A bathroom renovation in Toronto costs about $6,000 to $90,000 in 2026. A main bathroom is about $12,000 to $18,000 economy, $18,000 to $32,000 standard and $32,000 to $58,000 luxury, before HST. Approximate, not a quote.
These are approximate planning ranges, not a quote. For the price of your own bathroom, book a free site visit below or call (416) 834-2444.
These ranges are a starting point. For your own bathroom, we visit, measure and look at the structure and services you have now, then send a written price, line by line, like the tables on this page.
Free, with no obligation. Prefer to talk? Call (416) 834-2444.
Route Homes is a bathroom renovation contractor in Toronto: design, permits and construction handled by one team.
Every figure is a planning range for September 2026. Your real price comes from a free estimate for your bathroom.
Low: fixtures stay in place, simpler tile and vanity within the tier. High: more tile, better fixtures, more plumbing within the tier.
Demolition, plumbing, electrical, fan, waterproofing, tile, tub or shower, glass, vanity, toilet, accessories, permit where needed and project management.
HST (13%), contingency, heated floors, new drains in a basement slab, and any wall moved to make the room bigger.
Prices published in 2026 by Toronto renovation companies, brought into one model shared with our home renovation and kitchen cost guides.
Route Homes, a Toronto design-build renovation company working since 2006, HCRA-licensed and Tarion-registered.
A powder room costs about $6,000 to $29,000, a main bathroom $12,000 to $58,000 and a primary ensuite $18,000 to $90,000, before HST.
The type sets the band; the finish tier sets where you land in it.
How to read this table: Rows are bathroom types with an example size, columns are the tiers; each figure covers the whole bathroom.
| Bathroom | Economy | Standard | Luxury |
|---|---|---|---|
| Powder room: toilet and sink, about 20 sq ft | $6,000 to $9,000 | $9,000 to $16,000 | $16,000 to $29,000 |
| Main bathroom: three or four piece, about 40 sq ft (5×8) | $12,000 to $18,000 | $18,000 to $32,000 | $32,000 to $58,000 |
| Primary ensuite: larger, often a separate tub and shower, about 80 sq ft | $18,000 to $26,000 | $26,000 to $45,000 | $45,000 to $90,000 |
How to read this table: These rows use published 2026 ranges rather than our model, because they depend on the building or on special features.
| Other bathroom types | Published 2026 range | How it compares |
|---|---|---|
| Condo bathroom | $12,000 to $40,000 | Building rules on hours, elevators and approvals add 10% to 20% against the same bathroom in a house |
| Accessible bathroom | $15,500 to $45,000 | Curbless shower, grab bars with blocking, wider door, comfort-height toilet |
| New basement bathroom without a rough-in | the bathroom plus $8,000 to $15,000 | The concrete floor is cut open for new drains |
| Tub reglazing only | $400 to $800 | A short-term fix when the tub is sound |
The low number keeps the toilet, tub and vanity where they are, with the simpler tile and fixtures of that tier. The high number adds more tile, better valves and glass, and more plumbing work.
Tub with an acrylic surround or a shower base, ceramic tile, a stock vanity, standard fixtures, the layout kept.
A tiled tub or walk-in shower with glass, porcelain tile, a semi-custom vanity, a vented fan and good lighting.
A curbless shower or freestanding tub, large-format porcelain or stone, a custom or wall-hung vanity, heated floor.
Two main bathrooms and a powder room cost about $30,000 to $145,000; three main bathrooms about $36,000 to $174,000, before HST.
How to read this table: Each row adds up the type rows above for a common combination.
| Several bathrooms at once | Economy | Standard | Luxury |
|---|---|---|---|
| Two main bathrooms and a powder room | $30,000 to $45,000 | $45,000 to $80,000 | $80,000 to $145,000 |
| A main bathroom and an ensuite | $30,000 to $44,000 | $44,000 to $77,000 | $77,000 to $148,000 |
| Three main bathrooms | $36,000 to $54,000 | $54,000 to $96,000 | $96,000 to $174,000 |
Each row is the sum of the type rows. Doing them in one project usually costs less than the sum, because the trades come once, and the house keeps one working bathroom if they are done in sequence.
A standard main bathroom works out to about $450 to $800 per sq ft, and a powder room costs more per sq ft than an ensuite. Bathrooms are priced by what goes in them, so use these figures to compare, not to price.
