities, wall-hung fixtures and good lighting.

05

Basement Bathrooms

New bathrooms below grade, with the drain connections, venting and, where needed, a pump for fixtures below the sewer line.

06

Bathrooms in Condo Units

Bathrooms in condo units, working with fixed stacks and your building’s approval process.

Under the tile

Waterproofing, venting and drains done right

Waterproofing: showers and tub surrounds get a continuous waterproof membrane under the tile, with sealed corners, niches and pipe penetrations. Tile and grout are not waterproof on their own, so what goes behind them decides whether the bathroom stays dry.

Ventilation and plumbing: the exhaust fan is sized for the room and vented to the outside, not into the attic. Drains need the right slope, and a curbless shower needs the floor recessed or built up so water runs to the drain, not into the hallway. Adding a bathroom or moving a toilet or shower usually needs a building permit.

01
Waterproof membrane
02
Fan vented outside
03
Drain slope and venting
04
Solid subfloor
05
Protected electrical
Planning the details

Shower and vanity details to decide before tiling

In the shower:

  • a niche on a wall the spray does not hit directly
  • a bench, if you want one
  • a fixed head plus a handheld on a diverter
  • a linear drain if the floor is curbless

Glass is measured after the tile is finished, so its layout is decided early and made last.

At the vanity and around the room: an outlet inside a vanity drawer for hair tools, lighting on both sides of the mirror as well as overhead, a night light, an anti-fog mirror, and circuits for a heated floor or towel warmer.

All of these need wiring or blocking before the walls close, which is why we settle them at the design stage.

Older homes

What we find inside older Toronto bathrooms

Old tile is often set in a thick mortar bed over the wood floor. It is heavy and slow to remove, and underneath it the subfloor and joists around the toilet and tub are frequently soft from years of small leaks. Earlier plumbing jobs sometimes notched the joists. We repair or sister them before anything new goes down.

Cast-iron drain stacks and galvanized water lines are usually near the end of their life. When the wall is already open, replacing what we expose costs far less than opening the same wall again in a few years.

Many older bathrooms have no exhaust fan, or one that vents into the attic. The new fan is ducted outside, and the duct is insulated where it runs through cold space so condensation does not drip back into the ceiling.

Wiring near water gets attention too. Bathroom receptacles need GFCI protection, and older circuits often cannot carry a heated floor or towel warmer, so the electrical is planned with the layout.

Recent bathrooms

Recent bathroom and ensuite work

Recent work includes a luxury bathroom at the Tiffany residence with a new layout, high-end tile, a custom vanity and storage, premium fixtures and refined lighting, and a bathroom renovation in a one-bedroom condo at 18 Holmes Ave. In our custom homes, such as the Norton residence, we build spa-like primary ensuites with the same care for what goes behind the tile.

Planning a bathroom?

Tell us about the bathroom you want to change

Its size, whether it is the only bathroom in the house, and what bothers you about it now. We will tell you what the change is likely to involve (drains, venting, permits) before we book a site visit.

Aging in place

Accessible bathroom renovation for seniors and aging in place

An accessible bathroom is planned around how the person moves, not around a list of products. The core of it:

  • a curbless or low-threshold shower with a built-in or fold-down bench
  • a handheld shower on a slide bar
  • a comfort-height toilet and lever handles
  • slip-resistant floor tile
  • a vanity with knee space underneath, if a wheelchair is used

Grab bars need solid blocking inside the wall to hold a person’s weight. Blocking costs very little while the walls are open, so put it in wherever a bar might be needed later, beside the toilet, in the shower and by the tub, even if the bars go up years from now.

For a walker or wheelchair, space decides everything: a wider doorway (a pocket door or a door that swings out helps), enough clear floor to turn around, and a shower entry with no step. Anti-scald valves, which Ontario already requires in showers, and bright, even lighting reduce the most common risks for older users.

The federal Home Accessibility Tax Credit can cover part of the eligible cost for a person 65 or older, or someone eligible for the disability tax credit. Check the current rules with the Canada Revenue Agency before you count on it.

