Route Homes cost guide · November 2026

Home addition cost Toronto: 2026 prices by type, size and finish

A home addition in Toronto costs about $325 to $550 per sq ft to build in 2026: $325 to $375 economy, $375 to $450 standard and $450 to $550 luxury, before HST. Approximate, not a quote.

$5M Liability Insurance
WSIB Coverage
Licensed Trades
Permit Coordination
2-Year Workmanship Warranty

Toronto addition costs at a glance

  • One-storey rear addition, 400 sq ft: $130,000 to $220,000
  • Two-storey rear addition, 600 sq ft: $195,000 to $330,000
  • Addition over a garage, 300 sq ft: $97,500 to $165,000
  • Second storey on a bungalow, 1,000 sq ft: $325,000 to $550,000
  • All in: a standard 400 sq ft rear addition comes to about $213,000 to $264,000 with design, permits, a 15% contingency and HST.
Free estimate

Get a free, itemized addition estimate

These ranges are a starting point. For your own addition, we check the zoning and the structure first, then price the work line by line.

By type and finish

Rear, second-storey and garage addition prices

A one-storey rear addition of 400 sq ft costs about $130,000 to $220,000 to build, and a 1,000 sq ft second storey about $325,000 to $550,000, before design, permits and HST.

How to read this table: Rows are addition types with an example size, columns are the finish tiers; each figure is construction only.

Route Homes planning estimates, November 2026, before HST. Not a quote. Foundation, framing, roof, windows, insulation, heating and cooling, plumbing and electrical, and interior finishes.
AdditionExample sizeEconomy ($325 to $375 per sq ft)Standard ($375 to $450 per sq ft)Luxury ($450 to $550 per sq ft)
One-storey rear addition: family room or kitchen extension400 sq ft$130,000 to $150,000$150,000 to $180,000$180,000 to $220,000
Two-storey rear addition600 sq ft (300 per floor)$195,000 to $225,000$225,000 to $270,000$270,000 to $330,000
Addition over a garage300 sq ft$97,500 to $112,500$112,500 to $135,000$135,000 to $165,000
Second storey on a bungalow1,000 sq ft$325,000 to $375,000$375,000 to $450,000$450,000 to $550,000

What the finish tiers mean

  • Economy: stock windows, laminate or vinyl plank floors and standard fixtures.
  • Standard: engineered hardwood, better windows and more lighting.
  • Luxury: custom windows and millwork, stone or solid hardwood, and higher ceilings.

Small additions cost more per square foot: a foundation, a roof tie-in and a permit cost almost the same for 150 sq ft as for 400 sq ft. The home renovation cost guide describes each finish tier in detail.

On top of construction

Design, permits and other costs on top

Design, engineering and the permit set add about $8,000 to $40,000 depending on size and finish. A minor variance, foundation repairs or temporary housing apply only to some projects.

Published Toronto ranges and City of Toronto fees, 2026, before HST.
Cost2026 rangeWhen it applies
Survey and site plan$2,000 to $3,500Almost always, to show the lot lines and setbacks
Design, drawings, structural engineering and permit set, with City fees$8,000 to $12,000 economy, $12,000 to $20,000 standard, $20,000 to $40,000 luxuryAlways
Building permit fee, City of Toronto$18.56 per m² of new floor area (about $690 for 400 sq ft)Always; included in the line above
Minor variance (Committee of Adjustment)$5,000 and moreOnly when the addition does not fit the zoning by-law
Foundation repairs$25,000 to $60,000Only if the engineer finds the existing foundation needs work, mostly for a second storey
Temporary housing$3,000 to $12,000 and moreUsually only for a second storey, while the roof is off
Contingency15% of the budgetAlways; older houses hide surprises once walls open
HST13%Always

Enlarging your own house generally does not trigger development charges. Adding a new rental unit is treated differently; the multiplex cost guide covers that case.

Worked examples

Two addition budgets, from estimate to HST

A standard 400 sq ft rear addition comes to about $213,000 to $264,000 all in; a standard 1,000 sq ft second storey with a minor variance to about $516,000 to $637,000.

How to read this table: The estimate adds construction, the survey, design, engineering and permits, and any variance or temporary housing; the next columns add a 15% contingency and then 13% HST.

Route Homes planning estimates, November 2026. Not a quote.
Budget exampleEstimateWith 15% contingencyWith HST (13%)
400 sq ft rear family room, standard finish$164,000 to $203,500$189,000 to $234,000$213,000 to $264,000
1,000 sq ft second storey on a bungalow, standard finish, with a minor variance and temporary housing$397,000 to $490,500$457,000 to $564,000$516,000 to $637,000

What each example includes

  • Rear family room: construction $150,000 to $180,000, survey $2,000 to $3,500, design, engineering and permits $12,000 to $20,000.
  • Second storey: construction $375,000 to $450,000, survey $2,000 to $3,500, design, engineering and permits $12,000 to $20,000, a minor variance of about $5,000 and temporary housing of $3,000 to $12,000.
Second storey or rear

Second storey or rear addition: which costs less?

Per square foot, the two fall in the same range. The difference is in what each one needs, and the lot often decides for you.