How to read this table: Each row divides a type’s range by an example floor area, for comparison with per-square-foot prices elsewhere.
| Bathroom | Economy | Standard | Luxury |
|---|---|---|---|
| Powder room (example 20 sq ft) | $300 to $450 per sq ft | $450 to $800 per sq ft | $800 to $1,450 per sq ft |
| Main bathroom (example 40 sq ft) | $300 to $450 per sq ft | $450 to $800 per sq ft | $800 to $1,450 per sq ft |
| Primary ensuite (example 80 sq ft) | $225 to $325 per sq ft | $325 to $560 per sq ft | $560 to $1,125 per sq ft |
A small bathroom still needs a drain, a valve, waterproofing, a fan and a toilet, so those fixed costs sit on very few square feet. That is why published per-square-foot figures for bathrooms run from $100 to $600 depending on how they are counted.
Keeping the tub and tile and replacing the vanity, toilet, faucets and lighting costs about $4,000 to $18,000 for a main bathroom. Going down to the studs costs $12,000 to $58,000.
How to read this table: The refresh rows and the full renovation row are alternatives; the add-on rows go on top of either.
| Scope | Economy | Standard | Luxury |
|---|---|---|---|
| Refresh, powder room: tub and tile kept; new vanity, toilet, faucets, lighting, paint | $2,000 to $4,000 | $4,000 to $7,000 | $7,000 to $10,000 |
| Refresh, main bathroom: tub and tile kept; new vanity, toilet, faucets, lighting, paint | $4,000 to $7,000 | $7,000 to $12,000 | $12,000 to $18,000 |
| Refresh, primary ensuite: tub and tile kept; new vanity, toilet, faucets, lighting, paint | $6,000 to $10,000 | $10,000 to $16,000 | $16,000 to $25,000 |
| Full renovation, main bathroom: down to the studs | $12,000 to $18,000 | $18,000 to $32,000 | $32,000 to $58,000 |
| Add: electric heated floor, published range | $1,500 to $3,500 | $1,500 to $3,500 | $1,500 to $3,500 |
| Add: new drains in a basement slab, published range | $8,000 to $15,000 | $8,000 to $15,000 | $8,000 to $15,000 |
A refresh is only worth it when the waterproofing behind the tile is sound. Signs of trouble: loose tile, soft grout lines, a soft floor near the tub, or stains on the ceiling below.
If you see them, a full renovation is the cheaper option in the end.
These tables are approximate planning ranges, not a quote. Book a free visit and we will send a written, itemized estimate for your bathroom. Prefer to talk? Call (416) 834-2444.
Want this priced for your home? As a Toronto bathroom renovation contractor, we give itemized quotes after a site visit.
In a standard main bathroom, waterproofing and tile take about 22% of the budget, plumbing about 14%, the tub or shower and glass about 17%, and the vanity about 10%.
How to read this table: Rows are the parts of a main bathroom renovation; each column adds up to the main bathroom row.
| Line item | What it covers | Economy | Standard | Luxury |
|---|---|---|---|---|
| Design and permit | Layout, drawings and a permit when drains move | $300 to $500 | $500 to $1,000 | $1,000 to $2,000 |
| Demolition, disposal and protection | Strip to the studs, bin, protect the hallway | $1,000 to $1,500 | $1,500 to $2,500 | $2,500 to $3,500 |
| Plumbing | Drains, supply lines, anti-scald shower valve | $1,500 to $2,500 | $2,500 to $4,500 | $4,500 to $8,000 |
| Electrical, fan and lighting | Circuits, GFCI outlets, vented fan, lights | $1,000 to $1,500 | $1,500 to $3,000 | $3,000 to $5,000 |
| Waterproofing and tile | Membrane in the shower, floor and wall tile | $2,500 to $4,000 | $4,000 to $7,000 | $7,000 to $13,000 |
| Tub or shower, and glass | Tub, shower base or tiled pan, glass door or panel | $2,000 to $3,000 | $3,000 to $5,500 | $5,500 to $10,000 |
| Vanity, counter, sink and faucet | Stock, semi-custom or custom vanity | $1,000 to $1,500 | $1,500 to $3,500 | $3,500 to $7,000 |
| Toilet | Supplied and installed | $600 to $800 | $800 to $1,200 | $1,200 to $2,000 |
| Accessories, mirror, paint and trim | Mirror or cabinet, bars, paint, door casing | $500 to $800 | $800 to $1,500 | $1,500 to $3,000 |
| Project management and site costs | Supervision, scheduling, inspections, cleaning | $1,600 to $1,900 | $1,900 to $2,300 | $2,300 to $4,500 |
| Total, main bathroom | Equals the main bathroom row | $12,000 to $18,000 | $18,000 to $32,000 | $32,000 to $58,000 |
Add the lines in any column and you get the main bathroom row. A good estimate reads the same way.
