Quick answer: A full condo renovation in Toronto costs about $40,000 to $120,000 in 2026, before HST. A condo kitchen runs about $25,000 to $60,000 and a condo bathroom about $12,000 to $40,000. Before work starts, your condo corporation usually has to approve the plans, which takes about 2 to 6 weeks. You also need a City building permit when walls, plumbing or ductwork change, and an ESA notification for electrical work. After that, a bathroom takes about 3 to 5 weeks on site; a full unit takes longer.
Key takeaways
- The building sets the limits. What is inside your unit is usually yours to change; anything touching the common elements, shared plumbing or the structure needs the condo corporation’s approval.
- Approval comes before demolition. Most Toronto condo buildings want written plans, insurance certificates and a flooring specification before they approve a renovation. Budget 2 to 6 weeks for it.
- Plumbing stacks decide where the kitchen and bathroom go. They serve the units above and below, so they stay where they are.
- Flooring is the most common cause of delay. Many buildings require an acoustic underlay with a minimum sound rating.
- Condo work costs 10% to 20% more than the same bathroom in a house, because of work hours, elevator bookings and approvals.

What you can and can’t change in a Toronto condo
A condo renovation is as much about the building as the unit. The line usually falls like this:
- Usually yours to change: cabinets, counters, tile, fixtures, paint, lighting and flooring laid over the underlay your building approves.
- Changeable with approval: drywall partitions between rooms, moving fixtures a short distance along the existing drains, and electrical changes inside the unit.
- Usually stays: concrete walls, shear walls, walls carrying shared pipes or ducts, the plumbing stacks, and the concrete ceiling slab.
Walls: drywall partitions can often come out with approval, but concrete and shear walls stay. Our guide Can I remove walls in a condo? explains how to tell the difference.
Ceilings: condo ceilings are concrete slabs, often post-tensioned with steel cables inside, so cutting into them for pot lights is usually not allowed. Recessed lights go into a new bulkhead or dropped ceiling where they matter most; track or surface-mounted fixtures do the rest.
Plumbing: the drains and supply lines run in vertical stacks shared with the units above and below. A kitchen or bathroom can move a little along its existing stack, but moving it across the unit is rarely possible.
Condo board approval and the alteration agreement
Most Toronto condo buildings require notice or written approval before you renovate. Read your corporation’s declaration, by-laws and rules before the design is final, because they set what needs approval. Changes that affect the common elements need the board’s approval and can need a formal agreement with the corporation under section 98 of Ontario’s Condominium Act, 1998.
A typical approval package includes:
- The work: a written description of the renovation and a layout or drawings showing what changes.
- Flooring: the flooring and underlay specification with its acoustic rating.
- The people: the contractor’s certificate of insurance and WSIB clearance, and the trades who will be on site.
- The schedule: start date, work hours and the elevator bookings you need.
- Sometimes: a damage deposit and an alteration or indemnity agreement.
Approval takes about 2 to 6 weeks in most buildings, longer if an alteration agreement is needed. Submit the package as soon as the design and selections are settled, not the week before demolition.
Building rules: work hours, elevators, deposits and insurance
Every condo building has its own rules, but most Toronto buildings set:
- Work hours: noisy work only on weekdays within set hours, often with quiet periods.
- Elevator bookings: materials in and debris out only in a booked service elevator, with the cab padded.
- Protection of common areas: hallway floor protection and daily cleanup.
- Insurance: the contractor’s liability insurance certificate and WSIB clearance on file with management.
- Deposits: some buildings hold a damage or elevator deposit until the work is inspected.
These rules are why the same bathroom costs 10% to 20% more in a condo than in a house: trades work shorter days, and every load goes through a booked elevator.
Flooring: underlay and sound ratings
Sound travels easily through concrete to the unit below, so flooring is the most common reason a condo renovation gets delayed.
- Sound ratings: many buildings require an acoustic underlay that meets a minimum impact sound rating (often written as IIC) and airborne sound rating (STC). Check the number in your rules before choosing a floor.
- The floor itself: engineered wood and luxury vinyl plank are the usual choices, floating or glued over the approved underlay. Solid hardwood nailed down is rarely possible on concrete.
- The subfloor: the concrete is levelled first, so long runs of plank lie flat without transitions.
Do you need a City permit for a condo renovation?
The condo board’s approval and a City building permit are separate. Toronto Building requires a permit when you add, remove or alter walls, or install or change plumbing, heating or ventilation. Painting, new flooring and replacing cabinets in place usually do not need one.
The City’s 2026 fee for interior alterations is $11.53 per m², with a $214.79 minimum, so most condo kitchens and bathrooms pay the minimum. Drawings, and engineering when a wall comes out, cost more than the permit itself.
Electrical work is separate again. In Ontario, only an electrical contractor licensed by the Electrical Safety Authority (ESA) can do electrical work for hire, and an ESA notification is filed before the work starts; a building permit does not cover electrical work.
