Interior renovation, 4,300 sq ft
Kitchens, main floors, ensuites, basements and second suites in Old Aurora, Aurora Heights, Aurora Highlands, the Hills of St. Andrew, Aurora Grove and Bayview Wellington. We plan around the Town of Aurora’s Zoning By-law 6000-17, its heritage district and the Oak Ridges Moraine.
Aurora grew outward from the old village at Yonge and Wellington. Where your house sits says a lot about its age and the renovation it needs.
How to read this table: find your area, then read across for the typical house and the work that suits it best.
| Area | Typical house | What we often find | Work that suits it |
|---|---|---|---|
| Old Aurora, around Yonge and Wellington | Older brick and frame houses, some in the heritage district | Older wiring and plumbing, low basements, heritage rules on the outside | Whole-house renovation, sensitive rear additions |
| Aurora Heights, Aurora Highlands | Postwar bungalows, side-splits and early two-storeys | Closed layouts, original kitchens, unfinished or low basements | Open main floor, kitchens, basement suites |
| Hills of St. Andrew and estate streets | Large houses on big, treed lots | Dated finishes, large mechanical systems, mature trees | Kitchens and ensuites, additions, renovate-or-rebuild studies |
| Aurora Grove, Bayview Wellington and newer areas | 1990s and later two-storeys | Builder kitchens and baths, tall unfinished basements | Kitchen and ensuite upgrades, finished basements, second suites |
Planning ranges from our home renovation cost guide, before HST. They are not a quote: the house, the structure and the finish decide the number.
The Andrew Residence in neighbouring Newmarket shows what an Aurora-area renovation can look like on a tight schedule. The owners were preparing to move into a 4,300 sq ft house, and we finished the whole interior in two and a half months in 2025: new flooring throughout, complete painting, a redesigned kitchen, upgraded washrooms and custom wall panels.
That pace is only possible when the scope, the selections and the permits are settled before the first day on site, which is how we plan every Aurora project.
Zoning By-law 6000-17 allows a second suite in a detached, semi-detached or link house, provided the zoning provisions are met. Provincial law also lets owners add additional residential units, so the options can be wider than many owners expect.
The building code sets the hard parts: fire separation between the units, a separate entrance, safe exits and ceiling height. We design to both, apply through the CityView Portal and book the Town’s inspections.
The Northeast Old Aurora Heritage Conservation District is protected under Part V of the Ontario Heritage Act. Inside it, exterior alterations, new construction and demolition need a heritage permit, reviewed by the Heritage Advisory Committee before Council; like-for-like repairs such as roofing and eavestroughs usually do not. Interior renovations normally need only a building permit.
Aurora’s Private Tree Protection By-law (5850-16) regulates cutting and injuring trees on private property, so a mature tree near new footings may need a Town permit first. Parts of town also sit on the Oak Ridges Moraine or inside the Lake Simcoe Region or Toronto and Region conservation authorities’ regulated areas, which can need their own permit. We check all three for your address at the first visit.
From one room to the whole house.
Builder and original kitchens replaced and walls opened with engineered beams.
Ensuites like the Andrew Residence, with frameless showers and freestanding tubs.
Finished basements and legal second suites under the Town’s zoning.
Older Aurora houses brought up to date in one project.
When a rebuild makes more sense on a large lot, we design and build the new house.
We see the house and check the zoning, heritage status, trees and conservation mapping.
Finishes and fixtures chosen before work starts, so the schedule holds.
Permit drawings by a BCIN-qualified designer, plus heritage, tree or conservation permits where needed.
Building permit applied for and paid through the Town’s CityView Portal.
Structure, rough-ins and insulation inspected by the Town before walls close.
Final walkthrough, deficiencies closed and a two-year workmanship warranty in writing.
For structural changes, new plumbing, additions, second suites and most layout changes, yes. You apply, pay and book inspections through the Town of Aurora’s CityView Portal. Cosmetic work usually does not need one.
Zoning By-law 6000-17 permits a second suite in detached, semi-detached and link houses, subject to its provisions. It also needs a building permit, fire separation, a separate entrance and safe exits.
Yes. Interior work usually needs only a building permit. Exterior alterations, additions, new construction and demolition need a heritage permit as well, reviewed by the Heritage Advisory Committee.
Possibly. The Private Tree Protection By-law (5850-16) regulates cutting and injuring trees on private property. We confirm with the Town whether your tree needs a permit before design is final.
Only if your lot is inside the moraine or a conservation authority’s regulated area. Interior renovations rarely are affected; additions and grading can be. We check the mapping at the first visit.
About $100 to $150 per sq ft at an economy finish, $150 to $250 standard and $250 to $450 luxury, before HST. Additions run about $325 to $550 per sq ft.
Send the address and a few photos. We will check the zoning, heritage status, trees and conservation mapping, then visit to talk through the options and the budget.