Toronto renovation companies publish installed tile at about $9 to $13 per sq ft for ceramic, $14 to $19 for porcelain and $20 and more for stone, with vanities at $700 to $4,000 and more and showers at $2,500 to $6,000.
How to read this table: The middle column is the published price; ‘compared’ shows how each option sits against the others in its group.
| Item | Published price | Compared | Good to know |
|---|---|---|---|
| Ceramic tile, installed | $9 to $13 per sq ft | lowest cost | Fine for walls and low-traffic floors |
| Porcelain tile, installed | $14 to $19 per sq ft | about 1.5× ceramic | Denser and harder; the usual choice for floors and showers |
| Natural stone or designer tile | $20 and more per sq ft | above porcelain | Each piece varies; stone needs sealing |
| Waterproofing membrane system | $500 to $1,800 | in every tier | The layer that keeps water out of the walls; cheap jobs skip it |
| Electric heated floor | $1,500 to $3,500 | add-on | Warm porcelain all year; needs its own circuit |
| Vanity | $700 to $4,000 and more | stock to custom | Wall-hung vanities need blocking in the wall |
| Shower | $2,500 to $6,000 | base and glass to fully tiled | A tiled shower needs a waterproofed pan |
| Bathtub | $2,000 to $8,000 | alcove to freestanding | A freestanding tub needs floor space and a floor-mounted filler |
| Toilet | $800 to $1,500 | standard to wall-hung | Comfort-height models are easier with age |
| Exhaust fan vented outside | $300 to $900 | in every tier | Vented outside, not into the attic |
Two bathrooms of the same type and tier can be $14,000 apart. These eight factors decide where a bathroom lands, and most of them are visible at a site visit.
How to read this table: Read each row left to right: the middle column keeps a bathroom near the bottom of its range, the right column pushes it to the top.
| Factor | Toward the low end | Toward the high end |
|---|---|---|
| Layout | Toilet, tub and vanity stay where they are | Toilet or shower drain moved, a wall moved |
| Shower | Tub with a surround, or a shower base with a door | Fully tiled, curbless, with frameless glass |
| Tile | Ceramic, standard sizes, floor and shower walls only | Large porcelain or stone, floor to ceiling, patterns |
| Fixtures | Standard faucets and valves | Thermostatic valves, rain heads, body sprays |
| Vanity | Stock vanity with a top | Custom or wall-hung, double sinks |
| Comfort | Standard floor | Heated floor, heated towel bar, niches |
| The house | Sound subfloor, copper or PEX pipes | Rotten subfloor, galvanized pipes, old wiring |
| Where it is | A house with easy access | A condo (rules, elevators, approvals) or a basement without a rough-in |
Tell us what you want to change. We will see the bathrooms, write the scope and send a free, itemized estimate, the surest way to know which tier you are in.
Replacing a vanity, toilet, tub or tile in the same place usually does not. Adding a bathroom, or moving a toilet or shower drain, does.
The City’s 2026 fee for interior alterations is $11.53 per m², so a 4 m² bathroom comes to about $46 and the $214.79 minimum applies.
Shower valves must protect against scalding (pressure-balancing or thermostatic). Electrical work is done by a licensed electrical contractor and inspected by the Electrical Safety Authority.
A standard main bathroom comes to about $23,000 to $42,000 once a 15% contingency and HST are added. The table shows how each total is built.
How to read this table: Each row starts from the tables above, adds a 15% contingency, then 13% HST.
| Budget example | Estimate | With 15% contingency | With HST (13%) |
|---|---|---|---|
| Standard main bathroom | $18,000 to $32,000 | $21,000 to $37,000 | $23,000 to $42,000 |
| Economy basement bathroom without a rough-in | $20,000 to $33,000 | $23,000 to $38,000 | $26,000 to $43,000 |
| Two main bathrooms and a powder room, standard | $45,000 to $80,000 | $52,000 to $92,000 | $58,000 to $104,000 |
| Luxury ensuite with a heated floor | $46,500 to $93,500 | $53,000 to $108,000 | $60,000 to $122,000 |
Renovating more than the bathrooms? The home renovation cost guide prices whole houses, the kitchen renovation cost guide kitchens and the basement renovation cost guide finished basements, with the same model.