Our guide to renovation permits for kitchens, bathrooms and basements in Toronto covers the City side in detail.
How much does a condo renovation cost in Toronto? (2026)
| Scope | 2026 range, before HST | Good to know |
|---|---|---|
| Small condo kitchen refresh (cabinet boxes stay) | $8,000 to $14,000 | New doors, counters, backsplash and sink; the layout stays |
| Condo kitchen renovation | $25,000 to $60,000 | Shaped by the plumbing stacks; any finish tier |
| Condo bathroom renovation | $12,000 to $40,000 | 10% to 20% more than the same bathroom in a house |
| New flooring, 700 sq ft | $6,650 to $9,800 vinyl plank or laminate; $9,800 to $16,450 engineered hardwood | Installed: removal, levelling, underlay and flooring |
| Full condo unit | $40,000 to $120,000 | Kitchen, bathrooms, flooring, lighting and paint throughout |
Published Toronto ranges for 2026 and Route Homes planning estimates (kitchen refresh and flooring), before HST. Not a quote.
Worked example: a one-bedroom-plus-den with a new kitchen, one bathroom and 700 sq ft of vinyl plank comes to about $43,650 to $109,800. With a 15% contingency that is about $50,000 to $126,000, and with 13% HST about $57,000 to $143,000.
For the detail behind each line, see our kitchen renovation cost guide, bathroom renovation cost guide and home renovation cost guide.

How long does a condo renovation take?
In a condo, the approvals usually take longer than you expect, and the construction takes about what you expect.
- Design and selections: about 2 to 4 weeks for a bathroom; longer for a kitchen or a full unit with custom cabinetry.
- Board approval: about 2 to 6 weeks, longer if an alteration agreement is needed.
- Permit, if needed: applied for once the drawings are ready, alongside the board’s review. See how long a building permit takes in Toronto.
- Construction: a bathroom takes about 3 to 5 weeks on site, a refresh about a week. A kitchen or bathroom alone usually takes a few weeks; a full unit takes longer.
Long-lead items such as custom cabinets and stone counters are ordered while the board reviews the package, so the site work isn’t waiting on them.
Can you live in your condo during the renovation?
For a single bathroom in a two-bathroom unit, usually yes. For a kitchen, you can stay if you can live without one for a few weeks. For a full unit, most owners move out: in a small space there is nowhere for the dust, the materials or the family to go. Our guide to living at home during a renovation covers what that’s like day to day.
Common condo renovation mistakes
- Ordering flooring before checking the underlay rule. A floor that fails the building’s sound rating may have to come up.
- Booking trades before approval. Approval dates move; build the 2 to 6 weeks into the schedule.
- Planning pot lights in the slab. Most condo slabs can’t be cut; plan bulkheads instead.
- Moving the kitchen away from the stack. Check where the drains run before the layout is drawn.
- Forgetting your own insurance. Tell your unit-owner insurer about the renovation and update the coverage for the new finishes.
Frequently asked questions
How much does a condo renovation cost in Toronto?
About $40,000 to $120,000 for a full unit in 2026, before HST. A condo kitchen runs about $25,000 to $60,000 and a condo bathroom about $12,000 to $40,000.
Do I need condo board approval to renovate?
Usually yes. Most Toronto condo buildings require notice or written approval before you renovate, and changes that affect the common elements can need a formal agreement with the corporation under Ontario’s Condominium Act. Check your declaration, by-laws and rules first.
How long does condo board approval take?
About 2 to 6 weeks in most buildings, longer if an alteration agreement is needed.
Do I need a City permit to renovate my condo?
You need a building permit when you add, remove or alter walls, or install or change plumbing, heating or ventilation. Painting, new flooring and replacing cabinets in place usually do not need one. Electrical work needs an ESA notification, filed by a licensed electrical contractor.
Can I move my condo kitchen or bathroom?
Only a short distance along the existing plumbing stack in most buildings. The stacks serve the units above and below, so they stay where they are.
Can I put pot lights in a condo ceiling?
Usually not into the concrete slab itself, which is often post-tensioned with steel cables. Pot lights go into a new bulkhead or dropped ceiling instead.
Planning a condo renovation in Toronto?
We renovate condo kitchens, bathrooms and full units across Toronto and the GTA, and prepare our part of the approval package, including our $5M liability insurance and WSIB certificates. See our condo renovation in Toronto service or book a free consultation.
Sources: Condominium Act, 1998 (Ontario), section 98; City of Toronto, Toronto Building, when you need a building permit and 2026 permit fees; Electrical Safety Authority (ESA), homeowner and general contractor guidance. Costs are published Toronto ranges and Route Homes planning estimates for 2026, before HST. Every building’s rules differ; this article is general information, not legal advice or a quote.