  • A rear addition needs its own new foundation, and the joint where the old and new roofs and walls meet is flashed and sealed to stay dry. Most families stay at home, because the work happens outside until the old back wall is opened near the end.
  • A second storey needs no new foundation, but the existing foundation and walls must carry the new load; an engineer checks this first. The roof comes off, so most families move out for part of the job, and the stairs, plumbing and ductwork are extended up.
  • Narrow lots, common in central Toronto at 20 to 30 feet wide, leave room only for a rear addition, a second storey or both. Wider lots, often 50 feet or more in the inner suburbs, can also take a side addition or a floor over the garage.

Adding most of a house? Compare it with a knockdown rebuild first: see is it cheaper to renovate or rebuild? and the custom home cost guide.

Free estimate, no guesswork

Want a number for your addition, not a range?

Send us your address and what you want to add: a rear family room, a second storey, a main-floor bedroom. We check the zoning before we visit and tell you which approvals to expect.

Approvals

Zoning, minor variances and the Committee of Adjustment

Toronto’s zoning by-law limits floor area, height, the number of storeys, building depth and setbacks. An addition that fits goes straight to a building permit; many do not.

Many older Toronto houses already exceed today’s floor area limits, so even a modest addition often needs a minor variance from the Committee of Adjustment. Your neighbours are notified and can comment or object at the hearing, so showing them the drawings early avoids surprises. A variance adds months to the schedule and about $5,000 or more to the budget.

Other approvals can apply too: a tree permit near a protected tree, and heritage review on a listed or designated property. Our guide to heritage restrictions in Toronto explains when that happens.

Timelines

Permits and the order of work

Every addition needs a building permit with stamped structural drawings and energy calculations. The City’s review takes about 4 to 16 weeks, and a minor variance adds months before that.

  1. Lot, zoning and structure check: survey, zoning review and an engineer’s look at the existing foundation.
  2. Design and budget: floor plans and elevations, priced together so the design fits the budget.
  3. Approvals: a minor variance if needed, then the building permit.
  4. Foundation, framing and roof tie-in: the shell is built, closed in and joined to the house.
  5. Systems and finishes: heating and cooling, plumbing and electrical extended, then finishes matched to the existing house.
  6. Final inspection: the permit is closed.

Our post on how long a building permit takes in Toronto breaks the review stages down.

Low end or high end

What puts your addition at the low or the high end

Size, structure and approvals move the price more than finishes do.

FactorToward the low endToward the high end
SizeA larger addition spreads fixed costsA small bump-out still needs a foundation, roof and permit
StructureFoundation and walls carry a second storey as they areFootings or walls need reinforcing; new beams to open into the house
ApprovalsFits the zoning by-lawMinor variance, tree permit or heritage review
Heating and coolingThe existing furnace handles the extra spaceNew equipment and ductwork sized for the larger house
The existing houseUpdated wiring and plumbingKnob-and-tube wiring or old plumbing where the two meet
Site accessDriveway access to the backyardTight side yards; materials carried by hand
FinishesStock windows and standard sizesCustom windows, matched brick, higher ceilings

Opening the old exterior wall into the addition usually means removing part of a load-bearing wall; see load-bearing wall removal in Toronto for the beam, permit and cost. For a second storey, check Ontario ceiling height standards before choosing ceiling heights, since taller storeys count against the height limit.

Living with it

Living at home and paying for an addition

With a rear addition, most families stay at home. With a second storey, plan to move out for at least part of the job.

The noisy foundation and framing work for a rear addition happens outside, and the house is opened only near the end, behind a temporary dust wall. Our guide to living in your house during a renovation explains what that is like day to day.

Most homeowners pay with savings, a home equity line of credit or a refinance; some lenders offer construction draws tied to project stages. See financing a home renovation in Toronto.

Sources: City of Toronto building permit fees (2026); City of Toronto Zoning By-law 569-2013 and Committee of Adjustment; Ontario Building Code (O. Reg. 163/24). Construction costs are Route Homes planning estimates for November 2026, before HST; other ranges are published Toronto ranges for 2026.

Frequently asked questions

Home addition cost questions, answered

About $325 to $550 per square foot for construction in 2026, before HST: $325 to $375 at an economy finish, $375 to $450 at a standard finish and $450 to $550 at a luxury finish. Design, permits, a contingency and HST come on top.

For a 1,000 sq ft second storey on a bungalow, construction runs about $325,000 to $550,000 before HST. With design, permits, a minor variance, temporary housing, a 15% contingency and HST, a standard-finish second storey comes to about $516,000 to $637,000.

A 400 sq ft one-storey rear addition costs about $130,000 to $220,000 to build, before HST. A standard-finish one comes to about $213,000 to $264,000 all in, with design, permits, a 15% contingency and HST.

Yes. Every addition needs a building permit with stamped structural drawings. If it does not fit the zoning by-law, it also needs a minor variance from the Committee of Adjustment first.

The building permit review takes about 4 to 16 weeks. A minor variance, when one is needed, adds months before the permit can be issued.

Usually yes for a rear addition, since most of the work happens outside until the end. For a second storey, the roof comes off, so most families move out for part of the job.

Professional credentials
Accredited excellence. Trusted craftsmanship.

Recognized credentials and professional affiliations supporting Route Homes projects across Toronto and the GTA.

Your addition budget

Turn these addition ranges into your real number

The ranges on this page are approximate. Your free estimate starts with a zoning and structure check, and covers design, permits and construction by one team. See our home additions in Toronto service.