A full bathroom renovation takes about 3 to 5 weeks of construction after 2 to 4 weeks of design and choices. A refresh can be done in about a week; a condo board can add 2 to 6 weeks of approval.
How to read this table: Columns are the three scopes and rows are the steps in order.
| Step | Refresh | Full renovation | New layout or condo |
|---|---|---|---|
| Design and choices | 1 to 2 weeks | 2 to 4 weeks | 2 to 4 weeks |
| Permit or condo approval | usually none | usually none | a few weeks; condo boards 2 to 6 weeks |
| Construction | 1 week | 3 to 5 weeks | 4 to 6 weeks |
With only one bathroom in the house, plan where the family will wash for those weeks, or phase the work so the toilet is back in service each evening where the layout allows.
Published figures put resale recovery for a bathroom at about 60% to 70% of the cost.
The rest is daily: no leaks into the ceiling below, a fan that clears the steam, and a shower that is easy to use with age.
For work that helps a senior or a person with a disability, the federal Home Accessibility Tax Credit can apply; more on bathroom renovations.
Moving a toilet or shower drain is the biggest single cost jump in a bathroom.
Full-height tile in the shower and porcelain on the floor; paint the other walls.
Stock widths cost far less than custom, and they are quicker to get.
The membrane is a small line item and the most expensive one to get wrong.
Frameless glass is measured once the tile is on, so plan a short wait.
10% for a refresh, 15% for a full renovation, 25% in a house built before 1960.
We do not publish project prices; the bathroom, the scope and the finishes set them.
We look at the floor, the drains, the venting route and the wiring, and measure the room.
What is removed, what stays, and every fixture and finish, written down.
Every line priced, like the line-item table above, so quotes can be compared.
Tile, vanity, fixtures and glass as allowances you can raise or lower.
Whether your plan needs a permit or condo approval, and what that adds.
Design, ordering and construction, so you can plan the weeks without that bathroom.
Call (416) 834-2444, email Sales@routehomes.ca or book online, and we will arrange the visit.
About $6,000 to $90,000. A main bathroom is $12,000 to $18,000 economy, $18,000 to $32,000 standard and $32,000 to $58,000 luxury, before HST.
A small main bathroom of about 40 sq ft is $12,000 to $58,000 depending on the tier; a powder room is $6,000 to $29,000.
About $18,000 to $26,000 economy, $26,000 to $45,000 standard and $45,000 to $90,000 luxury, before HST.
Three main bathrooms are about $36,000 to $174,000; two main bathrooms and a powder room about $30,000 to $145,000, before HST.
Published 2026 ranges put condo bathrooms at about $12,000 to $40,000, 10% to 20% more than the same work in a house.
The bathroom itself, plus about $8,000 to $15,000 to cut the concrete for drains if there is no rough-in.
Published 2026 prices: about $9 to $13 for ceramic, $14 to $19 for porcelain and $20 and more for stone.
It adds about $1,500 to $3,500 and makes porcelain warm all year. It needs its own circuit and goes in during the tile work.
Keeping the tub and tile and replacing the vanity, toilet, faucets and lighting costs about $4,000 to $18,000 for a main bathroom.
Not to replace fixtures in place. Yes to add a bathroom or move a toilet or shower drain.
About 3 to 5 weeks of construction for a full renovation, after 2 to 4 weeks of design; condo approval can add 2 to 6 weeks.
Usually the shower: waterproofing, tile and glass together. Moving drains is the biggest jump.
Published figures put resale recovery at about 60% to 70%; the rest is a bathroom that does not leak and is easy to use.
No. The figures are approximate planning ranges for September 2026. A quote needs a visit and a written scope; we do both for free.
Yes. We visit, measure, go through what you want and send a free, itemized estimate for your bathroom in writing.
The ranges on this page are approximate. Your free estimate is not: a visit, a written scope and an itemized price for your bathroom. Call (416) 834-2444 or book a free site visit.
Ready for a real number? Work with Route Homes, a bathroom renovation contractor in Toronto, from the site visit to the final inspection.