Materials that last

Tile, anti-scald valves and fixtures that last

Porcelain tile is the practical choice for floors and showers: dense, low-maintenance and available in large formats. Natural stone looks beautiful but needs sealing and gentler cleaners. Large tiles need a very flat floor and walls, which is part of the prep work, and a stain-resistant grout in the shower saves years of scrubbing.

Shower valves in Ontario have to protect against scalding, so we install pressure-balancing or thermostatic valves. Choose fixtures from brands with replaceable cartridges and parts you can still buy in ten years, and a vanity top (quartz or porcelain slab) that will not stain from everyday products.

01
Porcelain or natural stone
02
Flat substrate for large tile
03
Stain-resistant grout
04
Anti-scald shower valves
05
Serviceable fixtures
The sequence

The bathroom renovation sequence, and why the order matters

01

Bathroom Assessment

We look at the room, the plumbing, the subfloor and the ventilation, and talk through what you want.

02

Layout, Fixtures and Tile Selections

Layout options, cabinet design and finish selections, with a budget attached to each choice.

03

Drain and Fixture Permits

A building permit when drains or fixtures move or a bathroom is added, and an ESA permit for electrical work.

04

Strip to Studs and Rough-In

Down to the studs and subfloor, then plumbing, venting and electrical roughed in and inspected.

05

Membrane, Tile and Glass

The membrane goes on and is checked, then tile, glass, vanity and fixtures.

06

Fixture Check and Warranty

Every fixture, drain and fan checked with you, deficiencies closed and the warranty in writing.

Budget and timing

Bathroom renovation budget and timing

What drives the cost:

  • the size of the room
  • whether the toilet, shower or tub moves (new drains, usually a permit)
  • tile, glass and the vanity
  • heated floors and other extras

Our bathroom renovation cost guide has current ranges.

On site, most bathroom renovations take a few weeks, in this order: demolition, repairs to the floor and framing, plumbing and electrical rough-in and inspection, waterproofing, tile, then vanity, fixtures and glass. Custom vanities, glass and special-order tile have lead times, so selections are made before demolition.

If it is your only bathroom, plan for it. We will talk through the timing so you are without it for as short a time as possible.

Full scope

What a full bathroom renovation includes, step by step

A full bathroom renovation is mostly work you will never see once it is finished. A complete scope usually includes:

  • Demolition: tile, fixtures, vanity and often the old mortar bed, down to the studs and subfloor.
  • Structural repairs: soft subfloor replaced, damaged or notched joists sistered, and the floor made stiff and flat enough for tile.
  • Plumbing rough-in: new supply lines, a pressure-balancing or thermostatic shower valve, drains with proper slope and venting.
  • Electrical: GFCI-protected outlets, lighting, an exhaust fan on its own switch or timer, and heated floor wiring if you want it.
  • Ventilation: a fan sized to the room and ducted to the outside, not into the attic or a soffit.
  • Waterproofing: a continuous membrane in the shower and around the tub, with sealed corners, niches and pipe penetrations, tested before tile.
  • Tile, vanity and fixtures: floor and wall tile, the vanity and counter, toilet, tub or shower base, then glass measured after tiling.
  • Finishing: accessories, mirrors, paint, caulking and a final check of every drain and seal.

If a quote does not mention waterproofing, venting to the outside or subfloor repair, ask why. Those are the parts that decide whether the bathroom lasts.

Showers

Tub-to-shower conversions and curbless showers in Toronto homes

Replacing a tub with a walk-in shower is one of the most common bathroom changes we make. A few things decide how it is done:

  • Curb or curbless: a curbless shower needs the floor recessed so water runs to the drain and stays in the shower. In a wood-framed house that depends on the joists, which we check before promising a flush floor.
  • The drain: a linear drain lets the floor slope one way, which suits large tiles and curbless entries; a centre drain needs a four-way slope and smaller tiles.
  • Glass: a fixed panel is simpler and easier to clean than a full enclosure, but needs enough shower length to keep the spray in.
  • Keep one tub? If young children live in the house now, or may later, keeping a tub in one bathroom often matters to future buyers.

Moving the drain to a new spot usually means a plumbing permit, which we take care of as part of the job.

More bathrooms

Adding a basement bathroom or a main-floor powder room

A second bathroom, or a powder room on the main floor, is one of the renovations families value most. The question is always the drains:

  • Basement bathrooms: if the new fixtures sit below the main drain, a sewage ejector pump lifts the waste up to it. If they sit above it, the floor is cut and new drains are run under the slab to the existing stack.
  • Venting: every new fixture needs a vent to the plumbing stack or through the roof, which affects where the bathroom can go.
  • Backwater valve: in basements, we recommend one to protect against sewer backups, and the City of Toronto subsidy may cover part of the cost.
  • Powder rooms: a main-floor powder room is often fitted under the stairs or beside the entry closet, as long as a drain and vent can reach it.

New plumbing fixtures need a permit in Toronto. If you are finishing the whole lower level, see our basement renovation page.

Choosing a contractor

How to choose a bathroom renovation contractor in Toronto

Two bathrooms can look the same on the day they are finished and be very different five years later. Before you sign, ask:

  • Who pulls the permits? The contractor should apply for and close the building permit, and book the inspections, not leave it to you.
  • Is the quote itemized? A single lump sum hides what is included. Ask for a written, line-by-line price and a clear list of allowances.
  • Insurance and WSIB: ask for a certificate of liability insurance and WSIB coverage before work starts. We carry $5M liability insurance and WSIB coverage.
  • Licensed trades: electrical work should be done by a licensed electrical contractor with an ESA notification, and gas work by a TSSA-registered gas technician.
  • Warranty in writing: what is covered and for how long. Our workmanship warranty is 2 years.
  • Payment schedule: payments tied to finished stages of work, not large sums up front.
  • Which waterproofing system? Ask what membrane goes behind the shower tile and whether it is tested before tiling.

As a bathroom renovation contractor in Toronto, we build from the subfloor up and show you what goes behind the tile, not just the tile itself. For current price ranges, see our bathroom renovation cost guide.

Where we work: across Toronto and the GTA, including North York, Vaughan, Richmond Hill, Markham, Newmarket and King City.

Frequently asked questions

Permits, cost and layout: bathroom questions

Not for replacing fixtures, tile and a vanity in the same spots. You need a building permit to add a bathroom or move a toilet, shower or drains, and electrical work needs an ESA permit. We confirm it at the site visit.

It depends on size, finishes and whether plumbing moves. After a site visit you get a written quote.

A few weeks on site for most bathrooms. Custom vanities, glass and some tiles take longer to arrive, so we finalize selections before demolition.

Yes. The drain usually moves, the floor needs the right slope and the waterproofing has to cover the whole shower area. Done properly, it makes a small bathroom feel much larger.

They make a tiled bathroom far more comfortable in a Toronto winter. Electric in-floor heating needs a dedicated circuit and a thermostat and goes under the tile, so it has to be decided before tiling.

Yes. Condo bathrooms work around fixed stacks and building rules, and most buildings need approval before work starts. See condo renovations.

Usually. Moving a toilet or shower means moving the drain, and how far it can go depends on the joist direction and where the stack is. In older houses we check the joists first. A new layout needs a building permit.

Yes, often more than a large one. Wall-hung toilets and vanities, a curbless shower in place of a tub, a pocket door and a recessed niche can make a narrow bathroom in a Toronto semi feel much bigger.

Yes, and it usually saves time and cost because the plumbing and inspections are shared. If other rooms are involved too, see full home renovations.

Yes. Plumbing and electrical work is done by licensed trades, we carry $5M liability insurance and WSIB coverage, and your bathroom is covered by our 2-year workmanship warranty.

Professional credentials
Accredited excellence. Trusted craftsmanship.

Recognized credentials and professional affiliations supporting Route Homes projects across Toronto and the GTA.

Plan your bathroom

Planning a bathroom or ensuite? We look under the tile first

At the site visit we check the subfloor, the drains, the venting and the wiring, then talk through the layout, the fixtures and a budget before you choose a single tile.

Google reviews

What our clients say on Google